Manhattan
East 2nd Street between Avenue C and BendThis street will be closed from 7 am to 4 pm Friday through 12/31/24 for concrete pump and boom truck operations.
East 12th Street between 3rd Avenue and 4th AvenueThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/15/24 to facilitate crane operation.
West 17th Street between 6th Avenue and 5th AvenueThis street will be closed from 5 am to 3 pm Saturday and Sunday through 12/15/24 to facilitate crane operation.
East 19 Street between Broadway and Park Avenue SouthThis street will be closed from 7 am to 6 pm Saturday and Sunday through 12/15/24 for vault repair.
West 21st Street between 6th Avenue and 5th AvenueThis street will be closed from 5 am to 3 pm Saturday and Sunday through 12/15/24 to facilitate crane operation.
East 47th Street between Park Avenue and Vanderbilt AvenueThis street will be closed from 12:01 am to 6 am nightly through 1/16/25 for Grand Central Terminal train shed project.
East 47th Street between Vanderbilt Avenue and Madison AvenueThis street will be closed from 12:01 am to 6 am nightly through 1/16/25 for Grand Central Terminal train shed project.
West 47 Street between Broadway and 8th AvenueThis street will be closed from 12:01 am to 7 am weeknights through 12/23/24 to facilitate crane operation.
East 48th Street between Madison Avenue and Park AvenueThis street will be closed from 12:01 am to 6 am nightly through 12/31/24 to facilitate crane operation.
East 53rd Street between Madison Avenue and 5th AvenueThis street will be closed from 10 pm to 6 am nightly through 12/30/24 to install sewer service.
East 78th Street between 5th Avenue and Madison AvenueThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/22/24 to facilitate crane operation.
East 81st Street between 1st Avenue and 2nd AvenueThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/22/24 for building inspection and minor repairs from boom truck.
West 84th Street between Amsterdam Avenue and BroadwayThis street will be closed from 8 am to 4 pm Saturday through 12/14/24 for conduit installation for new service/service upgrade and manhole enlargement.
West 90th Street between Columbus Avenue and Central Park WestThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/22/24 to facilitate crane operation.
East 91st Street between Lexington Avenue and 3rd AvenueThis street will be closed from 9 am to 3 pm Monday to Friday through 12/31/24 for full roadway closing for knuckle boom and concrete pump while street excavating occurs.
West 93 Street between Columbus Avenue and Central Park WestThis street will be closed from 8 am to 4 pm Saturday through 12/14/24 for use of boom truck for facade inspection.
East 123 Street between Park Avenue and Lexington AvenueThis street will be closed from 8 am to 5 pm Friday, 8 am to 6 pm Saturday, and 8 am to 6 pm Sunday through 12/31/24 to facilitate crane operation.
West 185th Street between Audubon Avenue and Amsterdam AvenueThis street will be closed from 9 pm to 6 am nightly through 12/13/24 to facilitate crane operation.
Haven Avenue between West 173rd Street and West 176th StreetThis street will be closed from 8 am to 4 pm Saturday, and 9 am to 6 pm Sunday through 12/15/24 to facilitate crane operation.
Riverside Drive between West 152nd Street and West 153rd StreetThis street will be closed 24//7 through 12/31/24 for NYCDOT contract HBM1165 rehab, Riverside Drive viaduct over West 158th Street (Safety reasons).
FDR Drive Southbound in the vicinity of East 14 StreetSingle-lane will be closed Monday to Thursday from 11 pm to 5:30 am next morning, Saturday from 12:01 am to 7 am next morning, and Sunday from 1 am to 11 am. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 2 am to 6 am, and Sunday from 2 am to 7 am. Southbound on-ramp at Avenue C, in the vicinity of East 18 Street, will also be closed during the double-lane closure. These closures are necessary to facilitate repairs to the east building facade and will continue through January 15, 2025.
FDR Drive between Montgomery Street and East 15 StreetSingle-lane northbound and/or southbound will be closed Monday to Thursday from 10 pm to 5 am next morning, Saturday from 12:01 am to 9 am, and Sunday from 1 am to 11 am. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 1 am to 7 am. These closures are necessary to facilitate median reconstruction and will continue through August 15, 2026.
FDR Drive Southbound between Jackson Street and Cherry StreetSingle-lane will be closed Friday from 11 pm to 7 am next morning, and Sunday from 11 pm to 10 am next morning. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 1 am to 7 am. These closures are necessary to facilitate East Side Coastal Resiliency Project and will continue through September 11, 2026.
Mercer Street between West 3rd Street and West 4th StreetThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/15/24 to facilitate crane operation.
Charles Street between Bleecker Street and West 4th StreetThis street will be closed from 7 am to 4 pm Friday through 12/31/24 to facilitate crane operation.
MacDougal Street between West 8th Street and MacDougal AlleyThis street will be closed from 7 am to 4 pm Friday through 1/6/25 for concrete operations for foundation and super structure.
MacDougal Street between MacDougal Alley and Washington Square NorthThis street will be closed from 7 am to 4 pm Friday through 1/6/25 for concrete operations for foundation and super structure.
Catherine Lane between Broadway and Lafayette StreetThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/22/24 to facilitate crane operation.
Morris Street between Broadway and Trinity PlaceThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/29/24 for conduit installation.
Mercer Street between Spring Street and Prince StreetThis street will be closed from 8 am to 1 pm Saturday and Sunday through 12/22/24 for knuckle boom rigging/hoisting operation.
Pine Street between William Street and Pearl StreetThis street will be closed from 7 pm to 6 am Monday to Friday, and 8 am to 6 pm Saturday and Sunday through 1/2/25 for installation of sidewalk shed, boom truck.
Platt Street between Gold Street and Pearl StreetThis street will be closed from 10 pm Friday to 5 am Monday through 12/22/24 for crane dismantle operation.
Franklin Street between Hudson Street and Varick StreetThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/22/24 for knuckle boom rigging/hoisting operation.
Jane Street between Washington Street and Greenwich StreetThis street will be closed from 9 am to 4 pm Monday to Friday through 12/20/24 to facilitate crane operation.
Charlton Street between Hudson Street and Greenwich StreetThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/15/24 to facilitate crane operation.
Thames Street between Greenwich Street and Trinity PlaceThis street will be closed from 9 am to 6 pm Monday to Saturday through 12/28/24 for full roadway closure.
John Street between South Street and Front StreetThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/22/24 to facilitate crane operation.
John Street between Front Street and Water StreetThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/22/24 to facilitate crane operation.
Intersection between John Street and Front StreetThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/22/24 to facilitate crane operation.
Front Street between Fletcher Street and John StreetThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/22/24 to facilitate crane operation.
Bedford Street between Grove Street and Barrow StreetThis street will be closed from 9 am to 4 pm Friday through 1/10/25 to excavate and install conduit for new business.
Rivington Street between Bowery and Freeman AlleyThis street will be closed from 10 am to 4 pm Monday to Friday through 12/20/24 for installation of new water service.
Manhattan/Queens
Ed Koch/Queensboro BridgeSingle-lane Queens-bound south upper roadway will be closed 24/7. Double-lane Queens-bound south upper roadway will be closed Monday to Friday from 9:30 am to 3 pm and from 8 pm to 5 am next morning, and Saturday to Sunday from 5 am to 2 pm and from 8 pm to 5 am next morning. Queens-bound south outer roadway will be closed Sunday to Saturday from 11 pm to 6 am next morning. These closures are necessary to facilitate replacement of upper roadway.
Manhattan/Brooklyn
Brooklyn BridgeSingle-lane at a time in both directions will be closed Monday from 10 am to 3 pm for Brooklyn-bound and Wednesday from 12:01 am to 5 am for Manhattan-bound, to facilitate maintenance.
Manhattan BridgeSingle-lane at a time on upper and lower roadways will be closed Monday from 10 pm to 5 am next morning to facilitate maintenance.
Williamsburg BridgeSingle-lane Brooklyn-bound south inner roadway will be closed Monday from 10 am to 3 pm, and from 5 am Tuesday to 5 pm Friday. Single-lane Brooklyn-bound south outer roadway will be closed from 5 am Monday to 5 am Tuesday. These closures are necessary to facilitate Structural Strengthening and rehabilitation.
Manhattan/Bronx
Broadway Bridge over the Harlem RiverRight travel lane in both directions will be closed Monday to Friday from 7 am to 3 pm and alternating center lane will be closed from 10 am to 2 pm. Alternating sidewalk closures will be in effect. These closures are necessary to facilitate machinery repairs and will continue through December 13, 2024.
Bronx
East 157th Street between Courtlandt Avenue and Melrose AvenueThis street will be closed from 9 am to 2 pm Monday to Friday, 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 1/15/25 to facilitate crane operation.
East 158th Street between Elton Avenue and Melrose AvenueThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for booming and pumping operations.
East 213 Street between Holland Avenue and Carlise PlaceThis street will be closed from 9 am to 4 pm Monday to Friday and may also work Saturday from 9 am to 4 pm through 12/31/24 to facilitate crane operation.
East 221st Street between Paulding Avenue and Laconia AvenueThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/23/24 to facilitate crane operation.
East 223rd Street between White Plains Road and Carpenter AvenueThis street will be closed from 8 am to 6 pm Monday to Friday through 12/18/24 for use of boom, knuckle boom and concrete pump to work on new building.
West 262nd Street between Huxley Avenue and BroadwayThis street will be closed from 8 am to 5 pm Monday to Friday through 12/31/24 for use of concrete pumps, boom trucks and knuckle booms.
Walton Avenue between East 140th Street and East 138th StreetThis street will be closed from 9 am to 4 pm Friday through 1/3/25 for use of boom, knuckle boom and concrete pump to work on new building.
Elton Avenue between East 157th Street and East 158th StreetThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for booming and pumping operations.
Park Avenue between East 178th Street and East 180th StreetThis street will be closed from 9 pm to 5 am Monday to Friday through 1/1/25 for water main valve chamber installation, contract# HBX 180.
Park Avenue between East 180th Street and East 181st StreetThis street will be closed from 9 pm to 5 am Monday to Friday through 1/1/25 for water main valve chamber installation, contract# HBX 180.
Bathgate Avenue between East 182nd Street and East 181st StreetThis street will be closed from 9 am to 2 pm Monday to Friday through 12/31/24 for concrete pouring and booming operations new 7 story building.
Inwood Avenue between West 169th Street and West Clarke PlaceThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for use of concrete pumps, boom trucks and knuckle booms.
Andrews Avenue between West 176th Street and West Tremont AvenueThis street will be closed from 9 am to 2 pm Monday through Friday, and 8 am to 4 pm Saturday through 12/16/24 hoisting and pumping operations.
Cruger Avenue between Segamore Street and Bronxdale AvenueThis street will be closed from 8 am to 5 pm weekdays through 12/31/24 for MTA contract C-35311 wok zone and mpt-6.
Furman Avenue between East 240th Street and East 241st StreetThis street will be closed from 7 am to 6 pm Monday to Friday through 12/31/24 to facilitate crane operation.
Blondell Avenue between Fink Avenue and Ponton AvenueThis street will be closed from 9 am to 4 pm Friday through 12/31/24 to facilitate crane operation.
Mohegan Avenue between Hornady Place and Bronx Park SouthThis street will be closed from 9 am to 5 pm Monday to Friday, and 8 am to 6 pm Saturday through 12/31/24 to facilitate crane operation.
Bruckner Boulevard Expressway Unionport Bridge between Brush Avenue and Zerega AvenueBridge will be intermittently closed for 15 minutes at a time Monday to Friday from 12:01 am to 5 am through December 31, 2024, to facilitate testing. Westbound traffic will be stopped at Brush Avenue and Eastbound traffic will be stopped at Zerega Avenue and west side of the bridge. Pedestrian sidewalk and walkway will be stopped at Zerega and Brush Avenues.
Cross Bronx Expressway (I-95) between Arthur Avenue and Clay AvenueSingle-lane will be closed in both directions Monday to Friday from 12:01 am to 5 am and double-lane will be closed from 1 am to 5 am, except holidays. These closures are to facilitate rehabilitation of the bridges overpassing Webster Avenue, Metro-North Railroad, and Third Avenue and will continue through December 14, 2026.
Entrance Ramp from Southbound Sheridan Boulevard (NY-895) to Westbound Bruckner Expressway (I-278)This ramp will be closed through December 24, 2024, to facilitate Hunts Point Interstate Access Improvement Project. Trucks and buses are advised to use the exit ramp towards Edgewater Road/Hunts Point Market and follow the detour signs and use the Leggett Avenue entrance ramp to westbound Bruckner Expressway. Cars are advised to use the temporary exit ramp towards Whitlock Avenue and follow the detour signs to westbound Bruckner Expressway.
Grand Concourse Bridge over Metro-North Railroad - Hudson Line between 151 Street and 153 StreetNorthbound lanes will be closed Monday to Friday from 7 am to 3:30 pm and from 9 pm to 5:30 am next morning, through December 27, 2024, to facilitate structural steel repairs and utility work. Two lanes of traffic in each direction will be maintained on the southbound lanes.
Hutchinson River Parkway between TBTA Access Road and Schley AvenueThis street will be closed from 10 pm to 6 am Friday through 12/31/24 to install flood wall along TBTA property to drive sheet piles with machine.
Major Deegan Expressway (northbound) between Exit 3 and Entrance ramp north of East 138 StreetRight-lane will become an exit only lane at Exit 3 24/7. Additional lane will be closed Monday to Friday from 11 pm to 5 am, Saturday and Sunday from 1 am to 8 am, and Sunday night from 10 pm to 5 am next morning through March 3, 2025, to facilitate East 138 Street Bridge replacement. Full closure may occur Monday to Friday between 12 am and 5 am for demolition and erection of the superstructure.
Major Deegan Expressway (southbound) between Exit 3 and Entrance ramp south of East 138 StreetRight-lane will become an exit only lane at Exit 3 24/7. Additional lane will be closed Monday to Friday from 11 pm to 5 am, Saturday and Sunday from 1 am to 8 am, and Sunday night from 10 pm to 5 am next morning through March 3, 2025, to facilitate East 138 Street Bridge replacement. Southbound exit ramp to 138 Street bridge will be closed Monday to Friday from 11 pm to 5 am, Friday from 11 pm to 6 am next morning, Saturday from 11 pm to 9 am next morning, and Sunday from 11 pm to 5 am next morning to facilitate water main connections.
Pelham Bay BridgeSingle-lane northbound will be closed Monday to Friday from 7 am to 9 am. Single-lane in both directions will be closed Monday to Friday from 9 am to 1 pm and 10 pm to 7 am next morning. These closures are necessary to facilitate stationing all equipment and materials and will continue through December 20, 2024.
Shore Road Bridge over the Hutchinson RiverSingle-lane northbound will be closed Monday to Friday from 7 am to 9 am. Single-lane in both directions will be closed Monday to Friday from 9 am to 1 pm and 10 pm to 7 am next morning. These closures are necessary to facilitate maintenance and will continue through December 27, 2024. One lane of traffic in each direction will be maintained at all times. No closures on December 25, 2024.
Tiebout Avenue between East 187th Street and East 188th StreetThis street will be closed from 9 am to 4 pm Monday to Friday through 12/31/24 to facilitate crane operation, concrete pump and knuckle boom to erect new building.
Creston Street between East 196th Street and East Kingsbridge RoadThis street will be closed from 9 am to 4 pm Friday through 1/24/25 to facilitate crane operation.
Brooklyn/Queens
Grand Street Bridge over Newtown CreekBridge will be closed from 8 pm Friday, December 6 to 5 pm Monday, December 9, and 8 pm Friday, December 13 to 5 am Monday, December 16, 2024, to facilitate bridge rehabilitation. Metropolitan Avenue may be used as an alternate route.
Brooklyn
South 1st Street between Kent Avenue and Wythe AvenueThis street will be closed from 9 am to 3 pm Monday to Friday through 12/17/24 for use of crane to lift steel.
12th Street between 4th Avenue and 5th AvenueThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for hoisting and pumping operations.
East 22nd Street between Beverly Road and Duryea PlaceThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for concrete pump and knuckle boom use.
24th Street between 4th Avenue and 5th AvenueThis street will be fully closed from 9 am to 4 pm Friday through 12/16/24 for booming/pumping operations for new building.
25th Street between 5th Avenue and 4th AvenueThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/29/24 to facilitate crane operation.
East 32 Street between Glenwood Road and Avenue HThis street will be closed from 9 am to 4 pm Friday through 2/20/25 for use of boom, knuckle boom and concrete pump to work on new building.
41st Street between 9th Avenue and 10th AvenueThis street will be closed from 9 am to 4 pm Friday through 12/31/24 to facilitate crane operation.
56th Street between 11th Avenue and 12th AvenueThis street will be closed from 9 am to 4 pm Friday through 3/6/25 to facilitate crane operation.
66th Street between 14th Avenue and New Utrecht AvenueThis street will be closed from 9 am to 4 pm Friday through 2/6/25 for mobile crane operations to erect new building.
82nd Street between 21st Avenue and Bay ParkwayThis street will be closed from 9 am to 4 pm Friday through 2/8/25 for mobile crane operations to erect new 4-story building.
26 Avenue by Belt Parkway Bridge overpassEastbound parking lane will be fenced off as a staging area for underdeck rehabilitation work on the Bely Parkway Bridge. Closure will continue through, approximately end of December 2024. South side sidewalk and eastbound traffic will be maintained at all times. One traffic lane in each direction will be maintained at all times.
Hamilton Bridge over Gowanus CanalSingle-lane in both directions will be closed Monday to Friday from 11 pm to 5 am next morning through December 27, 2024, to facilitate replacing the East Leaf of West Seating Switch and brakes.
Clay Street between Franklin Street and Manhattan AvenueThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for concrete pump and knuckle boom operations.
Dupont Street between Franklin Street and Manhattan AvenueThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for concrete pump and knuckle boom operations.
Sackman Street between Fulton Street and Herkimer StreetThis street will be closed from 9 am to 4 pm Friday through 2/15/25 for use of boom, knuckle boom and concrete pump to work on new building.
Pacific Street between 4th Avenue and 3rd AvenueThis street will be closed from 9 am to 4 pm Friday through 1/9/25 for use of boom, knuckle boom and concrete pump to work on new building.
Carroll Street between Bond Street and Body of WaterThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for use of concrete pump and knuckle boom truck.
Carroll Street between Nevins Street and Gowanus CanalThis street will be closed from 7 am to 6 pm Monday to Friday through 1/9/25 for concrete operations.
Java Street between Water (Dead End) and West StreetThis street will be closed from 7 am to 6 pm Monday to Friday through 12/31/24 for large concrete pours.
Schermerhorn Street between Court Street and Boerum PlaceThis street will be closed from 9 am to 4 pm Friday through 12/31/24 to facilitate crane operation.
India Street between Water (Dead End) and West StreetThis street will be closed from 7 am to 6 pm Monday to Friday through 12/31/24 for large concrete pours.
Wilson Street between Bedford Avenue and Wythe PlaceThis street will be closed from 9 am to 4 pm Friday through 1/25/25 to facilitate crane operation.
Stewart Avenue between Flushing Avenue and Harrison PlaceThis street will be closed from 8 am to 6 pm Saturday and Sunday through 12/31/24 to facilitate crane operation.
Chester Street between Blake Avenue and Dumont AvenueThis street will be closed from 9 am to 5 pm Monday to Saturday through 12/31/24 to facilitate crane operation.
Chester Street between Riverdale Avenue and Livonia AvenueThis street will be closed from 9 am to 4 pm Friday through 2/5/25 for concrete pour for new building.
Livonia Avenue between Junius Street and Powell StreetThis street will be closed 24/7 through 12/23/24 for partial demolition of MTA Station at Junius Station in conjunction with contract A-37140.
Livonia Avenue between Warwick Street and Jerome StreetThis street will be closed 24/7 through 12/31/24 for MTA contract A-37758 package 5 ADA upgrades/elevator replacement.
Junius Street between Livonia Avenue and Riverdale AvenueThis street will be closed 24/7 through 12/23/24 for partial demolition of MTA Station at Junius Station in conjunction with contract A-37140.
Bristol Street between Livonia Avenue and Riverdale AvenueThis street will be closed from 9 am to 5 pm Monday to Friday, and 8 am to 6 pm Saturday through 12/31/24 to facilitate crane operation.
Sackett Street between Bond Street and Gowanus Canal/Body of WaterThis street will be closed 24/7 through 12/31/24 to assist with new building construction operations (CEXR#23DOT017K)
Parkside Avenue between Nostrand Avenue and New York AvenueThis street will be closed from 9 am to 4 pm Friday through 1/23/25 for booming and pumping operations for new building project.
Greene Avenue between Carlton Avenue and Adelphi StreetThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/15/24 to facilitate crane operation.
Blake Avenue between Junius Street and Van Sinderen AvenueThis street will be closed from 6 am to 4 pm Friday, and 5 am to 9 pm Saturday and Sunday through 12/22/24 for mainline track repairs.
Blake Avenue between Van Sinderen Avenue and Snediker AvenueThis street will be closed from 6 am to 4 pm Friday, and 5 am to 9 pm Saturday and Sunday through 12/22/24 for mainline track repairs.
Dumont Avenue between Van Sinderen Avenue and Snediker AvenueThis street will be closed from 6 am to 4 pm Friday through 12/22/24 for mainline track repairs.
Hart Street between Wyckoff Avenue and Irving AvenueThis street will be closed from 7 am to 4 pm Friday through 12/31/24 to facilitate crane operation.
Jefferson Street between Wyckoff Ave and St. Nicholas AvenueThis street will be closed from 9 am to 4 pm Friday through 12/31/24 to facilitate crane operation.
Troutman Street between Wyckoff Avenue and Scott Avenue (St. Nicholas Avenue)This street will be closed from 9 am to 4 pm Friday through 12/31/24 to facilitate crane operation.
Lott Street between Tilden Avenue and Beverly RoadThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for concrete pump and knuckle boom use.
Queens
5th Street between 45th Avenue and 44th DriveThis street will be closed from 9 am to 4 pm Friday through 12/19/24 for associated closure.
24th Street between 41st Avenue and Queens Plaza NorthThis street will be closed from 9 am to 4 pm Friday through 2/20/25 for boom, knuckle boom and concrete pump to work on new building.
28th Road between 31st Street and 33rd StreetThis street will be closed from 9 am to 4 pm Friday through 12/31/24 to facilitate crane operation.
29 Street between 30 Drive and 31 AvenueThis street will be closed from 9 am to 4 pm Friday through 12/21/24 for rebar boom deliveries and concrete pump, boom truck.
30th Street between 40th Avenue and 39th AvenueThis street will be closed from 9 am to 4 pm Friday through 1/5/25 for concrete operations.
35th Avenue between Seaver Way and 127th StreetThis street will be closed from 9 am to 4 pm Friday through 12/20/24 for use of boom truck to hoist precast vault structure for Con Ed.
40th Avenue between 29th Street and 30th StreetThis street will be closed from 9 am to 4 pm Friday through 1/5/25 for concrete operations.
40th Avenue between Northen Boulevard and 30th StreetThis street will be closed from 9 am to 4 pm Friday through 1/5/25 for concrete operations.
44 Street between 34 Avenue and 35 AvenueThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for knuckle boom for concrete pouring.
45 Street between 34 Avenue and Northern BoulevardThis street will be from 9 am to 4 pm Friday through 12/31/24 for knuckle boom for concrete pouring.
45th Road between Vernon Boulevard and 11th StreetThis street will be closed from 9 am to 4 pm Friday through 12/20/24 to facilitate crane operation.
45th Avenue between 5th Street and Vernon BoulevardThis street will be closed from 9 am to 4 pm Friday through 12/19/24 to facilitate crane operation.
50th Avenue between 2nd Street and 5th StreetThis street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 12/15/24 for use of knuckle boom placement to lift guardrails.
78 Avenue between Austin Street and Kew Forest LaneThis street will be closed from 9 am to 4 pm Friday through 12/31/24 for concrete pump, material delivery, boom operations.
94th Avenue between Sutphin Boulevard and 148th StreetThis street will be closed from 9 am to 4 pm Monday to Friday, and Sunday from 9 am to 5 pm through 12/13/24 to facilitate crane operation.
126th Street between 34 Avenue and Roosevelt AvenueThis street will be closed 24/7 through 3/31/25 to install NYCDEP sewer and watermain.
130 Avenue Bridge over Belt ParkwaySingle-lane north side lane and north sidewalk will be closed Monday to Friday from 7 am to 7 pm, Saturday from 8 am to 6 pm, and Sunday from 9 am to 6 pm. These closures are to facilitate bridge rehabilitation and will continue through December 13, 2024. One lane in each direction will be maintained.
149 Place Bridge over LIRR Murray Hill StationBridge deck rehabilitation will take place Monday to Friday from 7 am to 6 pm, and Saturday from 8 am to 6 pm, through December 28, 2024. Half of the roadway and portion of its adjacent sidewalk will be closed on 149 Place between 41 Avenue and Roosevelt Avenue. Barton Avenue will remain accessible and northbound traffic will be maintained. Southbound traffic will be redirected at Roosevelt Avenue to either 149 or 150 Streets.
Woodhaven Boulevard Northbound Service Road between Jamaica Avenue and 56th DriveThis street will be closed from 10 pm to 5 am Saturday and Sunday nights through 12/31/24 to work on elevated tracks to install elevator.
Woodhaven Boulevard Northbound Service Road between 89th Avenue and Jamaica AvenueThis street will be closed from 12:01 am to 6 am Monday to Friday through 12/31/24 to work on elevated tracks to install elevator weeknights.
Belt Parkway between Exit 21B and Exit 20Single-lane westbound will be closed Monday to Thursday from 10 am to 2 pm and 10 pm to 5 am next morning, Friday from 10 pm to 6 am next morning, and Saturday from 10 pm to 11 am next morning. Double-lane westbound will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 2 am to 9 am. These closures are necessary to facilitate JFK Redevelopment Program and will continue through December 31, 2025.
Belt Southern Parkway in the vicinity of Springfield Boulevard BridgeSingle-lane in both directions will be closed Monday to Friday from 10 pm to 5 am next morning and double-lane in both directions will be closed from 1 am to 5 am, through January 3, 2025, to facilitate bridge rehabilitation. At least one lane in each direction will be maintained.
Belt Parkway in the vicinity of Francis Lewis Boulevard Bridge overpassSingle-lane will be closed in both directions Monday to Friday from 10 am to 2 pm and from 10 pm to 5 am next morning. Double-lane in both directions will be closed Monday to Friday from 1 am to 5 am. These closures are to facilitate bridge rehabilitation and will continue through January 3, 2025.
Cross Bay Boulevard BridgeSingle and double-lane will be closed on North Conduit Avenue between 114 Place and Cross Bay Boulevard and South Conduit Avenue between Gemini Fields near 79 Street and continuing on Nassau Expressway to Cross Bay Boulevard. These closures will be Monday to Friday from 9 pm to 6 am next morning and Saturday to Sunday from 9 pm to 7 am next morning through November 29, 2024 to facilitate lead paint removal and protective coating operations.
Cross Island Parkway in the vicinity of Hillside Avenue Bridge overpassSingle-lane at a time in either direction will be closed Monday to Friday from 10 am to 3 pm through December 13, 2024, to facilitate Hillside Avenue Bridge underdeck repairs.
Grand Central Parkway at Long Island Expressway InterchangeSingle-lane eastbound will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 10 pm to 5 am next morning, Friday from 10 pm to 7 am next morning, Saturday from 10 am to 3 pm and from 10 pm to 3 pm next day. Double-lane eastbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 1 am to 9 am. Single-lane westbound will be closed Monday to Friday from 10 am to 3 pm, Monday to Thursday from 10 pm to 5 am next morning, Friday from 10 pm to 6 am next morning, Saturday from 10 am to 3 pm and from 10 pm to 3 pm next day. Double-lane eastbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 6 am, and Sunday from 1 am to 9 am. These closures are necessary to facilitate Safety and Mobility Improvements and will continue through April 23, 2026.
Grand Central Parkway Eastbound between Roosevelt Avenue and 54 AvenueEastbound mainline will be closed for 15 minutes at a time, Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 1 am to 9 am through April 23, 2026, to facilitate sign structure removal and installation. Mainline shoulder lane will be closed 24/7 along the project limit to replace sections with traversable curbs and guiderail.
Grand Central Parkway Eastbound CD Road at Exit 10 between Westbound Long Island Expressway Entrance Ramp and Eastbound Grand Central Parkway Exit 10E RampSingle-lane will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 10 pm to 5 am next morning, Friday from 10 pm to 7 am next morning, Saturday from 10 am to 3 pm and from 10 pm to 3 pm next day. These closures are part of the Safety and Mobility Improvements and will continue through March 31, 2025.
Hillside Avenue Bridge over Cross Island ParkwaySingle-lane westbound will be closed Monday to Friday from 9 am to 7 pm, Saturday from 8 am to 6 pm, and Sunday from 9 am to 6 pm. Double-lane westbound will be closed Monday to Friday from 10 am to 2 pm. The north sidewalk will continue to be closed. These closures are to facilitate rehabilitation and will continue through December 13, 2024.
Nassau Expressway between Cross Bay Boulevard Entrance Ramp and Exit 2NSingle-lane eastbound will be closed Monday to Thursday from 10 am to 3 pm and 9 pm to 5 am next morning, Friday from 10 pm to 7 am next morning, and Saturday from 10 pm to 7 am next morning. Double-lane eastbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 7 am, and Sunday from 12:01 am to 7 am. Eastbound Exit Ramp 2S will be closed Monday to Thursday from 11 pm to 7 am next morning, Friday from 11 pm to 7 am next morning, and Saturday from 11 pm to 7 am next morning. These closures are necessary to facilitate JFK Redevelopment Program and will continue through December 31, 2025.
Van Wyck Expressway in the vicinity of the Roosevelt Avenue Bridge between Northern Boulevard and Long Island ExpresswayDouble-lane southbound will be closed Monday from 11:59 pm to 5 am next morning, Tuesday to Thursday from 11 pm to 5 am next morning, and Friday from 11:59 pm to 6 am, through December 21, 2024, to facilitate reconstruction of the Roosevelt Avenue Bridge.
Van Wyck ExpresswaySingle-lane in both directions will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 10 pm to 6 am, Friday from 11:59 pm to 8 am, Saturday from 11 pm to 10 am, and Sunday from 10 pm to 6 am. Double-lane in both directions will be closed Monday to Thursday from 11 pm to 4 am and Sunday from 1 am to 7 am. Double-lane will be closed Friday from 11 pm to 7 am for northbound and from 11 pm to 5 am for southbound. The exit and entrance ramps along the north and southbound of the expressway may also be closed. These closures are necessary to facilitate roadway widening and will continue through July 14, 2025.
Springfield Boulevard Bridge over Belt Southern Parkway between North Conduit Avenue and South Conduit AvenueCenter median will be closed. Single-lane in each direction and eastern sidewalk will be closed Monday to Friday from 9 am to 2 pm and from 10 pm to 5 am next morning, through January 3, 2025, to facilitate rehabilitation of eastern sidewalk.
Staten Island
New Dorp Lane between Cedar Grove Avenue and Dead EndThis street will be closed 7 am to 6 pm Monday to Friday through 12/21/24 for gas main replacement.
Front Street between Wave Street and Hannah StreetThis street will be closed from 7 am to 6 pm Monday to Friday through 12/23/24 for new Stapleton Waterfront infrastructure.