| Document Number |
Title |
Issue Date |
Effective Date |
Status |
SB 22-003
|
Standard Highway Specifications |
5/16/2022 |
6/27/2022 |
Active |
| SB 22-004 |
NYC DOT Standard Details of Construction |
6/6/2022 |
6/27/2022 |
Active |
| SB 22-005 |
Standard Sewer and Water Specifications |
8/8/2022 |
8/29/2022 |
Active |
| SB 22-006 |
Incremental Cost Near Transit Facilities |
11/7/2022 |
11/18/2022 |
Active |
| SB 23-002 |
Pipe Bollard |
4/27/2023 |
5/8/2023 |
Active |
| SB 23-003 |
Mobilization |
5/11/2023 |
5/15/2023 |
Active |
| SB 24-001 |
Cement, Portland |
3/25/2024 |
4/1/2024 |
Active |
| SB 24-002 |
Sheeting and Bracing |
4/1/2024 |
4/15/2024 |
Active |
| SB 24-003 |
Corner Curb |
4/4/2024 |
4/15/2024 |
Active |
| SB 24-004 |
Pigmenting |
4/8/2024 |
4/15/2024 |
Active |
| SB 24-005 |
NYC DEP Standard Green Infrastructure Specifications |
8/1/2024 |
8/19/2024 |
Active |
| SB 24-006 |
Reinforced Concrete Sewers |
8/21/2024 |
8/28/2024 |
Active |
| SB 24-007 |
Drains To Be Kept Clean |
9/19/2024 |
9/25/2024 |
Active |
| SB 24-008 |
Payment Requisitions |
9/23/2024 |
9/27/2024 |
Active |
| SB 24-010 |
Flaggers, Crossing Guards, and Pedestrian Managers |
9/30/2024 |
10/4/2024 |
Active |
| SB 24-011 |
Allowance for Railroad Facility Permitting (All Types) |
10/21/2024 |
10/25/2024 |
Active |
| SB 24-012 |
Asphalt, Fuel, and Steel Price Adjustment Allowance |
11/21/2024 |
11/27/2024 |
Active |
| SB 24-014 |
Maintenance of Site |
11/21/2024 |
11/27/2024 |
Active |
| SB 24-015 |
Sustainable Construction Requirements |
11/21/2024 |
11/27/2024 |
Active |
| SB 24-016 |
Handling, Transporting, and Disposal of Potential and Identified Contaminated and Hazardous Materials |
12/13/2024 |
12/20/2024 |
Active |
| SB 24-017 |
Expanded Work Allowance |
12/13/2024 |
12/20/2024 |
Active |
| SB 24-018 |
Stormwater Pollution Prevention |
12/13/2024 |
12/20/2024 |
Active |
| SB 24-019 |
Mobilization |
12/17/2024 |
12/24/2024 |
Active |
| SB 24-020 |
Partial Payments for Materials in Advance of Their Incorporation in the Work |
12/17/2024 |
12/24/2024 |
Active |
| SB 25-001 |
Helical Piles (Grout-Filled Core) |
6/4/2025 |
6/13/2025 |
Active |
| SB 25-002 |
Water Main Lock-Out/Tag-Out |
6/4/2025 |
6/13/2025 |
Active |
| SB 25-003 |
Project Sign |
7/7/2025 |
7/14/2025 |
Active |
| SB 25-005 |
Maintenance of Site |
7/7/2025 |
7/14/2025 |
Active |
| SB 25-006 |
Special Modification of Work for Installation of New Curb and Sidewalks |
7/15/2025 |
7/22/2025 |
Active |
| SB 25-007 |
Curing Materials |
8/22/2025 |
8/29/2025 |
Active |
| SB 25-009 |
Sewer Design Standards |
9/25/2025 |
10/2/2025 |
Active |
| SB 25-010 |
Sawcutting Existing Pavement |
11/10/2025 |
11/17/2025 |
Active |
| SB 26-001 |
Curbs, Headers, and Slabs |
4/16/2026 |
4/24/2026 |
Active |
| SB 26-002 |
Concrete Base for Pavement |
4/16/2026 |
4/25/2026 |
Active |
| SB 26-003 |
Split Sleeve Couplings |
4/17/2026 |
4/24/2026 |
Active |
| SB 26-004 |
Catch Basins |
4/17/2026 |
4/24/2026 |
Active |
| SB 26-005 |
Modification of Existing Structures |
4/17/2026 |
4/24/2026 |
Active |
| SB 26-006 |
Subway Sidewalk Frames and Gratings |
5/5/2026 |
5/12/2026 |
Active |
| SB 26-007 |
Sewers to be Kept Clean; Bypass Flow of Sewers and Drains and Temporary Services; Removing and Abandoning Sewers, Water Mains, Etc. |
6/1/2026 |
7/1/2026 |
Active |
| SB 26-008 |
Bypass Plan |
6/1/2026 |
7/1/2026 |
Active |
| SB 26-009 |
NYC DEP Specification for Trunk Main Work, June 1, 2026 |
6/1/2026 |
7/1/2026 |
Active |
| SB 26-010 |
Costs of Tests Borne and Inspection |
6/1/2026 |
7/1/2026 |
Active |
| SB 26-011 |
Temporary Restoration and Cleaning Up |
6/1/2026 |
7/1/2026 |
Active |
| SB 26-012 |
Engineer's Field Office |
6/1/2026 |
7/1/2026 |
Active |
| SB 26-013 |
Tree Consultant |
6/1/2026 |
7/1/2026 |
Active |