DOB’s Boiler Unit oversees the installation and operation of New York City’s boilers. The Boiler Inspection Cycle is from January 1 to December 31. Low- and high-pressure boiler internal and external inspections must be performed and filed with the Department during this cycle.
Property owners are responsible for ensuring boilers operate safely and are in compliance with the Building Code and all related regulations.
Violations for 2023 Failure to File Annual Boiler Inspection Report and Failure to File Affirmation of Correction
The Department will issue violations in September 2024 for failure to file an annual inspection report in 2023 for high pressure and low-pressure boilers. Violations for failure to file an affirmation of correction for defects reported on high-pressure and low-pressure boiler inspection reports for 2023 will be issued in October 2024.
Non-technical Inquiries
(212) 393-2661 or nyc.gov/dobhelp
Monday through Friday, 8:30 am to 4:00 pm
Technical Inquiries
(212) 393-2784
Monday through Friday, 8:30 am to 3:30 pm