MANUAL CHAPTERS
Table of Contents »
1. Introduction »
2. Advance Notice and Coordination »
2.1 The Goal of Advance Notice and Coordination
2.2 NYCityMap, DOTMap, and Other Online Information
2.3 Key Principles for Effective Notice and Coordination of Planned Street Work
2.4 Advance Notice and Coordination in Lower Manhattan
3. Permits and Approvals »
3.1 General Provisions for Construction-Related Permits
3.2 The Permittee Registration Process
3.2.1 Required Documentation for a Permittee Registration Application
3.2.2 Permittee Registration Application Submittal
3.3 The Permit Application Process (Non-Emergency Work)
3.3.1 Common Requirements for All Permit Types
3.3.2 Application Procedures for a Street Opening Permit
3.3.3 Application Procedures for a Building Operations/Construction Activity Permit
3.3.4 Application Procedures for a Sidewalk Construction Permit
3.3.5 Permit Application Review and Issuance (for Street Opening, Building Operations/ Construction Activity, and Sidewalk Construction Permits)
3.3.6 Permit Renewals and Re-Issuances (for Street Opening, Building Operations/Construction Activity, and Sidewalk Construction Permits)
3.4 Canopy Authorizations and Permits
3.4.1 Application Procedure for Canopy Authorizations and Permits
3.4.2 Canopy Permit Renewals
3.5 Other Provisions Pertaining to Permits
3.5.1 Holds
3.5.2 Permit Revocation
3.5.3 Other Actions
3.6 Emergency Work and Special Circumstances
3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings
3.6.2 Embargoes
3.7 Vault Approvals
3.7.1 Building Vaults
3.7.2 Transformer Vaults
3.7.3 Vaults Requiring a Revocable Consent
4. Executing Work in the Street »
4.1 General Requirements for Executing Work
4.2 Street Excavation Requirements
4.2.1 New York 811
4.3 Street Restoration Requirements
4.4 Sidewalk Repairs
4.5 Street Construction Inspections and Enforcement
4.6 Sidewalk Violation Inspections and Enforcement
Appendices »
Appendix A—Common Permit Types and Documents Needed
Appendix B—Forms
Appendix C—NYC DOT Contact Information
Appendix D—Other Agency and Utility Contact Information
Appendix E—Links
Appendix F—Permit Stipulations
Appendices
Appendix A—Common Permit Types and Documents Needed
Street Opening Permits
Building Operations/Construction Activity Permits
Sidewalk Construction Permits
Canopy Permits
Appendix B—Forms
Registration & Insurance
Applications
Miscellaneous Procedures
Highway Rules
Minimum Clearance Requirements For Transformer Vaults
Appendix C—NYC DOT Contact Information
ASHO Borough Offices
Borough Permit Offices
HIQA Borough Offices
Borough Commissioners
Other NYC DOT Office Contacts
Appendix D—Other Agency and Utility Contact Information
Department of Design and Construction, Construction Director Borough Offices
Department of City Planning Borough Offices
Department of Buildings Borough Offices
Department of Parks and Recreation Borough Offices
Environmental Control Board Borough Offices
Other City and State Offices
Utility Contacts
Appendix E—Links
Chapter 1—Introduction
Chapter 2—Advance Notice and Coordination of Planned Street Work
Chapter 3—Permits and Approvals
Chapter 4—Executing Work in the Street
Appendix F—Permit Stipulations
back to top
Foreword–NYC DOT Commissioner
Acknowledgments
Glossary
Copyright 2013 The City of New York
Contact Us
|
FAQs
|
Privacy Policy
|
Terms of Use
|
Site Map