Skip to main content
Language

ARCS Commissioning Test Report

Apply

Before you submit your application

  • 1
    Effective 5/11/2020, the NYC Fire Department will no longer accept new applications in paper form. For instructions on how to file online, please review the FDNY Business Support Help Page.
    • 2
      Be sure to select the ARCS Commissioning Test Report category on the FDNY business website.
      • 3
        To submit a New/Amendment ARCS Commissioning Test Report:
        • Completed TM-1 Application for Technology Management Plan Examination/Document Review
        • Copy of DOB PW-1 Application (if applicable)
        • A copy of Department of Buildings Certificate of Occupancy or approved Schedule A
        • An affidavit from the registered design professional indicating the ARC System is designed, installed and operates in compliance with FCC regulations, FC511, Section 917 of the Building Code, NFPA Standard 72 as amended by Appendix Q, 3 RCNY 511-01 and applicable technical criteria
        • Completed TM-ARCS-2 Visual and Functional Testing Form
        • As-built riser diagram and floor plans signed and sealed by the registered design professional
        • Floor plans for the entire building identifying the test grid locations for each floor
        • Delivered audio quality (DAQ) and signal strength measurements for each test grid
        • Audio recording files with an acceptable audio quality at each grid location. An individual file must be provided for each grid and submitted in categorized zip files.
        • A comprehensive list detailing all the manufacturer names and part numbers associated with all equipment, devices and cables utilized in the ARC System.
        • Detailed specification and National Recognized Test Laboratory (NRTL) listing details for all devices, cables and equipment.
        • The make and model # of the spectrum analyzer utilized for testing and when it was last calibrated.
        • A copy of B-03 Certificate of Fitness of the individual performing the test.
        • A copy of the fully executed (with FDNY signatures) “Agreement Allowing use of In-Building Auxiliary Radio Communication System on Fire Department Radio Frequencies”
        • 4
          To submit a Recertification ARCS Commissioning Test Report:
          • Completed TM-ARCS-2 Visual and Functional Testing Form
          • Copy of the Auxiliary Radio Communication System Letter of Approval
          • A copy of Department of Buildings Certificate of Occupancy or approved Schedule A
          • Floor plans for the entire building identifying the test grid locations for each floor
          • Delivered audio quality (DAQ) and signal strength measurements for each test grid
          • Audio recording files with an acceptable audio quality at each grid location. An individual file must be provided for each grid and submitted in categorized zip files.
          • The make and model # of the spectrum analyzer utilized for testing and when it was last calibrated.
          • A copy of B-03 Certificate of Fitness of the individual performing the test.
          • 5
            Note: Complete information and required documents for approval and filing procedures of ARC systems can be viewed on the All Certifications page of the FDNY business website.

            The filing procedure must follow the directions as indicated on the FDNY business website, depending on the type/time of filing of the respective application.
            • Ready to Apply?

              Steps to apply online:

            • 1
              Application Fees:
              • New Application Fees: $420
              • Amended Application Fees: $420
              • Recertification Application Fees: $420
              • Resubmission Fees: No fee required if submitted within 6 months of Letter of Deficiency. After 6 months, application will be considered abandoned, and may require a new filing fee.
              • 2

                Submit the completed application online with all supporting documents.

                • 3

                  You must make payment on FDNY Business to submit your application. To make payments for additional invoiced fees after submission use one of the following methods:


                  Online (preferred):
                  Online (preferred) Payment can be made online at FDNY Business (credit, debit or e-check accepted)


                  US Mail (check must contain FDNY Business Record ID):
                  NYC Fire Department (FDNY)
                  Bureau of Fire Prevention
                  9 MetroTech Center, Attn: Cashier’s Unit (1st Floor)
                  Brooklyn, NY 11201
                  • ARCS Commissioning Test Report Application The online application will open in a new window.
                    Apply Online open_in_new