SANDRESM1 | Project Area 1 Archive

SANDRESM1 | Project Area 1 Archive

Click a topic, or press the enter key on a topic, to reveal its answer.

Advisories

Overnight Soil Testing in East River Park Track Area and in the Vicinity of Fiel 6 | Chinese
Soil testing will require the overnight closure of the East River Park Track and Field area and Field 6 for about one week. The Track area and Field 6 will remain open during normal park hours, though some testing may be conducted in limited areas during the day. Noise and air monitors are in place.

No Parking: FDR Drive SB Service Road at E. 6th Street | Chinese
To facilitate the upgrade of utility lines, curbside parking restrictions will be in effect. “No Parking” signs will be posted by the contractor throughout the affected area. Sidewalk access may be temporarily limited. One lane of traffic and access to buildings will be maintained at all times. To avoid possible towing of your vehicle, please make a note of the signs posted.

Floodwall Operations Resume at Montgomery Street and South Street | Spanish | Chinese
Beginning June 1st, 2024, Ongoing for about six months
Floodwall operations will resume at Montgomery Street and South Street and will extend towards Water Street. This operation will necessitate a sidewalk closure along Montgomery St, between Water Street and South Street and a partial sidewalk closure on South Street at the corner of Montgomery St. (Building access will remain on South St.) Vehicle lane width reductions will occur on South St. and Montgomery Street. Please follow all signs and directions placed on-site to ensure safety.

FDR Northbound Rolling Closures at Houston Street
February 13th & 14th, 2025
10:00 PM to 5:00 AM

Rolling closures will be implemented for the purpose of installing monitoring devices on the parapet walls of the FDR NB ramps at Houston Street. This includes the exit ramp from NB FDR at Houston Street, and the entrance ramp to NB FDR at Houston Street. Vehicles should follow all posted signs and Traffic Enforcement Agents.

Overnight FDR Drive Intermittent Traffic Stoppages | Spanish | Chinese
Saturday, January 25, 2025
1:00am to 7:00am

Overnight northbound & southbound FDR Drive intermittent traffic stoppages will be required to facilitate the transport of heavy construction equipment between East River Park and Corlears Hook Park. These intermittent stoppages will require single lane closures in addition to complete stoppages for a maximum of five (5) minutes each. Vehicles should follow all posted signs and Traffic Enforcement Agents.

Con Edison Nightwork: FDR Drive at Grand Street | Spanish | Chinese
December 2024 and January 2025 (on pause from December 23, 2024 to January 3, 2025)
Con Edison gas main and electrical conduit construction will require overnight work hours across the FDR drive beginning at Grand Street and ending in East River Park. Partial FDR Drive closures will be in effect during this time. Grand Street and FDR Drive Service Road will remain open. Please follow detours and all on-site signage to ensure safety. Noise & air quality monitors are in place.

Overnight FDR Drive Intermittent Traffic Stoppages | Spanish | Chinese
Saturday, January 11, 2025
1:00am to 7:00am

Overnight northbound & southbound FDR Drive intermittent traffic stoppages will be required to facilitate the transport of heavy construction equipment between East River Park and Corlears Hook Park. These intermittent stoppages will require single lane closures in addition to complete stoppages for a maximum of five (5) minutes each. Vehicles should follow all posted signs and Traffic Enforcement Agents.

Microtunneling  Operations Begin in East River Park Near the E. 10th Street Bridge | Spanish | Chinese
December 9, 2024
Full Road Closure at  E. 10th Street between Traffic Circle and FDR Drive Service Road
December 10 - 13, 2024
from 7:00 am to 6:00 pm
Microtunneling  operations, which will facilitate the placement of a 42" inch sewer line  underneath the FDR Drive, will begin in East River Park in the vicinity of the  E. 10th Street Bridge and will end at the FDR Drive Service Road at E. 10th  Street.

  • Pedestrian access in the park and via the E. 10th Street Bridge will be  maintained.
  • Limited  parking in effect at E. 10th Street and FDR Drive Service Road during road  closure.
  • Follow  directional signage. Noise and air monitors are in place.

Daytime Road & Sidewalk Closure: E. 10th St. at FDR Drive Service Rd. | Spanish | Chinese
Restarting Monday, July 15, 2024, ongoing for 6 months from 7:00 AM - 3:30 PM
Microtunneling work will require the full closure of East 10th Street at the FDR Service Road. During work hours the road and south sidewalk will be closed. Access will be restored at the end of each work day. This operation will also limit street parking on East 10th Street between FDR Drive and Avenue D. Please follow all signage and flaggers on-site to ensure safety.

Microtunneling Activities Continue in E. 10th Street Shared Use Path Area of East River Park | Spanish | Chinese
Starting Friday, March 1st, 2024. Ongoing until further notice.
The Shared Use Path work zone has been extended within East River Park north to the E. 10th St. Bridge to accommodate current microtunneling operations, which will facilitate the placement of a 42" inch sewer line underneath the FDR Drive. Pedestrian access will be maintained. Follow directional signage. Noise and air monitors are in place.

Overnight Closure of FDR Drive South Service Road and Sidewalk at Delancey St. | Spanish | Chinese
Wednesday, November 16 to Wednesday, November 22, 2024
10:00pm to 10:00am

The FDR Drive South Service Rd. & sidewalk at Delancey St. will require an overnight closure for required work on the Delancey Street Bridge. Local vehicular access for the East River Housing parking lot will be maintained. Noise & air quality monitors are in place. Please follow detours and all on-site signage to ensure safety.

Nightwork: FDR Drive Full Closure from Fulton St. to E. Houston St.
Saturday, October 19, 2024 at 11:00pm to Sunday, October 20, 2024 at 10:00am
The installation of the new Corlears Hook Bridge will necessitate overnight work and a full closure of the FDR Drive northbound and southbound between Exit 2 (Brooklyn Bridge, Manhattan Civic Center) and Exit 5 (E. Houston Street, Williamsburg Bridge). Vehicles should follow all posted signs and Traffic Enforcement Agents.

Nightwork under FDR Drive from Gouverneur Slip West to Jackson Street | Spanish | Chinese
Beginning September 3, 2024, 10:00pm to 5:00am, ongoing for about one month
Floodwall operations under the FDR Drive will require overnight work hours. Vehicle lane width reductions will continue on South Street and Montgomery Street. A closure of up to two northbound lanes of the FDR Drive will occur overnight. Please follow all signs and on-site directions to ensure safety.

Overnight Partial Closure of FDR Drive, FDR Drive South Service Road and Sidewalk at Delancey Street | Spanish | Chinese
Saturday, July 20, 2024, 10 PM until 7AM
The FDR Drive South Service Road and sidewalk at Delancey Street, south to Grand Street will require an overnight closure for Delancey Street Pedestrian Bridge construction activities. Two southbound lanes of FDR Drive in the construction area will also be temporarily closed during this time. Noise and air quality monitors are in place. Please follow detour and all signage on-site to ensure safety.

Micro-tunneling Activities Begin at E. 10th Street Shared Use Path Area of East River Park | Spanish | Chinese
Starting Friday, March 1, 2024, ongoing for about four months
The Shared Use Path work zone has been extended within East River Park north to the E. 10th St. Bridge to accommodate upcoming micro-tunneling operations, which will facilitate the placement of a 42" inch sewer line underneath the FDR Drive. Pedestrian access will be maintained. Follow directional signage. Noise and air monitors are in place. Additional information to follow when operations begin on the FDR Service Road at E. 10th Street.

Daytime Road & Sidewalk Closure: E. 10th St. at FDR Drive Service Rd. | Spanish | Chinese
Monday, July 1st, 2024, 7:00 AM - 3:30 PM
Local watermain relocation will require the full closure of East 10th Street at the FDR Service Road. During work hours the road and south sidewalk will be closed. Access will be restored at the end of the work day. This operation will also limit street parking on East 10th Street between FDR Drive and Avenue D. Please follow all signage and flaggers on-site to ensure safety.

Nightwork: FDR Drive Full Closure from Fulton Street to E. Houston Street | Spanish | Chinese
Saturday, June 8, 2024 at 11:00 PM to Sunday, June 9, 2024 at 8:00 AM
Installation of the new Delancey Street Pedestrian Bridge and overhead sign structure removal activities will necessitate a full closure of the FDR Drive northbound and southbound between Exit 2 (Brooklyn Bridge, Manhattan Civic Center) and Exit 5 (E. Houston Street, Williamsburg Bridge). Vehicles should follow all posted signs and instructions from Traffic Enforcement Agents.

Temporary Partial Closure of FDR Drive South Service Road and Delancey St. South | Spanish | Chinese
Thursday, June 6, 2024 at 7 AM until Monday, June 10, 2024 at 10 AM
Delancey Street S. eastbound from Mangin Street to the FDR Drive Service Road, as well as the FDR Drive Service Road at Delancey Street, will require a temporary closure for the mobilization and demobilization of construction equipment related to the placement of the new Delancey Street Pedestrian Bridge. Please follow all signage on-site to ensure safety.

Daytime Road and Sidewalk Closures: E. 10th St. and FDR Service Road | Spanish | Chinese
May 13, 2024, ongoing for approximately 6 months.
Sewer work and related microtunneling activities require the full closure of East 10th Street at the FDR Service Road. During work hours (7:00am-3:30pm) the road and south sidewalk will be closed. Access will be restored at the end of each work day. Work will also limit street parking East 10th Street between FDR Drive and Avenue D. Please follow all signage and flaggers on-site to ensure safety.

Pedestrian Access Reopened at FDR Drive Service Road
Updated March 15, 2024, ongoing until further notice
A pedestrian accessway on the FDR Service Road has been put in place, following a previous sidewalk closure. The closure of the south sidewalk at Delancey St. from FDR Dr. to Baruch Drive is still in effect. The north sidewalk remains accessible. Access to East River Housing parking lot will be maintained. Street parking is limited. Please follow all signage on-site to ensure safety.

Utility Work Continues at E. 10th Street between FDR Drive and Avenue D | Spanish | Chinese
Updated February 23, 2024, ongoing until further notice
Phased upgrades of utility lines continue under the ESCR project contract. Parking restrictions and a partial sidewalk closure will be in effect during this operation and will be communicated through on-site signage. Access to and from Jacob Riis Houses' Management Office will be maintained. One lane of traffic will be maintained at all times. See Advisory for map.

Sidewalk Closure at Delancey Street and FDR Drive | Spanish | Chinese
Ongoing until further notice
Construction activities will extend the closure of the sidewalk at Delancey St. from FDR Dr. to Baruch Dr. Traffic and access to East River Housing parking lot will be maintained. Pedestrian detour is in effect and street parking is limited. Please follow all signage on-site to ensure safety.

Con Edison Utility Work at E. 10th Street between FDR Drive and Avenue DE. | Spanish | Chinese
Starting week of May 2, 2022
Con Edison will begin phased upgrades of their utility lines under the ESCR project contract. Parking restrictions will be in effect during this operation and will be communicated through on-site signage. One lane of traffic will be maintained at all times. See Advisory for map.

Continuation of Nightwork: E. Houston St. Overpass | Spanish | Chinese
Starting the week of December 11, 2023, weekdays 3:00pm to 11:59pm, for approximately one month.
Pile installation activities will necessitate extending working hours at the E. Houston St. North Ramp. Noise and air monitors are in place.

Con Edison Utility Work in East River Park at Greenway Continues North | Spanish | Chinese
Ongoing until further notice
Under the ESCR project, Con Edison utility line upgrade work continues in ERP along the Greenway north to E. 10th Street. Park access points are located at E. Houston, E. 6th and E. 10th Streets pedestrian bridges. Access to Track & Field and restroom areas will be maintained. Please follow onsite signage.

FDR Drive Northbound Montgomery St. Entrance On-Ramp Closure | Spanish | Chinese
Wednesday November 15, 2023, through Friday November 16, 2023, 12:00 am to 6:00 am daily
Construction activities will necessitate the closure of the FDR Drive northbound Montgomery Street entrance on-ramp. Traffic on FDR Drive will be maintained. Vehicles should follow the detour and on-site instruction while closures are in effect.

Continuation of Nightwork: E. Houston St. Overpass
Starting on or about November 6, 2023, Weekdays 3:00 pm to 11:59 pm for approximately 3 weeks
Pile installation activities will necessitate extended working hours at the E. Houston Street overpass north ramp, noise and air monitors are in place.

Continuation of Nightwork: E. Houston St. Overpass | Spanish
Starting on or about October 25, 2023, Weekdays 3:00 pm to 11:59 pm for approximately 2 weeks
Construction activities will necessitate extended working hours at the E. Houston Street overpass north ramp, noise and air monitors are in place.

FDR Drive Northbound Montgomery St. Entrance On-Ramp Closure | Spanish | Chinese
On Friday August 25, 2023, 10:00 pm to 6:00 am
Construction activities will necessitate the closure of the FDR Drive northbound Montgomery Street entrance on-ramp. Traffic on FDR Drive will be maintained. Vehicles should follow the detour and on-site instruction while closures are in effect.

Nightwork: East River Park South of Fire Boat House | Spanish | Chinese
Starting the week of of August 21, 2023, Weekdays 3:00 pm to 11:59 pm for approximately two weeks
Construction activities will necessitate extended work hours in East River Park south of the Fire Boat House. This operation is anticipated to continue through the summer as required. An advisory will be sent before each work occurrence. Noise and air monitors are in place.

Water Main Replacement South St. between Clinton St. and Gouverneur Slip E. | Spanish | Chinese

  • One overnight test shutdown the week of June 5th: 10:00pm – 10:00am
  • More information to follow for the watermain replacement shutdown
These temporary water main shutdowns are necessary to facilitate the replacement of a 12" water main. Official DEP notices with instructions will be provided before any service interruptions to affected buildings. For your safety, please follow on-site signage and flaggers.

Nightwork: East River Park Construction Area & E. Houston St. Overpass | Spanish | Chinese
Starting the week of June 5, 2023, Weekday 3:00 pm to 11:59 pm for approximately one month
Construction activities will necessitate extended working hours in East River Park south of Stanton Street, and E. Houston Street overpass south ramp. Noise and air monitors will be in place prior to the start of these activities.

New Access Pattern for E. Houston St. Overpass at East River Park | Spanish | Chinese
Starting week of May 8, 2023, Ongoing until further notice
Ongoing construction activity in East River Park will necessitate closure of the E. Houston St. south ramp, overpass south sidewalk, and a portion of the Greenway. The north ramp will be opened for park access. Pedestrians use Baruch Dr. crosswalk for access. Park amenities will not be impacted. Please follow the Site Access Plan and on-site signage.

Nightwork for E. Houston St. Overpass work | Spanish | Chinese
Starting the week of May 8, 2023, Weekday 3:00pm to 11:00 pm, for approximately a month
Construction activities will necessitate nightwork at E. Houston Street overpass south ramp. Please follow signage and the new access pattern shown below. See the New Access Pattern advisory for additional information.

Limited Parking: FDR Service Rd, between E. 6th St. and E. 8th St. | Spanish | Chinese
Monday, March 20, 2023 to Mid-April
Construction activities will necessitate these temporary parking restrictions. Please follow all posted signs.

Temporary Corlears Hook Pedestrian Bridge and Passive Lawn Closure | Spanish | Chinese
Monday, April 17, 2023, 6:00am through Wednesday, April 19, 2023, 5:00pm – Shuttle Services will be provided.
Ongoing construction activity in East River Park will necessitate a temporary closure of the Corlears Hook Pedestrian Bridge and the East River Park passive lawn. Corlears Hook Park, Pier 42 and Corlears Hook Ferry service will not be impacted. Shuttle service will be provided for Ferry users between Pier 36 and Corlears Hook Park. See the Shuttle Schedule to plan ahead. Please follow all posted signs.

Partial Road Closure of FDR Drive Service Road between Delancey and Grand Streets | Spanish | Chinese
Overnight Friday, March 31, 2023 from 10:00 pm to 10:00 am
A temporary water main shutdown will necessitate the partial closure of the FDR Drive Service Road between Delancey and Grand Streets. The traffic detour below will be in effect, please follow posted detour signs to ensure safety. See the pedestrian detour advisory for additional information.

Nightwork: Floodwall Operations at NB FDR Dr. from Montgomery St. to Cherry St. | Spanish | Chinese
Starting week of July 18, 2022, 10:00 pm to 5:30 am, ongoing for several months
To facilitate construction of the floodwall, preparation activities for pile install will necessitate overnight work with FDR lane closures. After preparation activities, overnight pile install will begin. Noise monitors are in place. FDR onramp Exit #3 northbound entrance (Montgomery Street) will remain open unless otherwise indicated. See weekly bulletin for more information.

East River Park Ballfield #3 Partial Temporary Closure and Pedestrian Detour | Spanish | Chinese
Starting week of January 3, 2023, for approximately 2 months
Construction activities critical to the completion of Phase 1 work will necessitate a partial temporary closure of Ballfield #3. Pedestrian access to the esplanade and other park amenities will be maintained via pedestrian detour. Please follow onsite signage while closures are in effect to ensure safety. See the Site Access Plan for more details.

Weekend Work: FDR Drive Exit 3 Northbound Entrance Closure (Montgomery Street) | Spanish | Chinese
Sunday, March 12, 2023 5:00 am - 12:00 pm
Construction activities will necessitate the closure of the FDR Drive Exit 3 northbound entrance (Montgomery Street) on-ramp and partial drive lane. Traffic on FDR Drive will be maintained. Vehicles should follow posted signs and on-site instruction while closures are in effect.

Partial Road Closure of FDR Drive Service Road between Delancey and Grand Streets
Overnight Saturday, January 28, 2023 and Saturday, February 4, 2023 from 10:00 pm to 10:00 am
A temporary water main shutdown will necessitate the partial closure of the FDR Drive Service Road between Delancey and Grand Streets. A traffic detour will be in effect, please follow posted detour signs to ensure safety. See the pedestrian detour advisory for additional information.

Nightwork: FDR Drive Exit 3 Northbound Entrance Closure (Montgomery Street) | Spanish | Chinese
Starting week of January 9, 2023, for approximately 2 weeks
Construction activities will necessitate the closure of the FDR Drive Exit 3 northbound entrance (Montgomery Street) on-ramp and partial drive lane. Traffic on FDR Drive will be maintained. Vehicles should follow posted signs and on-site instruction while closures are in effect.

6th Street Pedestrian Bridge Temporary Closure | Spanish | Chinese
Work completed 10/31/2022
Ongoing Con Edison utility work in East River Park at the Greenway will necessitate a temporary closure of the E. 6th Street Bridge. All park amenities will remain open. Access the park from E. Houston St. and the E. 10th St. Pedestrian Bridge. Pedestrian detour in effect. Please follow all posted signs.

E. 6th Street Pedestrian Bridge Temporary Closure | Spanish | Chinese
Wednesday August 3, 2022 to Friday August 5, 2022
Ongoing Con Edison utility work in East River Park at the Greenway will necessitate a temporary closure of the E. 6th Street Bridge. All park amenities will remain. Access the park from E. Houston St. and the E. 10th St. Pedestrian Bridge. Pedestrian detour in effect. Please follow all posted signs.

Nightwork: Corlears Hook Bridge Removal Activities and FDR Drive Lane Closures Continue | Spanish | Chinese
Week of July 18, 2022 10:00 pm to 5:30 am
Corlears Hook Bridge removal activities will necessitate overnight work and lane closures of the FDR Drive northbound and southbound between Montgomery Street and E. Houston Street. Vehicles should follow all posted signs. Noise monitors are in place.

Nightwork: FDR Drive Full Closure from Fulton Street to E. Houston Street | Spanish | Chinese
Sunday, July 10, 2022, 12:01 am – 10:00 am
Corlears Hook Bridge removal activities will necessitate overnight work and full closure of the FDR Drive northbound and southbound between Exit 2 (Brooklyn Bridge, Manhattan Civic Center) and Exit 5 (E. Houston Street, Williamsburg Bridge). Vehicles should follow all posted signs and Traffic Enforcement Agents while detour is in effect.

Partial closure of Corlears Hook Park | Spanish | Chinese
Starting April 4, 2022, ongoing until further notice
Construction activities will necessitate the closure of portions of Corlears Hook Park, including the flagpole area.
To access open park areas use entrances at Jackson Street and west entrances on Cherry Street. For public access to ferry, use Corlears Hook Bridge. Please follow all on-site signage while closures are in effect to ensure safety. Noise and air monitors are in place.

Nightwork: FDR Drive Full Closure from Fulton Street to E. Houston Street) | Spanish | Chinese
Sunday, June 5, 2022, 12:01 am – 10:00 am
The temporary bridge installation operation at Corlears Hook will necessitate overnight work and full closure of the FDR Drive northbound and southbound between Exit 2 (Brooklyn Bridge, Manhattan Civic Center) and Exit 5 (E. Houston Street, Williamsburg Bridge). Vehicles should follow all posted signs and Traffic Enforcement Agents while detour is in effect.

Nightwork: FDR Drive Exit 3 Northbound Entrance Closure (Montgomery Street) | Spanish | Chinese
Starting the week of March 28, 2022, 11:00 pm to 5:00 am for approximately two weeks
Construction activities will necessitate the closure of the FDR Drive Exit 3 northbound entrance (Montgomery Street). Traffic on FDR Drive will be maintained. Vehicles should follow all posted signs and on-site instruction while closures are in effect to ensure safety.

Nightwork: FDR Drive Full Closure from Fulton Street to E. Houston Street | Spanish | Chinese
On Sunday, March 27, 2022, 12:01 am – 10:00am
Delancey Street Pedestrian Bridge removal activities will necessitate overnight work and full closure of the FDR Drive northbound and southbound between Exit 2 (Brooklyn Bridge Manhattan Civic Center) and Exit 5 (E. Houston Street, Williamsburg Bridge). Vehicles should follow all posted signs and instruction from Traffic Enforcement Agents while detour is in effect.

Nightwork continues for Delancey Street Bridge Work | Spanish | Chinese
Starting the week of March 7, 2022, Weekdays 10:00 pm to 5:00 am and possible weekends 12:01 am to 11:00 am through the month of March
Construction activities will necessitate overnight work hours to dismantle the Delancey Street Pedestrian Bridge over the FDR Drive. The work may necessitate FDR lane closures - traffic will be maintained. Noise and air monitors are in place. Refer to weekly Construction Bulletins.

Delancey Street Bridge Removal Work to begin | Spanish | Chinese
Starting the week of January 24, 2022 Ongoing for approximately 4 weeks at various times – see weekly Bulletin
Construction operations necessitate varied work hours to dismantle the Delancey Street Pedestrian Bridge. Park-side hours may include daytime and night (3pm-11:59pm) shifts. Community-side work will occur between 9am – 5pm. Refer to weekly Construction Bulletins. Noise and air monitors are in place.

Nightwork will begin in East River Park at Delancey Street | Spanish | Chinese
Starting the week of January 24, 2022
Ongoing between the hours of 3:00pm to 11:59pm for approximately 4 weeks. Construction operations necessitate extended work hours to dismantle the park-side ramp of the Delancey Street Pedestrian Bridge. Noise and air monitors will be in place prior to the start of these activities.

Passive Lawn Installation in East River Park
Starting the week of October 25, 2021, the East River Park's compost area will be converted into a passive lawn space as construction in East River Park begins. The new passive lawn area will provide public recreation space during ESCR construction. Construction will take place from mid-October through mid-November 2021.

Brian Watkins Tennis Center Closure
Starting Monday, November 01, 2021, to facilitate the construction of the ESCR project, the tennis center will begin a phased closure. Four (4) tennis courts on the north side and the tennis center will remain open through the end of the 2021 permit season on November 21, 2021. All tennis courts and the tennis center including restrooms, will be closed until 2024, subject to change. For additional information on park interim recreation visit Parks Neighborhood Recreational Resources pages which can be found on the ESCR homepage: www.nyc.gov/escr

Weekly Construction Bulletin

PA1 Construction Bulletin - Week of April 18, 2025
Anticipated work schedule for 04/18/2025 to 05/03/2025

PA1 Construction Bulletin - Week of April 11, 2025
Anticipated work schedule for 04/11/2025 to 04/28/2025

PA1 Construction Bulletin - Week of April 4, 2025
Anticipated work schedule for 04/04/2025 to 04/19/2025

PA1 Construction Bulletin - Week of March 28, 2025
Anticipated work schedule for 03/28/2025 to 04/12/2025

PA1 Construction Bulletin - Week of March 21, 2025
Anticipated work schedule for 03/21/2025 to 04/05/2025

PA1 Construction Bulletin - Week of March 14, 2025
Anticipated work schedule for 03/14/2025 to 03/29/2025

PA1 Construction Bulletin - Week of March 7, 2025
Anticipated work schedule for 03/07/2025 to 03/22/2025

PA1 Construction Bulletin - Week of February 28, 2025
Anticipated work schedule for 02/28/2025 to 03/15/2025

PA1 Construction Bulletin - Week of February 21, 2025
Anticipated work schedule for 02/21/2025 to 03/08/2025

PA1 Construction Bulletin - Week of February 14, 2025
Anticipated work schedule for 02/14/2025 to 03/01/2025

PA1 Construction Bulletin - Week of February 7, 2025
Anticipated work schedule for 02/07/2025 to 02/22/2025

PA1 Construction Bulletin - Week of January 31, 2025
Anticipated work schedule for 01/31/2025 to 02/15/2025

PA1 Construction Bulletin - Week of January 24, 2025
Anticipated work schedule for 01/24/2025 to 02/08/2025

PA1 Construction Bulletin - Week of January 17, 2025
Anticipated work schedule for 01/17/2025 to 02/01/2025

PA1 Construction Bulletin - Week of January 10, 2025
Anticipated work schedule for 01/10/2025 to 01/25/2025

PA1 Construction Bulletin - Week of January 3, 2025
Anticipated work schedule for 01/03/2025 to 01/18/2025

PA1 Construction Bulletin - Week of December 27, 2024
Anticipated work schedule for 12/27/2024 to 01/11/2025

PA1 Construction Bulletin - Week of December 20, 2024
Anticipated work schedule for 12/20/2024 to 01/04/2025

PA1 Construction Bulletin - Week of December 13, 2024
Anticipated work schedule for 12/13/2024 to 12/28/2024

PA1 Construction Bulletin - Week of December 6, 2024
Anticipated work schedule for 12/06/2024 to 12/21/2024

PA1 Construction Bulletin - Week of December 2, 2024
Anticipated work schedule for 11/27/2024 to 12/14/2024

PA1 Construction Bulletin - Week of November 22, 2024
Anticipated work schedule for 11/22/2024 to 12/07/2024

PA1 Construction Bulletin - Week of November 15, 2024
Anticipated work schedule for 11/15/2024 to 11/30/2024

PA1 Construction Bulletin - Week of November 8, 2024
Anticipated work schedule for 11/08/2024 to 11/23/2024

PA1 Construction Bulletin - Week of November 1, 2024
Anticipated work schedule for 11/01/2024 to 11/16/2024

PA1 Construction Bulletin - Week of October 25, 2024
Anticipated work schedule for 10/25/2024 to 11/09/2024

PA1 Construction Bulletin - Week of October 18, 2024
Anticipated work schedule for 10/18/2024 to 11/02/2024

PA1 Construction Bulletin - Week of October 11, 2024
Anticipated work schedule for 10/11/2024 to 10/26/2024

PA1 Construction Bulletin - Week of October 4, 2024
Anticipated work schedule for 10/04/2024 to 10/19/2024

PA1 Construction Bulletin - Week of September 27, 2024
Anticipated work schedule for 09/27/2024 to 10/12/2024

PA1 Construction Bulletin - Week of September 20, 2024
Anticipated work schedule for 09/20/2024 to 10/05/2024

PA1 Construction Bulletin - Week of September 13, 2024
Anticipated work schedule for 09/13/2024 to 09/28/2024

PA1 Construction Bulletin - Week of September 6, 2024
Anticipated work schedule for 09/06/2024 to 09/21/2024

PA1 Construction Bulletin - Week of August 30, 2024
Anticipated work schedule for 08/30/2024 to 09/14/2024

PA1 Construction Bulletin - Week of August 23, 2024
Anticipated work schedule for 08/23/2024 to 09/07/2024

PA1 Construction Bulletin - Week of August 16, 2024
Anticipated work schedule for 08/16/2024 to 08/31/2024

PA1 Construction Bulletin - Week of August 9, 2024
Anticipated work schedule for 08/09/2024 to 08/24/2024

PA1 Construction Bulletin - Week of August 2, 2024
Anticipated work schedule for 08/02/2024 to 08/17/2024

PA1 Construction Bulletin - Week of July 26, 2024
Anticipated work schedule for 07/26/2024 to 08/10/2024

PA1 Construction Bulletin - Week of July 19, 2024
Anticipated work schedule for 07/19/2024 to 08/03/2024

PA1 Construction Bulletin - Week of July 12, 2024
Anticipated work schedule for 07/12/2024 to 07/27/2024

PA1 Construction Bulletin - Week of July 5, 2024
Anticipated work schedule for 07/05/2024 to 07/20/2024

PA1 Construction Bulletin - Week of June 28, 2024
Anticipated work schedule for 06/28/2024 to 07/13/2024

PA1 Construction Bulletin - Week of June 21, 2024
Anticipated work schedule for 06/21/2024 to 07/06/2024

PA1 Construction Bulletin - Week of June 17, 2024
Anticipated work schedule for 06/14/2024 to 06/29/2024

PA1 Construction Bulletin - Week of June 10, 2024
Anticipated work schedule for 06/07/2024 to 06/22/2024

PA1 Construction Bulletin - Week of June 3, 2024
Anticipated work schedule for 06/03/2024 to 06/16/2024

PA1 Construction Bulletin - Week of May 27, 2024
Anticipated work schedule for 05/28/2024 to 06/09/2024

PA1 Construction Bulletin - Week of May 20, 2024
Anticipated work schedule for 05/20/2024 to 06/01/2024

PA1 Construction Bulletin - Week of May 13, 2024
Anticipated work schedule for 05/13/2024 to 05/24/2024

PA1 Construction Bulletin - Week of May 6, 2024
Anticipated work schedule for 05/06/2024 to 05/17/2024

PA1 Construction Bulletin - Week of April 27, 2024
Anticipated work schedule for 04/27/2024 to 05/10/2024

PA1 Construction Bulletin - Week of April 20, 2024
Anticipated work schedule for 04/20/2023 to 05/03/2024

PA1 Construction Bulletin - Week of April 13, 2024
Anticipated work schedule for 04/13/2023 to 04/26/2024

PA1 Construction Bulletin - Week of April 6, 2024
Anticipated work schedule for 04/06/2024 to 04/19/2024

PA1 Construction Bulletin - Week of March 30, 2024
Anticipated work schedule for 03/30/2023 to 04/12/2024

PA1 Construction Bulletin - Week of March 23, 2024
Anticipated work schedule for 03/23/2023 to 04/05/2024

PA1 Construction Bulletin - Week of March 16, 2024
Anticipated work schedule for 03/16/2023 to 03/29/2024

PA1 Construction Bulletin - Week of March 9, 2024
Anticipated work schedule for 03/09/2023 to 03/22/2024

PA1 Construction Bulletin - Week of March 2, 2024
Anticipated work schedule for 03/02/2023 to 03/15/2024

PA1 Construction Bulletin - Week of February 24, 2024
Anticipated work schedule for 02/24/2023 to 03/08/2024

PA1 Construction Bulletin - Week of February 19, 2024
Anticipated work schedule for 02/16/2023 to 03/02/2024

PA1 Construction Bulletin - Week of February 10, 2024
Anticipated work schedule for 02/10/2023 to 02/23/2024

PA1 Construction Bulletin - Week of February 3, 2024
Anticipated work schedule for 02/03/2023 to 02/16/2024

PA1 Construction Bulletin - Week of January 27, 2024
Anticipated work schedule for 01/27/2023 to 02/09/2024

PA1 Construction Bulletin - Week of January 20, 2024
Anticipated work schedule for 01/20/2023 to 02/02/2024

PA1 Construction Bulletin - Week of January 13, 2024
Anticipated work schedule for 01/13/2023 to 01/27/2024

PA1 Construction Bulletin - Week of January 6, 2024
Anticipated work schedule for 01/06/2023 to 01/20/2024

PA1 Construction Bulletin - Week of December 30, 2023
Anticipated work schedule for 12/30/2023 to 01/12/2024

PA1 Construction Bulletin - Week of December 23, 2023
Anticipated work schedule for 12/23/2023 to 01/06/2024

PA1 Construction Bulletin - Week of December 15, 2023
Anticipated work schedule for 12/15/2023 to 12/30/2023

PA1 Construction Bulletin - Week of December 9, 2023
Anticipated work schedule for 12/09/2023 to 12/23/2023

PA1 Construction Bulletin - Week of December 2, 2023
Anticipated work schedule for 12/02/2023 to 12/16/2023

PA1 Construction Bulletin - Week of November 25, 2023
Anticipated work schedule for 11/25/2023 to 12/09/2023

PA1 Construction Bulletin - Week of November 18, 2023
Anticipated work schedule for 11/18/2023 to 12/02/2023

PA1 Construction Bulletin - Week of November 11, 2023
Anticipated work schedule for 11/11/2023 to 11/25/2023

PA1 Construction Bulletin - Week of November 4, 2023
Anticipated work schedule for 11/04/2023 to 11/18/2023

PA1 Construction Bulletin - Week of October 27, 2023
Anticipated work schedule for 10/27/2023 to 11/11/2023

PA1 Construction Bulletin - Week of October 20, 2023
Anticipated work schedule for 10/20/2023 to 11/04/2023

PA1 Construction Bulletin - Week of October 13, 2023
Anticipated work schedule for 10/13/2023 to 10/28/2023

PA1 Construction Bulletin - Week of October 7, 2023
Anticipated work schedule for 10/07/2023 to 10/20/2023

PA1 Construction Bulletin - Week of October 30, 2023
Anticipated work schedule for 09/30/2023 to 10/13/2023

PA1 Construction Bulletin - Week of September 23, 2023
Anticipated work schedule for 09/23/2023 to 10/06/2023

PA1 Construction Bulletin - Week of September 16, 2023
Anticipated work schedule for 9/16/2023 to 9/30/2023

PA1 Construction Bulletin - Week of September 9, 2023
Anticipated work schedule for 9/9/2023 to 9/23/2023

PA1 Construction Bulletin - Week of September 1, 2023
Anticipated work schedule for 09/02/2023 to 09/16/2023

PA1 Construction Bulletin - Week of August 26, 2023
Anticipated work schedule for 08/26/2023 to 09/09/2023

PA1 Construction Bulletin - Week of August 19, 2023
Anticipated work schedule for 8/19/2023 to 9/2/2023

PA1 Construction Bulletin - Week of August 12, 2023
Anticipated work schedule for 8/12/2023 to 8/25/2023

PA1 Construction Bulletin - Week of August 4, 2023
Anticipated work schedule for 8/4/2023 to 8/19/2023

PA1 Construction Bulletin - Week of July 28, 2023
Anticipated work schedule for 7/28/2023 to 8/12/2023

PA1 Construction Bulletin - Week of July 21, 2023
Anticipated work schedule for 7/22/2023 to 8/05/2023

PA1 Construction Bulletin - Week of July 14, 2023
Anticipated work schedule for 7/14/2023 to 7/29/2023

PA1 Construction Bulletin - Week of July 7, 2023
Anticipated work schedule for 07/07/2023 to 07/22/2023

PA1 Construction Bulletin - Week of July 1, 2023
Anticipated work schedule for 07/01/2023 to 07/15/2023

PA1 Construction Bulletin - Week of June 24, 2023
Anticipated work schedule for 06/24/2023 to 07/08/2023

PA1 Construction Bulletin - Week of June 17, 2023
Anticipated work schedule for 06/17/2023 to 07/01/2023

PA1 Construction Bulletin - Week of June 10, 2023
Anticipated work schedule for 06/10/2023 to 6/24/2023

PA1 Construction Bulletin - Week of June 3, 2023
Anticipated work schedule for 06/03/2023 to 6/17/2023

PA1 Construction Bulletin - Week of May 27, 2023
Anticipated work schedule for 5/27/2023 to 6/10/2023

PA1 Construction Bulletin - Week of May 20, 2023
Anticipated work schedule for 5/20/2023 to 6/3/2023

PA1 Construction Bulletin - Week of May 13, 2023
Anticipated work schedule for 05/13/2023 to 05/27/2023

PA1 Construction Bulletin - Week of May 6, 2023
Anticipated work schedule for 05/06/2023 to 05/20/2023

PA1 Construction Bulletin - Week of April 28, 2023
Anticipated work schedule for 4/28/2023 to 5/12/2023

PA1 Construction Bulletin - Week of April 22, 2023
Anticipated work schedule for 4/22/2023 to 5/06/2023

PA1 Construction Bulletin - Week of April 15, 2023
Anticipated work schedule for 4/15/2023 to 4/29/2023

PA1 Construction Bulletin - Week of April 8, 2023
Anticipated work schedule for 4/8/2023 to 4/23/2023

PA1 Construction Bulletin - Week of April 1, 2023
Anticipated work schedule for 4/1/2023 to 4/15/2023

PA1 Construction Bulletin - Week of March 25, 2023
Anticipated work schedule for 03/25/2023 to 04/18/2023

PA1 Construction Bulletin - Week of March 18, 2023
Anticipated work schedule for 03/18/2023 to 04/01/2023

PA1 Construction Bulletin - Week of March 11, 2023
Anticipated work schedule for 03/11/2023 to 03/25/2023

PA1 Construction Bulletin - Week of March 4, 2023
Anticipated work schedule for 03/04/2023 to 03/18/2023

PA1 Construction Bulletin - Week of February 25, 2023
Anticipated work schedule for 02/25/2023 to 03/11/2023

PA1 Construction Bulletin - Week of February 18, 2023
Anticipated work schedule for 02/18/2023 to 03/03/2023

PA1 Construction Bulletin - Week of February 11, 2023
Anticipated work schedule for 02/11/2023 to 02/25/2023

PA1 Construction Bulletin - Week of February 04, 2023
Anticipated work schedule for 2/4/2023 to 2/18/2023

PA1 Construction Bulletin - Week of January 28, 2023
Anticipated work schedule for 1/28/2023 to 2/11/2023

PA1 Construction Bulletin - Week of January 21, 2023
Anticipated work schedule for 1/21/2023 to 2/4/2023

PA1 Construction Bulletin - Week of January 14, 2023
Anticipated work schedule for 1/14/2023 to 1/27/2023

PA1 Construction Bulletin - Week of January 7, 2023
Anticipated work schedule for 01/7/2023 to 01/20/2023

PA1 Construction Bulletin - Week of January 2, 2023
Anticipated work schedule for 01/03/2023 to 01/14/2023

PA1 Construction Bulletin - Week of December 26, 2022
Anticipated work schedule for 12/27/2022 to 01/07/2023

PA1 Construction Bulletin - Week of December 19, 2022
Anticipated work schedule for 12/19/2022 to 12/30/2022

PA1 Construction Bulletin - Week of December 11, 2022
Anticipated work schedule for 12/11/2022 to 12/24/2022

PA1 Construction Bulletin - Week of December 3, 2022
Anticipated work schedule for 12/03/2022 to 12/17/2022

PA1 Construction Bulletin - Week of November 28, 2022
Anticipated work schedule 11/28/2022 to 12/10/2022

PA1 Construction Bulletin - Week of November 19, 2022
Anticipated work schedule for 11/19/2022 to 12/03/2022

PA1 Construction Bulletin - Week of November 12, 2022
Anticipated work schedule for 11/12/2022 to 11/26/2022

PA1 Construction Bulletin - Week of November 05, 2022
Anticipated work schedule for 11/05/2022 to 11/19/2022

PA1 Construction Bulletin - Week of October 29, 2022
Anticipated work schedule for 10/29/2022 to 11/12/2022

PA1 Construction Bulletin - Week of October 24, 2022
Anticipated work schedule for 10/22/2022 to 11/05/2022

PA1 Construction Bulletin - Week of October 15, 2022
Anticipated work schedule for 10/15/2022 to 10/28/2022

PA1 Construction Bulletin - Week of October 10, 2022
Anticipated work schedule for 10/08/2022 to 10/22/2022

PA1 Construction Bulletin - Week of October 1, 2022
Anticipated work schedule for 10/01/2022 to 10/14/2022

PA1 Construction Bulletin - Week of September 26, 2022
Anticipated work schedule for 09/24/2022 to 10/07/2022

PA1 Construction Bulletin - Week of September 17, 2022
Anticipated work schedule for 09/17/2022 to 09/30/2022

PA1 Construction Bulletin - Week of September 10, 2022
Anticipated work schedule for 09/10/2022 to 09/24/2022

PA1 Construction Bulletin - Week of September 5, 2022
Anticipated work schedule for 09/06/2022 to 09/17/2022

PA1 Construction Bulletin - Week of August 27, 2022
Anticipated work schedule for 08/27/2022 to 09/10/2022

PA1 Construction Bulletin - Week of August 20, 2022
Anticipated work schedule for 08/20/2022 to 09/03/2022

PA1 Construction Bulletin - Week of August 15, 2022M
Anticipated work schedule for 08/13/2022 to 08/27/2022

PA1 Construction Bulletin - Week of August 8, 2022
Anticipated work schedule for 08/06/2022 to 08/20/2022

PA1 Construction Bulletin - Week of August 1, 2022
Anticipated work schedule for 07/30/2022 to 08/13/2022

PA1 Construction Bulletin - Week of July 25, 2022
Anticipated work schedule for 07/23/2022 to 08/06/2022

PA1 Construction Bulletin - Week of July 18, 2022
Anticipated work schedule for 07/18/2022 to 07/29/2022

PA1 Construction Bulletin - Week of July 11, 2022
Anticipated work schedule for 07/10/2022 to 07/22/20222

PA1 Construction Bulletin - Week of July 04, 2022
Anticipated work schedule for 07/05/2022 to 07/15/2022

PA1 Construction Bulletin - Week of June 27, 2022
Anticipated work schedule for 06/25/2022 to 07/10/2022

PA1 Construction Bulletin - Week of June 20, 2022
Anticipated work schedule for 06/18/2022 to 07/01/2022

PA1 Construction Bulletin - Week of June 13, 2022
Anticipated work schedule for 06/13/2022 to 06/24/2022

PA1 Construction Bulletin - Week of June 5, 2022
Anticipated work schedule for 06/05/2022 to 06/17/2022

PA1 Construction Bulletin - Week of May 30, 2022
Anticipated work schedule for 05/31/2022 to 06/10/2022

PA1 Construction Bulletin - Week of May 23, 2022
Anticipated work schedule for 05/23/2022 to 06/05/2022

PA1 Construction Bulletin - Week of May 16, 2022
Anticipated work schedule for 05/14/2022 to 05/27/2022

PA1 Construction Bulletin - Week of May 09, 2022
Anticipated work schedule for 05/07/2022 to 05/20/2022

PA1 Construction Bulletin - Week of May 02, 2022
Anticipated work schedule for 04/30/2022 to 05/13/2022

PA1 Construction Bulletin - Week of April 25, 2022
Anticipated work schedule for 04/23/2022 to 05/06/2022

PA1 Construction Bulletin - Week of April 18, 2022
Anticipated work schedule for 04/18/2022 to 04/29/2022

PA1 Construction Bulletin - Week of April 11, 2022
Anticipated work schedule for 04/11/2022 to 04/22/2022

PA1 Construction Bulletin - Week of April 4, 2022
Anticipated work schedule for 04/04/2022 to 04/15/2022

PA1 Construction Bulletin - Week of March 28, 2022
Anticipated work schedule for 03/27/2021 to 04/08/2022

PA1 Construction Bulletin - Week of March 21, 2022
Anticipated work schedule for 03/21/2021 to 04/01/2022

PA1 Construction Bulletin - Week of March 7, 2022
Anticipated work schedule for 03/05/2021 to 03/18/2022

PA1 Construction Bulletin - Week of February 28, 2022
Anticipated work schedule for 02/28/2021 to 03/11/2022

PA1 Construction Bulletin - Week of February 21, 2022
Anticipated work schedule for 02/19/2022 to 03/04/2022

PA1 Construction Bulletin - Week of February 12, 2022
Anticipated work schedule for 02/12/2022 to 02/25/2022

PA1 Construction Bulletin - Week of February 7, 2022
Anticipated work schedule for 02/05/2022 to 02/18/2022

PA1 Construction Bulletin - Week of January 31, 2022
Anticipated work schedule for 01/31/2021 to 02/11/2022

PA1 Construction Bulletin - Week of January 24, 2022
Anticipated work schedule for 01/24/2021 to 02/4/2022

PA1 Construction Bulletin - Week of January 17, 2022
Anticipated work schedule for 01/17/2021 to 01/28/2022

PA1 Construction Bulletin - Week of January 10, 2022
Anticipated work schedule for 01/10/2021 to 01/21/2022

PA1 Construction Bulletin - Week of January 03, 2022
Anticipated work schedule for 12/27/2021 to 01/07/2022

PA1 Construction Bulletin - Week of December 27 2021
Anticipated work schedule for 12/27/2021 to 01/07/2022

PA1 Construction Bulletin - Week of December 20 2021
Anticipated work schedule for 12/20/2021 to 12/31/2021

PA1 Construction Bulletin - Week of December 13, 2021
Anticipated work schedule for 12/13/2021 to 12/24/2021

PA1 Construction Bulletin - Week of December 6, 2021
Anticipated work schedule for 12/6/2021 to 12/17/2021

PA1 Construction Bulletin - Week of November 1, 2021
Anticipated work schedule for 11/1/2021 to 11/12/2021

PA1 Construction Bulletin - Week of October 25, 2021
Anticipated work schedule for 10/25/2021 to 11/05/2021