EIS Documents

On February 10, 2023, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Draft Environmental Impact Statement (DEIS) for the 1160 Flushing Avenue Proposal.

A public hearing on the DEIS will be held on May 24, 2023 at 10:00 AM, in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. To continue to allow for broad public participation, DCP will hold the public hearing accessible both in-person and remotely via the teleconferencing application Zoom. Written comments on the DEIS are requested and will be received and considered by the Lead Agency through June 5, 2023 at 5:00 PM.

To view the 1160 Flushing Avenue Notice of Completion and full DEIS and Appendix, navigate to the 1160 Flushing Avenue project page in ZAP and select Public Documents, then "DEIS_Notice of Completion" and "DEIS_21DCP199K".

Comments can be submitted by email to 21DCP199K_DL@planning.nyc.gov or mailed to Stephanie Shellooe, AICP at Environmental Assessment and Review Division, New York City Department of City Planning, 120 Broadway, 31st Floor, New York, New York 10271.

On April 7, 2023, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Draft Environmental Impact Statement (DEIS) for the 1460-1480 Sheridan Boulevard Proposal.

A public hearing on the DEIS will be held at a later date to be announced. Advance notice will be given of the time and place of the hearing. Written comments on the DEIS are requested and will be received and considered by the Lead Agency until the 10th calendar day following the close of the public hearing.

To view the 1460-1480 Sheridan Boulevard Notice of Completion and full DEIS and Appendix, navigate to the 1460-1480 Sheridan Boulevard project page in ZAP and select Public Documents, then "DEIS_Notice of Completion" and "DEIS_22DCP178X".

Comments can be submitted by email to 22DCP178X_DL@planning.nyc.gov or mailed to Stephanie Shellooe, AICP at Environmental Assessment and Review Division, New York City Department of City Planning, 120 Broadway, 31st Floor, New York, New York 10271.

On April 7, 2023, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Draft Environmental Impact Statement (DEIS) for the South Richmond Zoning Relief Proposal.

A public hearing on the DEIS will be held at a later date to be announced. Advance notice will be given of the time and place of the hearing. Written comments on the DEIS are requested and will be received and considered by the Lead Agency until the 10th calendar day following the close of the public hearing.

To view the South Richmond Zoning Relief Notice of Completion and full DEIS and Appendix, navigate to theSouth Richmond Zoning Relief project page in ZAP and select Public Documents, then "DEIS_Notice of Completion" and "DEIS_20DCP30R".

Comments can be submitted by email to 20DCP130R_DL@planning.nyc.gov or mailed to Stephanie Shellooe, AICP at Environmental Assessment and Review Division, New York City Department of City Planning, 120 Broadway, 31st Floor, New York, New York 10271.

On September 30, 2022, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Innovative Urban Village (ENY CCC) Proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held pm Wednesday, August 24, 2022, in conjunction with the City Planning Commission's public hearing pursuant to ULURP. In support of the City's efforts to contain the spread of COVID-19, DCP held the public scoping meeting remotely. Written comments on the DEIS were requested and accepted by the Lead Agency through 5:00 pm on Tuesday, September 6, 2022. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

To view the Innovative Urban Village (ENY CCC) FEIS Notice of Completion and full FEIS and Appendix, navigate to the Innovative Urban Village (ENY CCC) project page in ZAP and select Public Documents, then "FEIS_Notice of Completion" and "FEIS_20DCP057K".

On September 9, 2022, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Innovation Qns Proposal. 

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on August 10, 2022, at 10:00 am, in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. In support of the City’s efforts to contain the spread of COVID-19, DCP held the public scoping meeting remotely. Written comments on the DEIS were requested and accepted by the Lead Agency through Monday,  August 22, 2022 by 5:00 pm. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS. 

To view the Innovation Qns FEIS Notice of Completion and full FEIS and Appendix, navigate to the Innovation QNS Rezoning and LSGD project page in ZAP and select Public Documents, then "FEIS_Notice of Completion," "FEIS_21DCP180Q," "Technical Memorandum 001" and "Technical Memorandum 002".

On July 14, 2022, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Halletts North Proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held pm Wednesday, June 8, 2022, at 10:00 am, in conjunction with the City Planning Commission's public hearing pursuant to ULURP. In support of the City's efforts to contain the spread of COVID-19, DCP held the public scoping meeting remotely. Written comments on the DEIS were requested and accepted by the Lead Agency through 5:00 pm on Tuesday, June 21, 2022. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

To view the Halletts North FEIS Notice of Completion and full FEIS and Appendix, navigate to the Hallets North project page in ZAP and se lect Public Documents, then "FEIS_Notice of Completion", "FEIS_21DCP138Q" and "Technical Memorandum".

On April 14, 2022, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the One 45 – Museum of Civil Rights Proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, March 2, 2022, at 10:00 am, in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. In support of the City’s efforts to contain the spread of COVID-19, DCP held the public scoping meeting remotely. Written comments on the DEIS were requested and accepted by the Lead Agency through Monday,  March 14, 2022 by 5:00 pm. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

To view the One 45-Museum of Civil Rights FEIS Notice of Completion and full FEIS and Appendix, navigate to the One 45 Museum of Civil Rights project page in ZAP and select Public Documents, then "FEIS_Notice of Completion" and "FEIS_21DCP167M".

On November 5, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the River Ring proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, October 6, 2021, at 10:00 am, in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. In support of the City’s efforts to contain the spread of COVID-19, DCP held the public scoping meeting remotely. Written comments on the DEIS were requested and accepted by the Lead Agency through Monday, October 18, 2021 by 5:00 pm. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the FEIS for River Ring.

On October 22, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for Starrett-Lehigh and Terminal Warehouse.

The Draft Environmental Impact Statement (DEIS) and its Notice of Completion were issued on June 21, 2021. A public hearing on the DEIS was held on September 22, 2021, at the City Planning Commission Hearing Room, Lower Level, 120 Broadway, New York, NY 10271, accessible in person and remotely in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Written comments on the DEIS were requested and received by the Lead Agency through October 4, 2021. The FEIS addresses all substantive comments made on the DEIS during the public hearing and subsequent comment period and incorporates updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Starrett-Lehigh and Terminal Warehouse FEIS Technical Memorandum - November 30, 2021

View the FEIS for Starrett-Lehigh and Terminal Warehouse.

On October 8, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for 250 Water Street. The FEIS and the Notice of Completion were revised on October 10, 2021 to reflect a small number of additional comments and responses.

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Wednesday September 1, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. The public hearing also considered a modification to the Proposed Action (ULURP No. C 210438(A) ZSM). Written comments on the DEIS were requested and accepted by the Lead Agency through Monday, September 13, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the FEIS for 250 Water Street Proposal.

On October 22, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for Starrett-Lehigh and Terminal Warehouse.

The Draft Environmental Impact Statement (DEIS) and its Notice of Completion were issued on June 21, 2021. A public hearing on the DEIS was held on September 22, 2021, at the City Planning Commission Hearing Room, Lower Level, 120 Broadway, New York, NY 10271, accessible in person and remotely in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Written comments on the DEIS were requested and received by the Lead Agency through October 4, 2021. The FEIS addresses all substantive comments made on the DEIS during the public hearing and subsequent comment period and incorporates updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Starrett-Lehigh and Terminal Warehouse FEIS Technical Memorandum - November 30, 2021

View the FEIS for Starrett-Lehigh and Terminal Warehouse.

On October 8, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for SoHo/NoHo Neighborhood Plan proposal..

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Thursday, September 2, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. Written comments on the DEIS were requested and accepted by the Lead Agency through Monday, September 13th, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post SoHo-NoHo Neighborhood Plan FEIS Technical Memorandum - December 14, 2021

This file has been updated to reflect a change noted in an Errata issued on January 5, 2022. PDF Document View the Errata.

View the FEIS for SoHo-NoHo Neighborhood Plan.

On October 8, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for Citywide Hotel Text Amendment.

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Wednesday, July 14, 2021, in conjunction with the City Planning Commission’s public hearing. Written comments on the DEIS were received and considered by the Lead Agency through July 26, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Citywide Hotel Text Amendment FEIS Technical Memorandum - November 30, 2021

View the FEIS for Citywide Hotel Text Amendment.

On October 7, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for 175 Park Avenue (formerly known as Project Commodore - Grand Hyatt).

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Wednesday, September 1, 2021, in conjunction with the City Planning Commission’s public hearing. Written comments on the DEIS were received and considered by the Lead Agency through September 13, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post 175 Park Avenue FEIS Technical Memorandum - December 14, 2021

View the FEIS for 175 Park Avenue.

On September 24, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for Stevenson Commons..

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Wednesday, August 18, 2021, in conjunction with the City Planning Commission’s public hearing. Written comments on the DEIS were received and considered by the Lead Agency through August 30, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Stevenson Commons.

On August 20, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for River North (formerly Liberty Towers).

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Wednesday, July 14, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP.  Written comments on the DEIS were received and considered by the Lead Agency through Monday, July 26, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post River North FEIS Technical Memorandum - October 29, 2021

View the FEIS for River North.

On August 20, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the 307 Kent Avenue Rezoning proposal.

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Wednesday, July 14, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. Written comments on the DEIS were received and considered by the Lead Agency through Monday.July 26, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the FEIS for 307 Kent Avenue.

On September 10, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the 343 Madison Avenue proposal.

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Wednesday 18th, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. Written comments on the DEIS were requested and accepted by the Lead Agency through Monday, August 30th, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post 343 Madison Avenue FEIS Technical Memorandum - November 16, 2021

View the FEIS for 343 Madison Avenue.

On September 10, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Gowanus Neighborhood Rezoning proposal.

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Wednesday, July 28, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. Written comments on the DEIS were received and considered by the Lead Agency through August 9, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Gowanus Neighborhood Rezoning FEIS Technical Memorandum II - November 16, 2021
View the PDF Document Post Gowanus Neighborhood Rezoning FEIS Technical Memorandum - September 21, 2021

View the FEIS for Gowanus Neighborhood Rezoning.

On September 10, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the New York Blood Center - Center East proposal.

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Thursday, July 29, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. Written comments on the DEIS were received and considered by the Lead Agency through Monday, August 9, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post New York Blood Center - Center East FEIS Technical Memorandum - November 16, 2021

View the FEIS for New York Blood Center.

On March 5, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the proposed Zoning for Coastal Flood Resiliency Text Amendment.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, February 3, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. In support of the City’s efforts to contain the spread of COVID-19, DCP held the public scoping meeting remotely. Written comments on the DEIS were requested, received, and considered by the Lead Agency through Tuesday, February 16, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Zoning for Coastal Flood Resiliency Text Amendment FEIS Technical Memorandum -April 30, 2021.

View the FEIS for Zoning for Coastal Flood Resiliency Text Amendment.

On September 10, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the 960 Franklin Avenue Rezoning proposal.

The public hearing was held in person in the NYC City Planning Commission Hearing Room, Lower Concourse, 120 Broadway, New York, NY and accessible remotely, on Thursday, July 29, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. Written comments on the DEIS were received and considered by the Lead Agency through Monday, August 9, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the FEIS for 960 Franklin Avenue.

On March 26, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Acme Fish Expansion proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, February 17, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. In support of the City’s efforts to contain the spread of COVID-19, DCP held the public scoping meeting remotely. Written comments on the DEIS were requested, received, and considered by the Lead Agency through Monday, March 1, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Acme Fish Expansion.

On January 23, 2020, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Lenox Terrace proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, December 18, 2019, at 10:00 am in the City Planning Commission Hearing Room at 120 Broadway, Lower Concourse, New York, NY 10271, in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. Written comments on the DEIS are requested and will be received and considered by the Lead Agency through Monday, January 6, 2020. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Lenox Terrace FEIS Technical Memorandum 001 – January 31, 2020

View the FEIS for Lenox Terrace.

On August 7, 2020, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Industry City proposal.

A public hearing on the DEIS was held on Wednesday, February 19, 2020, at 10:00 am in the City Planning Commission Hearing Room at 120 Broadway, Lower Concourse, New York, NY 10271, in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. Written comments on the DEIS were requested and accepted through Monday, March 2, 2020. The FEIS will incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Industry City.

On January 10, 2020, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the GO Broome Street Development proposal.

A public hearing on the DEIS was held on Wednesday, December 4, 2019, at 10:00 am in the City Planning Commission Hearing Room at 120 Broadway, Lower Concourse, New York, NY 10271, in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. The public hearing considered modifications to the Proposed Actions (ULURP No. C200061(A) ZSM). Written comments on the DEIS were requested and accepted through Monday, December 16, 2019. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the FEIS for GO Broome Street Development.

On March 5, 2021, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the proposed Zoning for Coastal Flood Resiliency Text Amendment.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, February 3, 2021, at 10:00 am in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. In support of the City’s efforts to contain the spread of COVID-19, DCP held the public scoping meeting remotely. Written comments on the DEIS were requested, received, and considered by the Lead Agency through Tuesday, February 16, 2021. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Zoning for Coastal Flood Resiliency Text Amendment FEIS Technical Memorandum -April 30, 2021.

View the FEIS for Zoning for Coastal Flood Resiliency Text Amendment.

On September 13, 2019, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) the Bronx Special Natural Area District Update proposal.

A public hearing on the DEIS was held on Wednesday, August 14, 2019 at 10:00am in the City Planning Commission Hearing Room at 120 Broadway, Lower Concourse, New York, NY 10271, in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. The public hearing also considered modifications to the Proposed Actions (ULURP No. N190430(A) ZRY). The public hearing on the DEIS and ULURP applications was continued on Wednesday, August 28, 2019 at 10:00am in the City Planning Commission Hearing Room. Written comments were requested on the DEIS and were accepted through Monday, September 9, 2019. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS. 

View the FEIS for Bronx Special Natural Area Districts Update.

On September 13, 2019, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Peninsula Hospital Site Redevelopment proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held Wednesday, August 14, 2019, at 10:00 am in the City Planning Commission Hearing Room at 120 Broadway, Lower Concourse, New York, NY 10271, in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. Written comments on the DEIS were requested and accepted through Monday, August 26, 2019. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Peninsula Hospital Site Redevelopment FEIS Technical Memorandum 001 – November 12, 2019

View the FEIS for Peninsula Hospital Site Redevelopment.

On April 11, 2019, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Bay Street Corridor Rezoning and Related Actions proposal.

A public hearing on the DEIS wias held on Wednesday, February 27, 2019, at 10:00 am in the City Planning Commission Hearing Room at 120 Broadway, Lower Concourse, New York, NY 10271, in conjunction with the City Planning Commission’s public hearing pursuant to ULURP. The public hearing will also consider modifications to the Proposed Actions (ULURP Nos. N190114(A) ZRR and C190179(A) HAR). Comments were requested on the DEIS and were accepted through Monday, March 11, 2019. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Bay Street Corridor Rezoning FEIS Technical Memorandum 002 – June 14, 2019

View the FEIS for Bay Street Corridor.

On November 23, 2018, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Two Bridges LSRD.

A public hearing on the DEIS was held on Wednesday, October 17, 2018, at 10:00 am in the City Planning Commission Hearing Room at 120 Broadway, Lower Level, New York, New York 10271.  Comments were requested on the DEIS and were accepted until 5 pm on Monday, October 29, 2018. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Two Bridges LSRD.

On October 5, 2018, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the M1 Hotel Text Amendment Proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, July 25, 2018, at 10:00 AM in the CPC Public Hearing Room, located in Lower Concourse at 120 Broadway, New York, New York 10271, in conjunction with the CPC's citywide public hearing pursuant to Section 200 of the City Charter. The public hearing also considered a modification to the zoning text amendment (ULURP No. N 180349(A) ZRY). Written comments on the DEIS were requested and accepted through Monday, August 6, 2018. The FEIS incorporates responses to the public comments received on the DEIS and updated analysis conducted subsequent to the completion of the DEIS.

View the  PDF Document PostvM1 Hotel Text Amendment FEIS Technical Memorandum 002 – December 19, 2018
View the  PDF Document Post M1 Hotel Text Amendment FEIS Technical Memorandum 001 – October 12, 2018

View the FEIS for M1 Hotel Text Amendment.

On April 27, 2018, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a  PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Block 675 East proposal.

A public hearing on the DEIS was held on Wednesday, March 14, 2018, at 10:00 am at the Department of City Planning, located at 120 Broadway, Lower Concourse, New York, New York 10271, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. The public hearing also considered modifications to the Proposed Actions (ULURP Nos. N180128(A) ZRM, 180129(A) ZSM, N180151(A) ZRM and 180152(A) ZSM). Comments were requested on the DEIS were accepted until Monday, March 26, 2018. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Block 675 East FEIS Technical Memorandum 002 – June 22, 2018.

View the FEIS for Block 675 East.

On September 1, 2017, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Draft Environmental Impact Statement (DEIS) for the Riverside Galleria proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) will be held on Wednesday, December 13, 2017, at 10:00 am in Spector Hall, 22 Reade Street, New York, New York, in Manhattan, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Written comments on the DEIS are requested and will be received and considered by the Lead Agency until December 26, 2017 the 10th calendar day following the close of the public hearing.

View the DEIS for Riverside Galleria.

On January 5, 2018, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Jerome Avenue Rezoning proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held at 10:00AM on Wednesday, November 29, 2017, in Spector Hall, at the Department of City Planning, 22 Reade Street, in Lower Manhattan, in conjunction with the City Planning Commission's citywide public hearing pursuant to ULURP. The public hearing also considered a modification to the Proposed Action (ULURP Nos. 180051(A) ZMX, & N 180050(A) ZRX). Comments were requested on the DEIS were accepted until Monday, December 11, 2017. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Jerome Avenue Rezoning FEIS Technical Memorandum 002 – March 9, 2018

View the FEIS for Jerome Avenue Rezoning.

On August 25, 2017, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued PDF Document Notice of Completion for a Final Environmental Impact Statement (DEIS) for the South Avenue Retail Development.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, July 26, 2017, at 10:00 am at Spector Hall, 22 Reade Street, New York, New York, in Manhattan, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Written comments on the DEIS were requested and were received and considered by the Lead Agency until August 7, 2017 the 10th calendar day following the close of the public hearing.

View the FEIS for South Avenue Retail Development.

On October 20, 2017, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Self-storage Text Amendment.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, August 23, 2017, at 9:30 AM in the Manhattan Municipal Building, Mezzanine level, 1 Centre Street, New York, New York 10007 (access through the North Entrance), in conjunction with CPC’s citywide public hearing pursuant to ULURP. The public hearing also considered a modification to the Proposed Action, (ULURP No. N 170425 (A) ZRY). Written comments on the DEIS were requested and were accepted by the Lead Agency until 5: 00 pm on Tuesday, September 5, 2017. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Self-storage Text Amendment FEIS Technical Memorandum 002 – December 8, 2017

View the FEIS for Self-storage Text Amendment.

On September 8, 2017, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Pfizer Sites Rezoning proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, July 26, 2017, at 10:00 am at Spector Hall, 22 Reade Street, New York, New York, in Manhattan, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Written comments on the DEIS wererequested and were received and considered by the Lead Agency until August 7, 2017 the 10th calendar day following the close of the public hearing.

View the FEIS for Pfizer Sites Rezoning.

On September 19, 2017, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the East Harlem Rezoning proposal.

A public hearing on the DEIS was held on Wednesday, August 23rd, 2017, at 2:00 PM in the Manhattan Municipal Building, Mezzanine level, 1 Centre Street, New York, New York 10007, in conjunction with the CPC's citywide public hearing pursuant to ULURP. The public hearing also consider a modification to the Proposed Action, (ULURP No. N 170359 (A) ZRM). Written comments on the DEIS were requested and accepted by the Lead Agency until Tuesday, September 5th, 2017. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post East Harlem Rezoning FEIS Technical Memorandum 002 – September 29, 2017

View the PDF Document Post East Harlem Rezoning FEIS Technical Memorandum 003 – November 28, 2017

View the PDF Document Post East Harlem Rezoning FEIS Technical Memorandum 004 - December 14, 2018

View the FEIS for East Harlem Rezoning.

On May 12, 2017, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Boulevard at Hylan Plaza proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, August 24, 2016, at 10:00 am at Spector Hall, 22 Reade Street, New York, New York, in Manhattan, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Written comments on the DEIS were requested and were received and considered by the Lead Agency until September 6, 2016 the 10th calendar day following the close of the public hearing.

View the FEIS for Boulevard at Hylan Plaza Proposal.

On May 26, 2017, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Greater East Midtown Rezoning proposal.

A public hearing on the DEIS was held on Wednesday, April 26th, 2017, at 10:00 AM in Spector Hall, at the Department of City Planning located at 22 Reade Street, New York, New York 10007, in conjunction with the CPC's citywide public hearing pursuant to ULURP. The public hearing also consider a modification to the Proposed Action, (ULURP No. N 170186 (A) ZRM). Written comments on the DEIS were requested and accepted by the Lead Agency until Monday, May 8th, 2017. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Greater East Midtown Rezoning FEIS Technical Memorandum 002 – June 2, 2017
View the PDF Document Post Greater East Midtown Rezoning FEIS Technical Memorandum 003 – August 4, 2017

View the FEIS forGreater East Midtown Rezoning.

On October 6, 2016, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the 550 Washington Street/Special Hudson River Park District Proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, August 24, 2016, at 10:00 am at Spector Hall, 22 Reade Street, New York, New York, in Manhattan, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Written comments on the DEIS were requested and were received and considered by the Lead Agency until September 6, 2016 the 10th calendar day following the close of the public hearing.

View the PDF Document  Post 550 Washington Street/Special Hudson River Park District Proposal FEIS Technical Memorandum 001 - October 17, 2016

View the PDF Document  Post 550 Washington Street/Special Hudson River Park District Proposal FEIS Technical Memorandum 002 - December 9, 2016

View the FEIS for 550 Washington Street/Special Hudson River Park District.

On April 22, 2016, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (DEIS) for the 102-05 Ditmars Blvd. Parking Garage Proposal.

A public hearing on the DEIS will be held on Wednesday, August 10th, 2016 at 10:00 am in Spector Hall, at the Department of City Planning located at 22 Reade Street, New York, New York 10007. Comments are requested on the DEIS and will be accepted until Monday, August 22nd, 2016.

View the DEIS for 102-05 Ditmars Blvd. Parking Garage Proposal.

On February 12, 2016, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (DEIS) for the East New York Rezoning Proposal.

A public hearing on the DEIS was held on Wednesday, January 6th, 2016, at 10:00 AM, in the Courtroom Auditorium at Brooklyn Borough Hall, 209 Joralemon Street, Second Floor, Brooklyn, New York. Written comments on the DEIS were requested by the Lead Agency until Tuesday, January 19th, 2016. The FEIS incorporates responses to comments received on the DEIS subsequent to the completion of the DEIS.

View the PDF Document  Post East New York Rezoning Proposal Final Environmental Impact Statement FEIS Technical Memorandum 001 – February 24, 2016
View the PDF Document  Post East New York Rezoning Proposal Final Environmental Impact Statement FEIS Technical Memorandum 002 – April 15, 2016

View the FEIS for East New York Rezoning Proposal.

On January 22, 2016, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Zoning for Quality and Affordability Text Amendment.

A public hearing on the DEIS was held on Wednesday, December 16, 2015, at 9:00 AM in the National Museum of the American Indian at the historic Alexander Hamilton U.S. Custom House located at One Bowling Green, in Lower Manhattan, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Written comments on the DEIS were requested and were accepteded by the Lead Agency until 5 pm on Monday, December 28, 2015. The FEIS incorporates responses to comments received on the DEIS subsequent to the completion of the DEIS.

View the PDF Document Post Zoning for Quality and Affordability Text Amendment FEIS Technical Memorandum 001 – February 03, 2016
View the PDF Document Post Zoning for Quality and Affordability Text Amendment FEIS Technical Memorandum 002 – March 18, 2016

View the FEIS for Zoning for Quality and Affordability Text.

On June 19, 2015, the New York City Department of City Planning, on behalf of the City Planning Commission as the lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Staten Island Mall Enlargement project.

A public hearing on the Draft Environmental Impact Statement was held on Wednesday, May 6, 2015, at 10:00 am in Spector Hall, at the Department of City Planning located at 22 Reade Street, New York, New York 10007.

Written comments on the DEIS were requested and accepted by the Lead Agency until 5 pm on Monday, May 18, 2015.

View the FEIS for Staten Island Mall Enlargement.

On March 20, 2015, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Vanderbilt Corridor and One Vanderbilt project.

A public hearing on the DEIS was held on February 4, 2015. The public hearing also considered modifications to the proposed action (ULURP No. 150130(A) ZSM). Written comments on the DEIS were requested and were received by the Lead Agency until February 17, 2015. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Vanderbilt Corridor and One Vanderbilt FEIS Technical Memorandum 002 – March 27, 2015
View the PDF Document Post Vanderbilt Corridor and One Vanderbilt FEIS Technical Memorandum 003 – May 15, 2015.

View the FEIS for Vanderbilt Corridor and One Vanderbilt.

On September 19, 2014, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Astoria Cove Development project.

A public hearing on the DEIS was held on Wednesday, August 6, 2014, at 10:00 AM in Spector Hall, at the Department of City Planning located at 22 Reade Street in Manhattan, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. The public hearing also considered modifications to the applicant’s ULURP application (ULURP Nos. C140323(A)ZSQ, C140324(A)ZSQ, and N140329(A)ZRQ). Written comments on the DEIS were requested and accepted by the Lead Agency until Monday, August 18, 2014. The FEIS incorporates responses to comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Post Astoria Cove Development FEIS Technical Memorandum 002 – September 26, 2014.
View the PDF Document Post Astoria Cove Development FEIS Technical Memorandum 003 – November 14, 2014.

View the FEIS for Astoria Cove Development.

On March 21, 2014, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency,issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Rockefeller University New River Building and Fitness Center project.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, February 19, 2014 at 10:00 AM in Spector Hall, at the Department of City Planning, 22 Reade Street , in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Comments were requested on the DEIS and accepted until Monday, March 3, 2014. The FEIS incorporates responses to comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Rockefeller University New River Building and Fitness Center.

On March 7, 2014, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for 606 West 57th Street.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, January 22, 2014 at 10:00 AM in Spector Hall, at the Department of City Planning, 22 Reade Street, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Comments were requested on the DEIS and accepted until Monday, February 3, 2014. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for 606 West 57th Street.

On October 11, 2013, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Rheingold Rezoning.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, September 11, 2013 at 10:00 AM in Spector Hall, at the Department of City Planning, 22 Reade Street, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Comments were requested on the DEIS and accepted until Monday, September 23, 2013. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Rheingold Rezoning.

On August 30, 2013, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the East Fordham Road Rezoning.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, July 24, 2013 at 10:00 AM in Spector Hall, at the Department of City Planning, 22 Reade Street, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Written comments on the DEIS were requested and accepted until Monday, August 5, 2013. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for East Fordham Road.

On August 9, 2013, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for Halletts Point Rezoning.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, July 10 and July 24, 2013, at 10:00 AM in Spector Hall, at the Department of City Planning, 22 Reade Street, in conjunction with the City Planning Commission’s citywide public hearing pursuant to ULURP. Written comments on the DEIS were requested and accepted until Monday, August 5, 2013. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Halletts Point Rezoning.

On September 20, 2013, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the East Midtown Rezoning and Related Actions project.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, August 7, 2013, at 9:00 AM, in the George Gustav Heye Center, National Museum of the American Indian, Alexander Hamilton U.S. Custom House, One Bowling Green, New York, NY 10004, in conjunction with the CPC's citywide public hearing pursuant to ULURP. The public hearing also considered a modification to the Proposed Action, (ULURP No. 130247(A) ZRM). Written comments on the DEIS were requested and accepted until Monday, August 19, 2013. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

PDF Document View the Post East Midtown Rezoning and Related Actions FEIS Technical Memorandum – September 27, 2013.

View the FEIS for East Midtown Rezoning.

On January 11, 2013, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Hudson Square Rezoning project.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held at 10:00AM on Wednesday, November 28, 2012, in Spector Hall, at the Department of City Planning, 22 Reade Street, in Lower Manhattan, in conjunction with the City Planning Commission's citywide public hearing pursuant to ULURP. The public hearing also considered a modification to the Proposed Action (ULURP No. 120381(A)ZRM). Comments were requested on the DEIS were accepted until Monday, December 10, 2012. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Hudson Square Rezoning.

On December 7, 2012, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a  PDF Document Notice of Completion for a Final Supplemental Environmental Impact Statement (FSEIS) for the 625 West 57th Street project.

A public hearing on the Draft Supplemental Environmental Impact Statement (DSEIS) was held at 10:00AM on Wednesday, November 14, 2012, in Spector Hall, at the Department of City Planning, 22 Reade Street, in Lower Manhattan, in conjunction with the City Planning Commission's citywide public hearing pursuant to ULURP. Written comments were requested and were accepted by the Lead Agency until Monday, November 26, 2012.   The FSEIS incorporates responses to the public comments received on the DSEIS and additional analysis conducted subsequent to the completion of the DSEIS.

View the FEIS for 625 West 57th Street.

On August 24, 2012, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the West Harlem Rezoning project.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held at 10:00AM on Wednesday, July 25, 2012, in Spector Hall, at the Department of City Planning, 22 Reade Street, in Lower Manhattan, in conjunction with the City Planning Commission's citywide public hearing pursuant to ULURP. Comments were requested on the DEIS and were accepted until Monday, August 6, 2012. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

PDF Document View the Post West Harlem Rezoning FEIS Technical Memorandum - September 5, 2012.
PDF Document View the Post West Harlem RezoningFEIS Technical Memorandum - October 26, 2012.

View the FEIS West Harlem Rezoning.

On May 25, 2012, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the NYU Core project.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, April 25, 2012.  Written comments on the DEIS were requested and were accepted by the Lead Agency until Monday, May 7, 2012. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

PDF Document View the Post NYU Core FEIS Technical Memorandum.

View the FEIS for NYU Core.

On January 12, 2012, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Saint Vincents Campus Redevelopment project.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, November 30, 2011 at 10:00 AM in Spector Hall, at the Department of City Planning located at 22 Reade Street, New York, New York 10007.  Comments on the DEIS were requested and received by the Lead Agency until Monday, December 12, 2011. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Saint Vincents Campus Redevelopment.

On August 26, 2011, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Crotona Park East/West Farms Rezoning project.

A public hearing was held on Wednesday July 27, 2011 at 10:00AM in Spector Hall, at the Department of City Planning located at 22 Reade Street, New York, New York 10007. Comments on the DEIS were requested and received by the lead agency until Monday, August 8, 2011.  The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the FEIS.

View the FEIS for Crotona Park East/West Farms Rezoning.

On August 12, 2011, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for Brooklyn Bay Center project.

A public hearing on the DEIS was held on Wednesday, July 13, 2011, at 10:00 AM in Spector Hall, at the Department of City Planning located at 22 Reade Street, New York, New York 10007. Comments were requested on the DEIS and were accepted until Monday, July 25, 2011. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Brooklyn Bay Center.

On February 4, 2011, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion of the Final Environmental Impact Statement (FEIS) for Webster Avenue Rezoning.

A public hearing on the DEIS was held on Wednesday, January 5, 2011, at 10:00 AM in Spector Hall, at the Department of City Planning located at 22 Reade Street, New York, New York 10007. Comments were requested on the DEIS and were be accepted until Tuesday, January 18, 2011. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Webster Avenue Rezoning.

On September 3, 2010, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for Sugar Hill Rezoning Project.

A public hearing on the DEIS was held on Wednesday, July 28, 2010, at 10:00 AM in Spector Hall, at the Department of City Planning located at 22 Reade Street, New York, New York 10007. Comments were requested on the DEIS and the public comment period remained open until Monday, August 9, 2010. 

View the FEIS for Sugar Hill.

On October 15, 2010, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Supplemental Environmental Impact Statement (Final SEIS) for the Riverside Center project.

A public hearing on the Draft SEIS was held on Wednesday, September 15, 2010. Comments were accepted at the hearing and for ten days following the hearing until Monday, September 27, 2010. The Final SEIS incorporates responses to the public comments received on the Draft SEIS and additional analysis conducted subsequent to the completion of the Draft SEIS.

View the FEIS for Riverside Center.

On July 2, 2010, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for 15 Penn Plaza project.

A public hearing on the DEIS was held on Wednesday, May 26, 2010, at 10:00 AM in Spector Hall, at the Department of City Planning located at 22 Reade Street, New York, New York 10007. Comments were requested on the DEIS and were be accepted until Monday, June 7, 2010. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for 15 Penn Plaza.

On May 28, 2010, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Domino Sugar Rezoning project.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, April 28, 2010. Comments were accepted at the hearing and for ten days following the hearing until Monday, May 10, 2010. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Notice of Completion for the Final Environmental Impact Statement.

View the FEIS for Domino Sugar Rezoning .

On October 9, 2009, the New York City Planning Commission and the Metropolitan Transportation Authority, acting as co-lead agencies, issued a PDF Document Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Western Rail Yard project.

A public hearing to hear oral comments on the DEIS was held on Wednesday, September 9, 2009 at 22 Reade Street, New York, New York 10007. Written comments on the DEIS were accepted at the hearing and until Monday, September 21, 2009. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Western Rail Yard.

On August 28, 2009, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the 53 West 53rd Street project.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, July 22, 2009. Comments were accepted at the hearing and for ten days following the hearing until Monday, August 3, 2009. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Notice of Completion for the Final Environmental Impact Statement.

View the FEIS for 53 West 53rd Street.

On August 7, 2009, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the 161st Street/ River Avenue Rezoning.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on March 27, 2009. Comments were accepted at the hearing and for ten days following the hearing until April 6, 2009. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Notice of Completion for the Final Environmental Impact Statement.

View the FEIS for 161st Street/River Avenue Rezoning.

On May 8, 2009, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Lower Concourse Rezoning and Related Actions.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, April 1, 2009. Comments were accepted at the hearing and for ten days following the hearing until Monday, April 13th, 2009. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Notice of Completion for the Final Environmental Impact Statement.

View the FEIS for Lower Concourse Rezoning and Related Actions.

On April 10, 2009, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Fordham University Lincoln Center Master Plan.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on Wednesday, March 4th, 2009. Comments were accepted at the hearing and for ten days following the hearing until March 16, 2009. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Notice of Completion for the Final Environmental Impact Statement.

View the FEIS for Fordham University Lincoln Center Master Plan.

On March 6, 2009, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the proposed 770 11th Avenue Mixed-Use Development Rezoning.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on February 4, 2009. Comments were accepted at the hearing and for ten days following the hearing, until February 17, 2009. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Notice of Completion for the Final Environmental Impact Statement.

View the FEIS for 770 11th Avenue Mixed-Use Development Rezoning.

On February 6, 2009, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the proposed 363-365 Bond Street project.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on January 7, 2009. Comments were accepted at the hearing and for ten days following the hearing, until January 20, 2009. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the PDF Document Notice of Completion for the Final Environmental Impact Statement.

View the FEIS for 363-365 Bond Street.

On July 23rd, 2008, a public hearing was held for the proposed Dutch Kills Rezoning and Related Actions. Comments were accepted at the hearing and for ten days following the hearing, until August 4th, 2008. The New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the proposed Dutch Kills Rezoning and Related Actions, on August 29th, 2008.

View the FEIS for Dutch Kills Rezoning and Related Actions.

On August 13, 2008, a public hearing was held for the proposed East Village/Lower East Side Rezoning. Comments were accepted at the hearing and for ten days following the hearing, until August 25th, 2008. The New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the East Village/Lower East Side Rezoning on September 26, 2008.

View the FEIS for East Village/Lower East Side Rezoning.

On July 2, 2008, a public hearing was held on the Draft Environmental Impact Statement for the proposed Hospital for Special Surgery Expansion. Comments were accepted at the hearing and until July 14, 2008.

The New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the proposed Hospital for Special Surgery Expansion on August 1, 2008.

View the FEIS for Hospital for Special Surgery Expansion.

On January 30, 2008, a public hearing was held for the proposed 125th Street Corridor Rezoning and Related Actions. Comments were accepted at the hearing and for ten days following the hearing, until February 11, 2008.

The New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the proposed 125th Street Corridor Rezoning and Related Actions, on February 29, 2008.

View the FEIS for 125th Street Corridor Rezoning and Related Actions.

On December 5, 2007, a public hearing was held for the proposed First Avenue Properties Rezoning. Comments were accepted at the hearing and for ten days following the hearing, until December 17, 2007.

The New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Supplemental Environmental Impact Statement (FSEIS) for the proposed First Avenue Properties Rezoning, on January 18, 2008.

View the FEIS for First Avenue Properties.

On November 16, 2007, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the proposed Manhattanville in West Harlem Rezoning and Academic Mixed-Use Development.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on October 3, 2007. Written comments on the DEIS were requested and were received by the Lead Agency until the 10th calendar day following the close of the public hearing. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Manhattanville in West Harlem Rezoning and Academic Mixed-Use Development .

On June 29, 2007, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Jamaica Plan.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on May 23, 3007. Written comments on the DEIS were requested and were received by the Lead Agency until June 4, 2007. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

Please contact Robert Dobruskin, Director, Environmental Assessment and Review Division, New York City Department of City Planning at (212) 720 3423.

View the FEIS for The Jamaica Plan.

On December 29, 2006, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the proposed West 61st Street Rezoning and Citywide General Large-Scale Development Text Amendment.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on December 6, 2006. Written comments on the DEIS were requested and were received by the Lead Agency until the 10th calendar day following the close of the public hearing. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for West 61st Street Rezoning and Citywide General Large-Scale Development Text Amendment .

On June 30, 2006, the New York City Department of City Planning, on behalf of the City Planning Commission as lead agency, issued a Notice of Completion for a Final Environmental Impact Statement (FEIS) for the Silvercup West proposal.

A public hearing on the Draft Environmental Impact Statement (DEIS) was held on May 24, 2006. Written comments on the DEIS were requested and were received by the Lead Agency until the 10th calendar day following the close of the public hearing. The FEIS incorporates responses to the public comments received on the DEIS and additional analysis conducted subsequent to the completion of the DEIS.

View the FEIS for Silvercup West.