Manhattan
West 3rd Street between Mercer Street and LaGuardia StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday to facilitate crane operation.
East 4th Street between Avenue A and Avenue BThis street will be closed from 9am to 4pm Friday through November 14, 2025 to facilitate crane operation.
West 4th Street between Grove Street and Barrow StreetThis street will be closed from 10pm to 6am nightly through November 14, 2025 for use of knuckle boom to deliver mechanical equipment.
East 9th Street between 2nd Avenue and Stuyvesant StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 30, 2025 for new water and sewer service installations.
West 9th Street between 6th Avenue and 5th AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 23, 2025 to facilitate crane operation.
West 10th Street between Bleecker Street and Hudson StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 to facilitate crane operation.
West 11th Street between Washington Street and Greenwich StreetThis street will be closed from 7am to 6pm Monday to Friday, and 8am to 4pm Saturday through December 2, 2025 to facilitate crane operation.
West 13th Street between 10th Avenue and HighlineThis street will be closed from 9am to 4pm Friday through November 7, 2025 to facilitate crane operation.
West 13th Street between Washington Street and HighlineThis street will be closed from 9am to 4pm Friday through November 7, 2025 to facilitate crane operation.
East 16th Street between Irving Place and 3rd AvenueThis street will be closed from 7am to 4pm Saturday and Sunday through November 16, 2025 for knuckle boom operations to lift/hoist replacement HVAC units from and up to roof.
East 17th Street between Nathan D. Perlman Place and 1st AvenueThis street will be closed from 7am to 6pm Saturday and Sunday through November 9, 2025 to facilitate crane operation.
East 17th Street between 2nd Avenue and Nathan D. Perlman PlaceThis street will be closed from 7am to 6pm Saturday and Sunday through November 9, 2025 to facilitate crane operation.
East 19th Street between Irving Place and 3rd AvenueThis street will be closed from 7am to 4pm Saturday and Sunday through November 16, 2025 to facilitate crane operation.
East 20th Street (Service Road) between Avenue C and 20th Street LoopThis street will be closed from 7am to 4pm Friday through November 28, 2025 for SANDRESPC-East Side Coastal Resiliency.
East 20th Street between Gramercy Park East and 3rd AvenueThis street will be closed from 7am to 1pm Saturday and Sunday through November 16, 2025 for building inspection from boom truck.
West 20th Street between 7th Avenue and 6th AvenueThis street will be closed from 5am to 1pm Saturday and Sunday through November 16, 2025 for lull to hoist furniture.
East 22nd Street between 5th Avenue and BroadwayThis street will be closed from 9am to 3pm Monday to Friday, Saturday from 8am to 6pm, and 9am to 6pm Sunday through November 13, 2025 for major gas installation.
East 25th Street between Madison Avenue and Park Avenue SouthThis street will be closed from 12:01am to 5pm Saturday and Sunday through November 15, 2025 for roof derrick hoist.
East 26th Street between 5th Avenue and Madison AvenueThis street will be closed from 6am to 1pm Saturday and Sunday through November 9, 2025 for building inspection from boom truck.
East 27th Street between Lexington Avenue and Park Avenue SouthThis street will be closed from 6am to 3pm Saturday and Sunday through November 9, 2025 for window cleaning from boom truck.
West 30th Street between 7th Avenue and 8th AvenueThis street will be closed from 5am to 3pm Saturday and Sunday through November 9, 2025 to place knuckle boom to hoist solar panels.
West 30th Street between 11th Avenue and 12th AvenueThis street will be closed from 7pm to 3am weeknights only through November 21, 2025 to excavate and install conduit for new major service.
West 33rd Street between Broadway and 5th AvenueThis street will be closed from 12:01am to 1pm Saturday and Sunday through November 15, 2025 to facilitate crane operation.
West 35th Street between 7th Avenue and 8th AvenueThis street will be closed from 5am to 1pm Saturday and Sunday through November 9, 2025 for inspection from boom truck.
West 36th Street between 10th Avenue and Dyer AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 to facilitate crane operation.
West 37th Street between 9th Avenue and Lincoln Tunnel EntranceThis street will be closed from 5am to 3pm Saturday and Sunday through November 9, 2025 to facilitate crane operation.
East 38th Street between 2nd Avenue and 1st AvenueThis street will be closed from 5am to 8pm Saturday and Sunday through November 16, 2025 to facilitate crane operation.
West 43rd Street between 5 Avenue and 6 AvenueThis street will be closed from 10pm to 5pm weeknights through November 14, 2025 for sewer repairs.
East 45th Street between 2nd Avenue and 1st AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 to facilitate crane operation.
East 45th Street between 3rd Avenue and 2nd AvenueThis street will be closed from 9am to 3pm Monday to Friday through November 14, 2025 to excavate and install conduit for new major service.
West 46th Street between 8th Avenue and BroadwayThis street will be closed from 11:30pm Friday to 11:30am Saturday, and 11:30pm Saturday to 11:30am Sunday through November 9, 2025 to install then crawler removal.
East 47th Street between United Nations Plaza and 2nd AvenueThis street will be closed from 8am to 4pm Saturday through November 15, 2025 to facilitate crane operation.
East 47 Street between Madison Avenue and Vanderbilt AvenueThis street will be closed from 9pm to 6am weeknights through November 15, 2025 for GCT train shed project.
East 47 Street between Vanderbilt Avenue and Park AvenueThis street will be closed from 9pm to Friday to 6am Monday through November 15, 2025 for GCT train shed project.
West 47th Street between 8th Avenue and BroadwayThis street will be closed from 11:30pm to 6:30am weeknights, and Sunday through November 14, 2025 for mobile crane and manlifts for facade and signage work.
East 48 Street between Madison Avenue and Park AvenueThis street will be closed from 9pm to 6am nightly through November 15, 2025 for GCT train shed project.
West 48th Street between 8th Avenue and BroadwayThis street will be closed from 11:30pm to 6:30am weeknights and Sunday nights through November 14, 2025 for mobile crane and manlifts for facade and signage work.
East 53rd Street between 1st Avenue and 2nd AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 to facilitate crane operation.
East 55th Street between 3rd Avenue and 2nd AvenueThis street will be closed from 8am to 8pm Saturday and Sunday through November 9, 2025 to facilitate crane operation.
West 55th Street between 6th Avenue and 5th AvenueThis street will be closed from 8am to 8pm Saturday and Sunday through November 9, 2025 to facilitate crane operation.
East 61st Street between Madison Avenue and 5th AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 to facilitate crane operation.
East 63rd Street between Park Avenue and Lexington AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 for use of knuckle boom to hoist cell site equipment.
East 67th Street between York Avenue and 1st AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday to facilitate crane operation.
West 67th Street between Columbus Avenue and Central Park WestThis street will be closed from 8am to 8pm Saturday and Sunday through November 16, 2025 to facilitate crane operation.
East 68th Street between Madison Avenue and Park AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 16, 2025 to facilitate crane operation.
East 69th Street between 5th Avenue and Madison AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 23, 2025 to place knuckle boom to deliver materials.
West 69 Street between Columbus Avenue and Central Park WestThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 for use of boom truck for facade inspection.
West 73rd Street between Amsterdam Avenue and Columbus AvenueThis street will be closed from 8am to 8pm Saturday and Sunday through November 16, 2025 to facilitate crane operation.
West 77th Street between Broadway and Amsterdam AvenueThis street will be from 8am to 4pm Saturday for use of boom truck for facade inspection.
83rd Street between Broadway and Amsterdam AvenueThis street will be closed from 9am to 3pm Monday to Friday through November 14, 2025 for use of knuckle boom required to offload sheetrock and materials.
East 88th Street between 5th Avenue and Madison AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 3, 2025 for boom operation for material delivery.
West 88th Street between Broadway and Amsterdam AvenueThis street will be closed from 9am to 3pm Monday to Friday through November 11, 2025 to facilitate crane operation.
East 93rd Street between Madison Avenue and Park AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 for knuckle boom operations to lift/hoist furniture.
East 94th Street between 5th Avenue and Madison AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 for knuckle boom operations to lift/hoist materials to roof.
East 122nd Street between Park Avenue and Lexington AvenueThis street will be closed from 9am to 4pm Friday through November 15, 2025 to facilitate crane operation.
West 126th Street between Frederick Douglass Boulevard and Adam Clayton Powell Jr. BoulevardThis street will be closed from 7am to 7pm Saturday and/or Sunday through November 9, 2025 to facilitate crane operation.
West 167th Street between St. Nicholas Avenue and Audubon AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 to facilitate crane operation.
Bennet Avenue between West 186 Street and West187 StreetThis street will be closed from 9am to 4pm Friday, 8am to 6pm Saturday, and 9am to 6pm Sunday through November 28, 2025 to restore depression in roadway caused by sewer collapse.
Nathan D. Perlman Place between East 16th Street and East 17th StreetThis street will be closed from 7am to 6pm Saturday and Sunday through November 9, 2025 to facilitate crane operation.
Vanderbilt Avenue between East 46 Street and East 47 StreetThis street will be closed 24/7 through October 31, 2025 for special operations.
Broadway between West 47th Street and West 48th StreetThis street will be closed from 11:30pm to 6:30am weeknights and Sunday through November 14, 2025 for use of mobile crane and manlifts for facade and signage.
Baruch Drive between Delancey Street South and Delancey Street NorthThis street will be closed 24/7 through November 23, 2025 for Sandrespc-East Coastal Resiliency.
Perry Street between Greenwich Street and Washington StreetThis street will be closed from 7am to 6pm Monday to Friday through November 25, 2025 for concrete pumping and steel erection work.
Warren Street between Greenwich Street and West StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through December 3, 2025 to lift material to roof top with boom truck.
Bedford Street between Grove Street and Barrow StreetThis street will be closed from 9am to 4pm Friday through November 27, 2025 for use of knuckle boom to hoist wood/steel/building materials.
Park Avenue between East 118 Street and IntersectionThis street will be closed 24/7 through December 8, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East 119 Street and IntersectionThis street will be closed 24/7 through December 8, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East 119 Street and East 118 StreetThis street will be closed 24/7 through December 8, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East 119 Street and Esat 120 StreetThis street will be closed from 7am to 7pm Saturday to erect the gantries for the Park Avenue Viaduct-Northbound.
Park Avenue between East 120 Street and East 119 StreetThis street will be closed 24/7 through December 8, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East 120 Street and IntersectionThis street will be closed 24/7 through December 8, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East 121 Street and East 120 StreetThis street will be closed 24/7 through December 8, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East 121 Street and IntersectionThis street will be closed 24/7 through December 8, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East 122 Street and East 121 StreetThis street will be closed 24/7 through December 8, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East 122 Street and East 123 StreetThis street will be closed 24/7 through December 1, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East 123 Street and IntersectionThis street will be closed 24/7 through December 1, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between Intersection and East 127 StreetThis street will be closed 24/7 through November 24, 2025 to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East Intersection and East 130 StreetThis street will be closed from 4pm Friday to 4am Monday to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East Intersection and East 131 StreetThis street will be closed from 4pm Friday to 4am Monday to erect the gantries for the Park Avenue Viaduct-Southbound.
Park Avenue between East 131 Street and 132 StreetThis street will be closed from 4pm Friday to 4am Monday to erect the gantries for the Park Avenue Viaduct-Southbound.
White Street between Lafayette Street and Cortlandt AlleyThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 22, 2025 for building inspection from boom truck.
Sullivan Street between West Houston Street and Prince StreetThis street will be closed from 7am to 3pm Friday through November 14, 2025 for utility and infrastructure upgrades for NYCDDC HWPR20MKL contract.
South William Street between Mill Lane and Broad StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 to excavate and install conduit and vault for new major service.
Hudson Street between Duane Street and Reade StreetThis street will be closed from 8am to 2pm Saturday and Sunday through November 23, 2025 to lift materials to roof.
White Street between West Broadway and Avenue of the AmericasThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 23, 2025 for new sewer installation.
Rivington Street between Freeman Alley and Chrystie StreetThis street will be closed from 9am to 4pm Friday through November 19, 2025 for new water installation.
Rivington Street between Bowery and Freeman AlleyThis street will be closed from 9am to 4pm Friday through November 19, 2025 for installation of new water service.
Hester Street between Allen Street and Eldridge StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 to facilitate crane operation.
Orchard Street between Hester Street and Grand StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday for use of boom truck for facade inspection.
Ann Street between Broadway and Theatre AlleyThis street will be closed from 9am to 4pm Friday, 8am to 6pm Saturday, and 9am to 6pm Sunday through November 28, 2025 to facilitate crane operation.
South Street between Fulton Street and Beekman StreetThis street will be closed from 10pm to 6am weeknights through November 16, 2025 for restoration of sewer bypass area, removal of bypass pipes, backfill roadway pavement restoration.
Ann Street between Broadway and Nassau StreetThis street will be closed from 9am to 4pm Friday through December 31, 2025 for knuckle boom, concrete pump operations.
John Street between Broadway and Nassau StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 30, 2025 for use of boom truck.
Nassau Street between Pine Street and Cedar StreetThis street will be closed from 7am to 4pm Monday to Friday, 8am to 6pm Saturday, and 9am to 6pm Sunday through November 26, 2025 for reconstruction of Nassau Street.
Pine Street between Nassau Street and BroadwayThis street will be closed from 7am to 4pm Friday through November 24, 2025 for the reconstruction of Nassau Street.
Pine Street between Pearl Street and Water StreetThis street will be closed from 6am to 10am Monday to Friday through November 9, 2025 for use of boom and knuckle boom to work on major alteration.
Exchange Place between William Street and Hanover StreetThis street will be closed from 10pm to 6am nightly through October 31, 2025 to facilitate crane operation.
Wall Street between William Street and Hanover StreetThis street will be closed from 6am to 10am Monday to Friday through November 25, 2025 for utilizing the gantry rigging system to deliver material.
Wall Street between William Street and Hanover StreetThis street will be closed from 10pm to 6am nightly through December 1, 2025 to facilitate crane operation.
Jackson Street between Water Street and South StreetThis street will be closed from 9am to 4pm Friday through November 20, 2025 for Sandrespc-East Coast Resiliency.
Jane Street between West Street and Washington StreetThis street will be closed 9am to 4pm Friday through December 5, 2025 for installation of conduit for system reinforcement.
Collister Street between Hubert Street and Laight StreetThis street will be closed from 8am to 8pm Monday to Friday through November 1, 2025 to install underground drainage.
Baruch Drive between Delancey Street South and Delancey Street NorthThis street will be closed from 7am to 6pm Monday to Friday through November 30, 2025 for SANDRESPC-East Side Coastal Resiliency.
Market Street between Henry Street and Madison StreetThis street will be closed from 9am to 4pm Friday for facade inspection.
Riverside Drive between West 152nd Street and West 153rd StreetThis street will be closed 24/7 through December 7, 2025 for NYCDOT contract HBM1165 rehab Riverside Drive Viaduct over West 158th Street, (safety reasons).
Harlem River Ramp between 2nd Avenue Southbound and 2nd Avenue NorthboundThis street will be closed from 7am to 11pm Monday to Friday through November 27, 2025 for installation of the new13kv feeders across Harlem River.
FDR Drive between Montgomery Street and East 15 StreetSingle-lane northbound and/or southbound will be closed Monday to Thursday from 10pm to 5am next morning, Saturday from 12:01am to 9am, and Sunday from 1am to 11am. Double-lane will be closed Tuesday to Friday from 1am to 5am, Saturday from 1am to 7am, and Sunday from 1am to 7am. These closures are necessary to facilitate median reconstruction and will continue through August 15, 2026.
FDR Drive Southbound between Jackson Street and Cherry StreetSingle-lane will be closed Friday from 11pm to 7am next morning, and Sunday from 11pm to 10am next morning. Double-lane will be closed Tuesday to Friday from 1am to 5am, Saturday from 1am to 6am, and Sunday from 1am to 7am. These closures are necessary to facilitate East Side Coastal Resiliency Project and will continue through September 11, 2026.
Battery Park Underpass between FDR Drive and Route 9A/West StreetPeriodically the northbound and/or southbound tube will be fully closed nightly between 11pm and 4am, as permitted by NYCDOT Bridges for tunnel maintenance and repairs through December 31, 2025.
Bronx
East 158th Street between Melrose Avenue and Elton AvenueThis street will be closed from 9am to 4pm Friday to facilitate crane operation.
East 159 Street between Courtlandt Avene and Melrose AvenueThis street will be closed from 9am to 4pm Friday through November 11, 2025 for northbound lull lift in the roadway to install steel.
East 206th Street between East Mosholu Parkway and St. Georges CrescentThis street will be closed 9am to 3pm Monday to Friday through November 30, 2025 for booming and pouring concrete.
West 262nd Street between Husley Avenue and BroadwayThis street will be closed from 8am to 5pm Monday to Friday through November 30, 2025 for use of concrete pumps, boom trucks, and knuckle boom.
Gerard Avenue between East 150th Street and East 151st StreetThis street will be closed weekdays from 9am to 2pm when school is in session, and/or 9am to 4pm when school is not in session, and 8am to 6pm Saturday through December 5, 2025 for installation of pre-cast panels, special operations.
East Tremont Avenue between Adams Street and East 180th StreetThis street will be closed from 10pm to 6am nightly through December 31, 2025 for cable pulling.
Cedar Avenue between West Fordham Road and West 179 StreetThis street will be closed from 9am to 4pm Friday through December 31, 2025 for sewer construction.
Grand Concourse between East 180th Street and East Burnside AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 to facilitate crane operation.
Bathgate Avenue between East 189th Street and East Fordham RoadThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 16, 2025 to facilitate crane operation.
Kingsbridge Terrace between Heath Avenue and West Kingsbridge RoadThis street will be closed from 8am to 6pm Monday to Friday through February 5, 2026 for concrete pump and booming operations.
Creston Avenue between East 196th Street and East Kingsbridge RoadThis street will be closed from 9am to 4pm Friday through January 28, 2026 to facilitate crane operation.
Villa Avenue between Bedford Park Boulevard and East 204 StreetThis street will be closed from 10am to 3pm Friday, and 7pm to 10am weeknights through December 5, 2025 for bumping, booming operations.
Hutchinson River Parkway between TBTA Access Road and Schley AvenueThis street will be closed from 10pm to 6am nightly through December 31, 2025 to facilitate crane operation.
Halperin Avenue between Williamsbridge Road and Blondell AvenueThis street will be closed from 9am to 4pm Monday to Friday through November 14, 2025 for upgrade of gas main.
Ponton Avenue between Blondell Avenue and Dead EndThis street will be closed from 7am to 6pm Monday to Friday through November 15, 2025 to facilitate crane operation.
De Reimer Avenue between Bassett Avenue and Erskine PlaceThis street will be closed from 9am to 4pm Friday through December 12, 2025 for drainage tie-in.
Cruger Avenue between Sagamore Street and Bronxdale AvenueThis street will be closed from 8am to 5pm Monday to Friday through December 31, 2025 for MTA contract C-35311 work zone and MPT-6.
Saxon Avenue between Sedgwick Avenue and Van Cortlandt Park SouthThis street will be closed from 9am to 5pm Monday to Friday through February 6, 2026 for boom, knuckle boom and concrete pump work on new building.
Commonwealth Avenue between Watson Avenue and Gleason AvenueThis street will be closed from 9am to 4pm Weekdays and/or Saturday, if necessary, through December 31, 2025 to facilitate crane operation.
De Reimer Avenue between Bassett Avenue and Erskine PlaceThis street will be closed from 9am to 4pm Friday through December 12, 2025 for drainage tie-in.
Rodman Place between Longfellow Avenue and West Farms RoadThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 18, 2025 to facilitate crane operation.
Manhattan/Brooklyn
Williamsburg BridgeStarting on the weekends of November 7 and December 13, 2025 there will be two lanes closed in the eastbound direction of the Williamsburg Bridge approach near Broadway and the South 5 Street exit ramps, and one lane in the westbound direction starting Friday from 11pm until Monday 4am. Access to the eastbound Brooklyn Queens Expressway, Broadway, and South 5 street exit ramps will be maintained at all times. There will be 15-minute full roadway closures on the hour to safely transport track panels above the roadway. This work is necessary to facilitate the replacement of the Jamaica line train tracks as permitted by NYCT.
Brooklyn
East 4th Street between 18th Avenue and Avenue FThis street will be closed from 9am to 4pm Friday through December 18, 2025 for concrete pump, boom and knuckle boom to work on new building.
West 6 Street between Neptune Avenue and Sheepshead Bay RoadThis street will be closed 24/7 through December 8, 2025 for contract C-34916, painting and steel repairs.
North 10 Street between Bedford Avenue and Driggs AvenueThis street will be closed from 9am to 4pm Friday through December 26, 2025 for material delivery and boom truck operations.
South 11 Street between Kent Avenue and Wythe AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 30, 2025 to traffic signals.
South 11 Street between Kent Avenue and IntersectionThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 30, 2025 to traffic signals.
16 Street between 5 Avenue and 6 AvenueThis street will be closed from 9am to 4pm Friday through February 7, 2026 for delivery and rebar.
West 28 Street between Mermaid Avenue and Surf AvenueThis street will be closed from 9am to 4pm Friday through November 21, 2025 for new water and sewer service installations.
East 31 Street between 3 Avenue and 4 AvenueThis street will be closed from 9am to 4pm Friday through February 3, 2026 for major gas installation.
47th Street between 16th Avenue and 17th AvenueThis street will be closed from 9am to 6pm Sunday through December 31, 2025 to facilitate crane operation.
East 92nd Street between Ditmas Avenue and LIRR Bay Ridge DivisionThis street will be closed from 9am to 4pm Friday through December 31, 2025 for installation of electrical manholes and conduit.
East 102nd Street between Farragut Road and Glenwood RoadThis street will be closed from 6am to 4pm Friday and 10pm Friday to 5am Monday through November 10, 2025 for mainline track repairs.
Farragut Road between East 102nd Street and East 103rd StreetThis street will be closed from 6am to 4pm Friday and 10pm Friday to 5am Monday through November 10, 2025 for mainline track repairs.
Kent Avenue between South 11 Street and South 10 StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 30, 2025 to install traffic signals.
Kent Avenue between South 11 Street and Division AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 30, 2025 to install traffic signals.
Java Street between Water and West StreetThis street will be closed from 7am to 6pm Monday to Friday through November 30, 2025 for large concrete pours.
West Street between Quay Street and Calyer StreetThis street will be closed from 9am to 4pm Friday through December 8, 2025 for trenching to install conduit for major service.
Quay Street between West Street and Franklin StreetThis street will be closed from 9am to 4pm Friday through December 8, 2025 for trenching to install conduit for major service.
Lincoln Place between Nostrand Avenue and Rogers AvenueThis street will be closed from 9am to 4pm Friday through November 26, 2025 for concrete pump, boom and knuckle boom to work on new building.
Rutland Road between Nostrand Avenue and New York AvenueThis street will be closed from 9am to 4pm Friday through November 29, 2025 for rebar, concrete pumping for new 5 story building.
Parkside Avenue between Nostrand Avenue and New York AvenueThis street will be closed from 9am to 4pm Friday, and 8am to 4pm Saturday through December 27, 2025 for booming and pumping operations for new building project.
Conselyea Street between Lorimer Street and Union AvenueThis street will be closed from 9am to 4pm Friday through December 3, 2025 to facilitate crane operation.
Frost Street between Union Avenue and Lorimer StreetThis street will be closed from 9am to 4pm Friday through December 13, 2025 for the delivery/unloading of materials for building construction.
Granite Street between Bushwick Avenue and Dead EndThis street will be closed from 9am to 3pm Monday to Friday through November 22, 2025 for trenching to install conduit for service and a vault.
Bradford Street between Atlantic Avenue and Fulton StreetThis street will be closed from 9am to 4pm Friday through November 8, 2025 to facilitate crane operation.
Downing Street between Putnam Avenue and Fulton StreetThis street will be closed from 9am to 4pm Friday through December 31, 2025 for boom, knuckle boom and concrete pump to work on new building.
Rockwell Place between Dekalb Avenue and Fulton StreetThis street will be closed from 9am to 4pm Friday through November 14, 2025 for concrete pouring and booming to erect new building.
Hoyt Street between Livingston Street and Fulton StreetThis street will be closed from 11pm Friday to 5pm Sunday through November 14, 2025 to facilitate crane operation.
Bridge Street between Fulton Street and Willoughby StreetThis street will be closed from 11pm Friday to 5pm Monday through November 9, 2025 for associated closure for main and assist crane work on 422 Fulton Street.
Fleet Place between Willoughby Street and Fair StreetThis street will be closed 9am to 4pm Friday through November 14, 2025 to facilitate crane operation.
Fleet Place between Fair Street and Willoughby StreetThis street will be closed from 9am to 4pm Friday through November 14, 2025 for use of boom, knuckle boom and concrete pump to work on new building.
Willoughby Street between Flatbush Avenue Extension and Fleet PlaceThis street will be closed from 9am to 4pm Friday through November 14, 2025 to facilitate crane operation.
Lott Street between Tilden Avenue and Beverly RoadThis street will be closed from 9am to 4pm Friday through November 30, 2025 for concrete pump and knuckle boom use.
Midleton Street between Marcy Avenue and Harrison AvenueThis street will be closed from 9am to 4pm Friday through December 10, 2025 to facilitate crane operation.
Emerson Place between Myrtle Avenue and Park AvenueThis street will be closed from 9am to 4pm Friday through January 13, 2026 for boom, knuckle boom and concrete pump to work on new building.
Williamsburg Street East between Bedford Avenue and Lee AvenueThis street will be closed from 9am to 4pm through February 5, 2026 for boom, knuckle boom and concrete pump to work on new building.
Rodney Street between Bedford Avenue and Lee AvenueThis street will be closed from 9am to 4pm Friday, 8am to 6pm Saturday, and 9am to 6pm Sunday through November 19, 2025 to facilitate crane operation.
Liberty Avenue between Junius Street and Van Sinderen AvenueThis street will be closed from 5am to 9pm Saturday and Sunday through November 10, 2025 for mainline track repairs.
Sackett Street between Nevins Street and 3rd AvenueThis street will be closed from 9am to 5pm weekdays through November 21, 2025 for foundation work, concrete operations.
Nevins Street between Degraw Street and Douglass StreetThis street will be closed from 9am to 4pm Friday through November 14, 2025 for water main repair and paving.
Nevins Street between President Street and Union StreetThis street will be closed from 11pm Friday to 10pm Sunday through November 14, 2025 to facilitate crane operation.
Nevins Street between Intersection and President StreetThis street will be closed from 11pm Friday to 10pm Sunday through November 14, 2025 to facilitate crane operation.
Nevins Street between Carroll Street and President StreetThis street will be closed from 11pm Friday to 10pm Sunday through November 14, 2025 to facilitate crane operation.
Degraw Street between Bond Street and Body of WaterThis street will be closed from 7am to 4pm Friday through December 24, 2025 for booming and pumping operations (in conjunction with new building project).
Douglass Street between Bond Street and Body of WaterThis street will be closed from 7am to 4pm Friday through December 24, 2025 for booming and pumping operations (in conjunction with new building project).
President Street between 3rd Avenue and Nevins StreetThis street will be closed from 11pm Friday to 10pm Sunday through November 14, 2025 for associated closure for main crane and assist crane placement.
Schermerhorn Street between Bond Street and Nevins StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 to facilitate crane operation.
Union Street between Bond Street and Gowanus CanalThis street will be closed from 9am to 4pm Friday through November 14, 2025 for use of knuckle boom to pick mechanical equipment.
Christopher Street between Dead End and Glenmore AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through December 20, 2025 for trenching to install conduit for major service.
Glenmore Avenue between Mother Gaston Boulevard and Christopher AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through December 20, 2025 for trenching to install conduit for major service.
Glenmore Avenue between Junius Street and Van Sinderen AvenueThis street will be closed from 5am to 9pm Saturday and Sunday through November 9, 2025 for mainline track repairs.
Pitkin Avenue between Junius Street and Van Sinderen AvenueThis street will be closed from 5am to 9pm Saturday and Sunday through November 9, 2025 for mainline track repairs.
Livonia Avenue between Warwick Street and Jerome StreetThis street will be closed from 6am Friday to 6am Monday through December 5, 2025 for MTA contract A-37758 packages 5 ADA upgrades/elevator replacement 13 Stations in Brooklyn (foundation setup elevator, etc.).
Himrod Street between Irving Avenue and Wyckoff AvenueThis street will be closed from 9am to 4pm Friday through December 31, 2025 for boom, knuckle boom and concrete pump to work on new building.
Amboy Street between Livonia Avenue and Riverdale AvenueThis street will be closed from 9am to 4pm Friday through November 25, 2025 for use of boom, knuckle boom and concrete pump to work on new building.
Suydam Street between St. Nicholas Avenue and Cypress AvenueThis street will be closed from 9am to 4pm Friday through December 8, 2025 for trenching to install conduit for service.
Howard Avenue between St. Marks Avenue and Bergen StreetThis street will be closed from 9am to 5pm Monday to Friday, and 8am to 5pm Saturday through December 27, 2025 for new building operations (booming and pumping).
Henry Street between Joralemon Street and State StreetThis street will be closed from 9am to 5pm weekdays through December 31, 2025 to install NYCDEP sewer and water main for DDC.
Joralemon Street and Clinton Street and Court StreetThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 14, 2025 for lull required to off-load steel and materials.
Verandah Place between Henry Street and Clinton StreetThis street will be closed from 9am to 4pm Friday through December 7, 2025 for trenching to install conduit for service.
Montague Street between Henry Street and Hicks StreetThis street will be closed from 9am to 5pm Sunday for building inspection from boom truck.
State Street between Henry Street and Sidney PlaceThis street will be closed from 9am to 5pm weekdays through December 31, 2025 to install NYCDEP sewer and water main for DDC.
Remsen Street between Hicks Street and Henry StreetThis street will be closed from 9am to 5pm Saturday and Sunday to facilitate crane operation.
Hicks Street between Remsen Street and Montague StreetThis street will be closed from 9am to 5pm Saturday and Sunday through November 9, 2025 for building inspection from boom truck.
Ocean Parkway between Ocean View Avenue and Brighton Beach AvenueThis street will be closed from 9am to 4pm Friday through December 3, 2025 for trenching to install conduit for service.
Brooklyn/Queens
Greenpoint Avenue Bridge over Newton CreekA single lane will be closed in either direction from 11pm to 5am Monday October 20th, and intermittently through Friday November 14th, 2025. One lane of traffic in each direction will be maintained at all times. During repairs, the bike lanes will be open on both directions. These closures are necessary for conducting continued repairs on Greenpoint Avenue Bridge, as permitted by NYCDOT Bridges.
Borden Avenue Bridge over Newtown CreekA full bridge closure will take place intermittently from 11pm Monday to 5am Friday November 28th, 2025. All vehicular and pedestrian traffic will be diverted to adjacent bridges over Newtown Creek. Traffic will return to its original configuration after work hours. These closures are necessary for continued repairs on the Borden Avenue Bridge over Newtown Creek, as permitted by NYCDOT Bridges.
Pulaski Bridge over Newtown CreekSingle lane will be closed in each direction northbound and southbound (not at the same time) will be closed weeknights from 11pm to 5am Monday to Friday November 21st, 2025. At least one lane in each direction will be maintained. Traffic will return to its original configuration after work hours. These closures are necessary to conduct maintenance on the Pulaski Bridge over Newtown Creek as permitted by NYCDOT Bridges.
Queens
24th Street between 41st Avenue and Queens Plaza NorthThis street will be closed from 9am to 4pm Friday through November 20, 2025 for boom, knuckle boom and concrete pump to work on new building.
30th Street between 40th Avenue and 39th AvenueThis street will be closed from 9am to 4pm Friday through December 16, 2025 for concrete operations.
38th Avenue between 138th Street and Main StreetThis street will be closed from 9am to 4pm Friday through November 28, 2025 to facilitate crane operation.
39th Avenue between Main Street and 138th StreetThis street will be closed from 10pm to 5am weeknights through November 14, 2025 to facilitate crane operation.
40th Avenue between 29th Street and 30th StreetThis street will be closed from 9am to 4pm Friday through December 16, 2025 for concrete operations.
40th Avenue between Northern Boulevard and 30th StreetThis street will be closed from 9am to 4pm Friday through December 16, 2025 for concrete operations.
40th Road between 29th Street and Northern BoulevardThis street will be closed from 9am to 4pm Friday through December 16, 2025 for concrete operations.
43rd Avenue between 51st Street and 52nd StreetThis street will be closed from 5am to 7pm Saturday and Sunday through November 9, 2025 for MTA contract: A-46026 (5) five Stations Rehab. 52nd Street Station-Flushing line (girder replacement).
62nd Street between Roosevelt Avenue and 39th AvenueThis street will be closed from 10pm Friday to 5am Monday through November 17, 2025 for removal of platform girder.
150th Street between Archer Avenue and 94th AvenueThis street will be closed from 10pm Friday to 6pm Sunday through November 9, 2025 for continued work on LIRR structure.
Old South Road between 128 Street and 129 StreetThis street will be closed from 8am to 6pm Monday to Friday through December 5, 2025 for full roadway closure corresponding permit# Q012025253-A93.
Old South Road between 128 Street and IntersectionThis street will be closed from 8am to 6pm Monday to Friday through December 5, 2025 for full roadway closure corresponding permit# Q012025253-B74.
Old South Road between Intersection and 129 StreetThis street will be closed from 8am to 6pm Monday to Friday through December 5, 2025 for full roadway closure corresponding permit# Q012025253-B75.
Old South Road between 129 Street and 130 StreetThis street will be closed from 8am to 6pm Monday to Friday through December 5, 2025 for full roadway closure corresponding permit# Q012025253-A86.
Old South Road between Intersection and 130 StreetThis street will be closed from 8am to 6pm Monday to Friday through December 5, 2025 for full roadway closure corresponding permit# Q012025253-B73.
Hillyer Street between Queens Boulevard and 51 StreetThis street will be closed from 9am to 4pm Friday through November 14, 2025 to facilitate crane operation.
Rockaway Freeway Eastbound between Beach 54 Street and Beach 47 StreetThis street will be closed from 7am to 6pm Monday to Friday through November 7, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Rockaway Freeway Eastbound between 87th Street and Beach 86th StreetThis street will be closed from 9am to 4pm Monday to Friday through November 19, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Rockaway Freeway Eastbound between 88th Street and Beach 87th StreetThis street will be closed from 9am to 4pm Monday to Friday through November 19, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Rockaway Freeway Eastbound between 90th Street and Beach 88th StreetThis street will be closed from 9am to 4pm Monday to Friday through November 19, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Rockaway Freeway Eastbound between 91st Street and Beach 90th StreetThis street will be closed from 9am to 4pm Monday to Friday through November 19, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Rockaway Freeway Eastbound between 92nd Street and Beach 91st StreetThis street will be closed from 9am to 4pm Monday to Friday through November 19, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Rockaway Freeway Eastbound between 94th Street and Beach 92nd StreetThis street will be closed from 9am to 4pm Monday to Friday through November 19, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Rockaway Freeway Eastbound between Beach 96 Street and Beach 95 StreetThis street will be closed from 7am to 6pm Monday to Friday through November 7, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Rockaway Freeway Eastbound between Beach 97 Street and Beach 96 StreetThis street will be closed from 7am to 6pm Monday to Friday through November 7, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Rockaway Freeway Eastbound between Beach 98 Street and Beach 97 StreetThis street will be closed from 7am to 6pm Monday to Friday through November 7, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Rockaway Freeway Eastbound between Beach 101 Street and Beach 100 StreetThis street will be closed from 7am to 6pm Monday to Friday through November 29, 2025 for concrete restoration on the track of the Rockaway Viaduct line.
Belt Parkway between Exit 21B and Exit 20Single-lane westbound will be closed Monday to Thursday from 10am to 2pm and 10pm to 5am next morning, Friday from 10pm to 6am next morning, and Saturday from 10pm to 11am next morning. Double-lane westbound will be closed Monday to Friday from 1am to 5am, Saturday from 1am to 6am, and Sunday from 2am to 9am. These closures are necessary to facilitate JFK Redevelopment Program and will continue through December 31, 2025.
Grand Central Parkway at Long Island Expressway InterchangeSingle-lane eastbound will be closed Monday to Friday from 10am to 2pm, Monday to Thursday from 10pm to 5am next morning, Friday from 10pm to 7am next morning, Saturday from 10am to 3pm and from 10pm to 3pm next day. Double-lane eastbound will be closed Monday to Friday from 12:01am to 5am, Saturday from 1am to 6am, and Sunday from 1am to 9am. Single-lane westbound will be closed Monday to Friday from 10am to 3pm, Monday to Thursday from 10pm to 5am next morning, Friday from 10pm to 6am next morning, Saturday from 10am to 3pm and from 10pm to 3pm next day. Double-lane eastbound will be closed Monday to Friday from 12:01am to 5am, Saturday from 12:01am to 6am, and Sunday from 1am to 9am. These closures are necessary to facilitate Safety and Mobility Improvements and will continue through April 23, 2026.
Grand Central Parkway Eastbound between Roosevelt Avenue and 54 AvenueEastbound mainline will be closed for 15 minutes at a time, Monday to Friday from 12:01am to 5am, Saturday from 1am to 6am, and Sunday from 1am to 9am through April 23, 2026, to facilitate sign structure removal and installation. Mainline shoulder lanes will be closed 24/7 along the project limit to replace sections with traversable curbs and guiderail.
Belmont Park Bridge over Cross Island ParkwayAs of Monday September 29th, to Friday October 24th, 2025, an alternate single-lane closure in either the right or left lane will take place from 7am to 3:30pm and Northbound Cross Island Parkway right lane will be closed with lane shifts 24/7 for approximately 12 weeks. One 12-foot lane will remain open for two-way traffic, with flaggers at both ends of the work zone. These closures are necessary for continued repairs on the Belmont Park south Ramp over the Cross Island Parkway as permitted by NYCDOT Bridges.
Hillside Avenue Bridge over Cross Island ParkwayAlternating single-lane closures in either direction on the Cross Island Parkway will take place Monday October 20th through Friday November 14th, 2025, weeknights from 9pm to 5am. Traffic will return to its original configuration after work hours. These closures are necessary to continue the rehabilitation of the Hillside Avenue Bridge as permitted by NYCDOT Bridges.
Springfield Boulevard Bridge over Belt Southern Parkway between North Conduit Avenue and South Conduit AvenueSingle-lane and double-lanes on the Belt Parkway will be closed Monday October 27th, 2025, 10pm to 5am weekdays (single-lane closure) and 1am to 5am (double-lane closure) through Friday November 21st, 2025, for the continued rehabilitation of the eastern sidewalk of the Springfield Boulevard Bridge. One lane in each direction will be maintained. Traffic lanes will return to normal configuration after work hours.
Roosevelt Avenue BridgeOne northbound lane on the Van Wyck will continue to be closed and a double lane closure on the southbound of the Van Wyck Expressway will continue to be closed through November 26th, from 11:59pm to 5am Southbound, Tuesday, Wednesday, Thursday from 11pm to 5am Southbound, Friday from 11:59pm to 6am Southbound. In addition, two northbound and one southbound lane will remain open during these closures. These closures are necessary to facilitate steel repair work for Roosevelt Avenue Bridge.
Nassau Expressway between Cross Bay Boulevard Entrance Ramp and Exit 2NSingle-lane eastbound will be closed Monday to Thursday from 10am to 3pm and 9pm to 5am next morning, Friday from 10pm to 7am next morning, and Saturday from 10pm to 7am next morning. Double-lane eastbound will be closed Monday to Friday from 12:01am to 5am, Saturday from 12:01am to 7am, and Sunday from 12:01am to 7am. Eastbound Exit Ramp 2S will be closed Monday to Thursday from 11pm to 7am next morning, Friday from 11pm to 7am next morning, and Saturday from 11pm to 7am next morning. These closures are necessary to facilitate JFK Redevelopment Program and will continue through December 31, 2025.
Staten Island
North Railroad Avenue between Barton Avenue and Adams AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 for crane/knuckle boom work.
North Railroad Avenue between Hamden Avenue and Hunter AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 for crane/knuckle boom work.
North Railroad Avenue between Hunter Avenue and Barton AvenueThis street will be closed from 8am to 6pm Saturday, and 9am to 6pm Sunday through November 9, 2025 for crane/knuckle boom work.
Front Street/Murray Hubert Avenue between Thompson Street and Bay StreetThis street will be closed from 7am to 6pm Monday to Friday through December 20, 2025 for new Stapleton waterfront southern infrastructure.
Front Street between Wave Street and Hannah StreetThis street will be closed from 7am to 6pm Monday to Friday through December 20, 2025 for new Stapleton Waterfront Infrastructure.