Silvercup West - Final Environmental Impact Statement

<< Return to EIS page

On June 30, 2006, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Silvercup West proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on May 24, 2006. Written comments on the DEIS were requested and were received by the Lead Agency until the 10th calendar day following the close of the public hearing. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

PDF Document The files below are in PDF format.

Executive Summary (0.30 mb)
Foreword (0.30 mb)
Table of Contents (0.1 mb)
Chapter 1 – Project Description (4.12 mb)
Chapter 2 – Land Use, Zoning and Public Policy (2.19 mb)
Chapter 3 – Socioeconomic Conditions (2.06 mb)
Chapter 4 – Neighborhood Character (1.45 mb)
Chapter 5 – Community Facilities and Services (2.2 mb)
Chapter 6 – Open Space (1.2 mb)
Chapter 7 – Shadows (0.7 mb)
Chapter 8 – Historic Resources (2.04 mb)
Chapter 9 – Traffic and Parking (8.4 mb)
Chapter 10 – Transit and Pedestrians (1.29 mb)
Chapter 11 – Air Quality (0.7 mb)
Chapter 12 – Noise (0.7 mb)
Chapter 13 – Infratructure (0.1 mb)
Chapter 14 – Solid Waste and Sanitation Services (0.1 mb)
Chapter 15 – Energy (0.1 mb)
Chapter 16 – Natural Resources (1.0 mb)
Chapter 17 – Hazardous Materials (1.6 mb)
Chapter 18 – Urban Design and Visual Resources (7.8 mb)
Chapter 19 – Construction Impacts (0.2 mb)
Chapter 20 – Waterfront Revitalization Program (0.8 mb)
Chapter 21 – Public Health (0.1 mb)
Chapter 22 – Generic Analysis of Impacts from Salt Pile Relocation (0.5 mb)
Chapter 23 – Alternatives (0.2 mb)
Chapter 24 – Unavoidable Significant Adverse Impacts (0.1 mb)
Chapter 25 – Growth-Inducing Aspects of the Proposed Action (0.1 mb)
Chapter 26 – Irreversible and Irretrievable Commitments of Resources (0.1 mb)
Chapter 27 – Mitigation (1.7 mb)
Chapter 28 – Response to Comments on the Draft Scoping Document and DEIS (0.1 mb)