Built by DOB Analytics Dev Squad | This map shows filing cycle periods for Cycle 1. Sub-Cycle 1A includes MN CDs 1-7, Sub-Cycle 1B includes all other CDs in MN and BK, and Sub-Cycle 1C includes BX, QN, and SI. When zoomed in the location of parking structures and their inspection results can be viewed. Download Data (csv)

FILING CYCLES
Sub-Cycle 1A (01/01/2022 - 12/31/2023)
Sub-Cycle 1B (01/01/2024 - 12/31/2025)
Sub-Cycle 1C (01/01/2026 - 12/31/2027)
(Zoom in to view parking structure locations)

CYCLE 1


PARKING STRUCTURES FILING STATUS
(TOGGLE LAYERS ON & OFF)
SAFE
SREM
UNSAFE
STATUS PENDING
NO REPORT FILED
PIPS UNIVERSE:
CURRENT STATUS
PIPS UNIVERSE BY BOROUGH
SUB-CYCLES