Stormwater Permits

Any development or redevelopment project (public or private) will require a Stormwater Permit if:

  1. It can drain to a City-owned sewer system
  2. It disturbs 20,000 sf or more of soil, or adds 5,000sf or more of new impervious area

View Chapter 19.1 of Title 15 of the Rules of the City of New York for the most up-to-date list of project exclusions and definitions.

Stormwater Permitting & Tracking System

To apply for Stormwater Permits you must submit an application using our Stormwater Permitting and Tracking System or “SWPTS.”

Access SWPTS

Once you login to SWPTS, the system will walk you through the various steps of the permitting process. Download the SWPTS User Manual.


Stormwater Permit Process

Stormwater Pollution Prevention Plan Application (Phase I)

Please refer to the NYC Stormwater Manual and the following support materials:

Stormwater Maintenance Easement (Phase II)

  • Download the Stormwater Maintenance Easement Instructions and Pre-Approved Maintenance Easement Template
  • Pre-Construction (Phase III)

    Active Construction (Phase IV)

    Construction Close-Out (Phase V)


    Contact

    To request a meeting, respond to a summons or Commissioner’s Order, or ask technical questions, please fill in the Stormwater Permit Inquiry Form. Before you submit an inquiry, be sure to have a look at the Stormwater Permit FAQs.

    Workshops

    We host monthly stormwater permit workshops to explain eligibility requirements and guide users through the permit process. Registration for each workshop webinar opens one month prior to the workshop date. Register here.

    We’d love to hear your thoughts on future workshops! Please fill out this survey to let us know what topics you’d like to learn more about.

    Past Presentations

    Newsletter Signup

    To receive the latest information about our stormwater events and activities, visit Newsletters and subscribe to the “DEP Stormwater” email list.