| Estimated Bid Date |
Agency |
Trade(s) |
Project Description |
Project ID |
Budget Range ($000) |
| Jan - Mar 07 |
DCAS |
ADA COMPLIANCE |
100 CENTRE ST.- ADA COMPLIANCE |
CO283ADA |
500-1000 |
| Jan - Mar 07 |
DCAS |
ELECTRICAL |
1 CENTRE ST- FIRE ALARM |
PW193ALM |
2,500-5,000 |
| Jan - Mar 07 |
DCAS |
PLUMBING |
Man/Bx |
RECONS |
1,000 - 1,500 |
| Jan - Mar 07 |
DCAS |
PLUMBING |
Brooklyn, Queens and Staten island |
RECONS |
1,000 - 1,500 |
| Jan - Mar 07 |
DCAS |
ASBESTOS ABATEMENT |
Man above Duane St./Bx/Queens |
RECONS |
2,500 - 5,000 |
| Jan - Mar 07 |
DCAS |
ASBESTOS ABATEMENT |
Man below Duane St./Brooklyn/Staten Island |
RECONS |
2,500 - 5,000 |
| Jan - Mar 07 |
DDC |
Plumbing, HVAC, Elec, GC |
STATEN ISLAND ANIMAL SHELTER UPGRADES |
HL82SIPCA |
500-1000 |
| Jan - Mar 07 |
DDC |
Construction |
CITYWIDE BUS PADS |
HWBUSPAD2 |
1000-2500 |
| Jan - Mar 07 |
DDC |
Construction |
QUEENS BLVD MEDIAN EXTENSIONS INTO CROSSWALKS |
HWC988QB2 |
1000-2500 |
| Jan - Mar 07 |
DDC |
Construction |
SCHOOL SAFETY IMPROVEMENT, PHASE I |
HWCSCH1 |
5000-10000 |
| Jan - Mar 07 |
DDC |
Construction |
Reconstruction of 5 Av from 24 to 34 St/ SEK002358 |
HWK732C |
Over 10 mil |
| Jan - Mar 07 |
DDC |
Construction |
RECONSTRUCTION OF LIBERTY STREET, ETC (SEN002151) |
HWMWTCA6C |
Over 10 mil |
| Jan - Mar 07 |
DDC |
Construction |
HYLAN BOULEVARD INTERSECTION IMPROVEMENTS |
HWRC054 |
2500-5000 |
| Jan - Mar 07 |
DDC |
Construction |
PENNYFIELD AVE AREA RETAINING WALL |
HWX421AV |
500-1000 |
| Jan - Mar 07 |
DDC |
Construction |
STEP STREET - W. 176TH STREET AND W. 230TH STREET |
HWXS211V2 |
1000-2500 |
| Jan - Mar 07 |
DDC |
Plumbing, HVAC, Elec, GC |
Bridges Boiler Replacement |
JJ1BRBOIL |
1000-2500 |
| Jan - Mar 07 |
DDC |
Construction |
STATION ROAD/ SE776 |
SE-775 |
5000-10000 |
| Jan - Mar 07 |
DDC |
Construction |
Horace Harding Expy, 110TH ST., SEQ200328/200355 |
SEQ002513 |
5000-10000 |
| Jan - Mar 07 |
DEP |
Gen Const |
Replace Fire Alarm System at Coney Island WPCP |
CI-108-L |
5000-10000 |
| Jan - Mar 07 |
DEP |
Gen Const |
Replace Flare Tower at Coney Island WPCP |
CI-109-L |
1000-2500 |
| Jan - Mar 07 |
DEP |
Gen Const |
Job Order Contracting Region 2 (JOC-07-2G) |
JOC-DEP |
5000-10000 |
| Jan - Mar 07 |
DEP |
Gen Const |
Job Order Contracting Region 2 (JOC-07-2P) |
JOC-DEP |
2,500-5,000 |
| Jan - Mar 07 |
DEP |
Gen Const |
Job Order Contracting Region 3 (JOC-07-3G) |
JOC-DEP |
5000-10000 |
| Jan - Mar 07 |
DEP |
Gen Const |
Install Modular Building for CFS |
OB-116 |
2500-5000 |
| Jan - Mar 07 |
DEP |
Gen Const |
Chemical & Petroleum Bulk Storage Fac at Oakwood Beach |
OB-128-L |
5000-10000 |
| Jan - Mar 07 |
DEP |
Gen Const |
Reconstruct Handler System Boosters - Main Gates & Cone Check at Owls Head |
OH-64-L |
500-1000 |
| Jan - Mar 07 |
DEP |
Gen Const |
Reconstruct 16 Final Tanks Drives/Motors FST at Owls Head WPCP |
OH-79-L |
1000-2500 |
| Jan - Mar 07 |
DEP |
Gen Const |
Construct New Butler Building at Tallman Island WPCP |
TI-149-L |
1000-2500 |
| Jan - Mar 07 |
DOT |
Painting |
Paint Bruckner Expwy/Amtrak Bridges - 2 Br |
HB107003D |
5000-10000 |
| Jan - Mar 07 |
DOT |
Painting |
Paint Grand Central Pkwy / BQE. Br - 5 Br |
HB107003J |
5000-10000 |
| Jan - Mar 07 |
DOT |
Painting |
Paint Amtrak / Conrail Bridges - 4 Br |
HB10701D |
Below 500 |
| Jan - Mar 07 |
DOT |
Painting |
Paint Metro North Bridges - 9 Br |
HB107003B |
Below 500 |
| Jan - Mar 07 |
DPR |
Construction |
CANARSIE PARK - CONSTR OF A MUSIC PAVILION |
B018-106M |
Below 500 |
| Jan - Mar 07 |
DPR |
Construction |
MCCARREN PARK - CONSTR OF A SKATE PARK |
B058-106M |
500-1000 |
| Jan - Mar 07 |
DPR |
Construction |
DEAN PLGD - BALLFIELD & THE SEATING GARDEN |
B232-106M |
1000-2500 |
| Jan - Mar 07 |
DPR |
Construction |
ROBERT VENABLE PARK - PORTION OF (INCL PROPOSED NYS GRANT) |
B380-105M |
2500-5000 |
| Jan - Mar 07 |
DPR |
Construction |
ROBERT E. VENABLE PARK - CONSTR OF COMFORT STATION |
B380-106M/406M |
500-1000 |
| Jan - Mar 07 |
DPR |
Construction |
HENDRICK LOTT HOUSE - LANDSCAPE WORK |
B433-106M |
Below 500 |
| Jan - Mar 07 |
DPR |
Construction |
THE ARSENAL - DRAINAGE SYSTEM |
M010-506M |
Below 500 |
| Jan - Mar 07 |
DPR |
Construction |
RAOUL WALLENBERG PLGD - COMFORT STATION (M037) |
M037-107M/407M |
1000-2500 |
| Jan - Mar 07 |
DPR |
Construction |
MORNINGSIDE PARK - 123RD ST PLGD |
M056-106M |
500-1000 |
| Jan - Mar 07 |
DPR |
Construction |
CARL SCHURZ PARK - COMFORT STATION |
M081-107M/407M |
1000-2500 |
| Jan - Mar 07 |
DPR |
Construction |
DEVOY PLGD - INSTALLATION OF ENTRY GATE & PLAY EQUIPMENT |
Q015-306M |
Below 500 |
| Jan - Mar 07 |
DPR |
Construction |
GRAND CENTRAL PARKWAY - LANDSCAPE |
Q084-106M |
Below 500 |
| Jan - Mar 07 |
DPR |
Construction |
ROY WILKINS PARK - BLACK SPECTRUM THEATER ENTRANCE |
Q448-106M |
Below 500 |
| Jan - Mar 07 |
DPR |
Construction |
MULLALY PARK - CONSTR OF SYNTH TURF & MISC LANDSCAPE |
X034-107M |
1000-2500 |
| Jan - Mar 07 |
DPR |
Construction |
POE PARK VISITORS CENTER - CONSTRUCTION OF |
X040-204M/504M |
1000-2500 |
| Jan - Mar 07 |
DPR |
Construction |
ST. JAMES PARK - STONE WALLS, FENCES, PVMTS & SITE WORK |
X044-206M |
Below 500 |
| Jan - Mar 07 |
DPR |
Construction |
HALF NELSON PLGD |
X295-106M |
Below 500 |
| Jan - Mar 07 |
DSNY |
Electrical |
Emergency Lighting - Central Repair Shop, Queens |
S136-251B |
Below 500 |
| Jan - Mar 07 |
DSNY |
Construction |
Roof Replacement - Brooklyn 16 Garage |
S136-264 |
500-1000 |
| Jan - Mar 07 |
DSNY |
Construction |
Rehabiltation - Queens 13 Salt Enclosure |
S195-227Q |
500-1000 |
| Jan - Mar 07 |
DSNY |
Construction |
Rehabiltation - Thompkins Ave Salt Enclosure |
S195-227T |
1000-2500 |
| Jan - Mar 07 |
DSNY |
Construction |
Roof Replacement - Queens North Boro Shop |
S136-264 |
1000-2500 |
| Jan - Mar 07 |
DSNY |
Construction |
Construct Salt Enclosure, W. 55th St, Manhattan |
S195-227L |
2500-5000 |
| Apr - Jun 07 |
DCAS |
EXTERIOR |
111 Centre Street - Exterior |
CO284EXTR |
1000-2500 |
| Apr - Jun 07 |
DCAS |
REHABILITATION |
314 W. 54TH ST.- REHABILITATION |
CO305REHB |
Over 10 mil |
| Apr - Jun 07 |
DCAS |
EXTERIOR & ROOF |
390 KENT AVE.- EXTERIOR & ROOF |
PW77326EX |
2500-5000 |
| Apr - Jun 07 |
DCAS |
ADA COMPLIANCE |
31 CHAMBERS ST.- ADA COMPLIANCE |
CO81ADA |
1000-2500 |
| Apr - Jun 07 |
DCAS |
FIRE SAFETY |
100 CENTRE ST.- FIRE SAFETY |
CO283FIRE |
1000-2500 |
| Apr - Jun 07 |
DCAS |
FIRE SAFETY |
100 CENTRE ST.- FIRE SAFETY |
CO283FIRE |
1000-2500 |
| Apr - Jun 07 |
DCAS |
GC - ELECT |
60 CENTRE ST. - ADA COMPLIANCE |
CO304ADA |
500-1000 |
| Apr - Jun 07 |
DCAS |
ELECTRICAL |
Man/Bx |
RECONS |
5000-10000 |
| Apr - Jun 07 |
DCAS |
ELECTRICAL |
Brooklyn, Queens and Staten island |
RECONS |
5000-10000 |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
EXTERIOR UPGRADE AT HARLEM I MEN'S RESIDENCE |
HH112HMEU |
2500-5000 |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
BROWNSVILLE HEALTH CENTER BRICK REPAIR |
HL82BROBK |
500-1000 |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
STD CLINIC AT CENTRAL HARLEM HEALTH CENTER |
HL82CHSTD |
1000-2500 |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
HVAC&FIRE ALARM UPGRADE@MANHATTAN ANIMAL SHELTER |
HL82SPCAC |
2500-5000 |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
Exterior Upgrades at Auburn Residence |
HR115AUBX |
5000-10000 |
| Apr - Jun 07 |
DDC |
Construction |
RECONSTRUCTION OF EAST 78TH STREET AREA |
HWKP2028 |
2500-5000 |
| Apr - Jun 07 |
DDC |
Construction |
SOMERVILLE AREA (S/E CORNER) |
HWQ631B1 |
Over 10 mil |
| Apr - Jun 07 |
DDC |
Construction |
BRONX ZOOWAY STREETSCAPE PHASE II |
HWXD203 |
2500-5000 |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
PARK SLOPE LIBRARY REHABILITATION |
LBKA02PKS |
1000-2500 |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
PELHAM BAY LIBRARY - SITE IMPROVEMENTS |
LNC4PBSI |
2500-5000 |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
Seaside Library |
LQD122-SE |
1000-2500 |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
CSV-Clemente Soto Velez Facade Reconstruction |
PV467-CSV |
500-1000 |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
Weeksville Heritage Center |
PV520-WKS2 |
Over 10 mil |
| Apr - Jun 07 |
DDC |
Plumbing, HVAC, Elec, GC |
THE FOREST HILLS COMMUNITY HOUSE |
PWD99HILL |
500-1000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Reconstruct 4 Digester Heat Exchangers |
BB-202-L |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
DEWATERING SYSTEMS, SHAFT 15B EAST, ROOSEVELT ISLAND, MANH. |
C545G |
5000-10000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Reconstruction of Roof Gutters |
CAT-218 |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Grand Gorge Sewer Extension (Contract CAT-228) |
SEWR-EXT |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Replacement of underwater leaking valve at Rondout |
CAT-233 |
500-1000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Grand Gorge Sewer Extension (Contract CAT-327) |
SEWR-EXT |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
RECONST. CHEMICAL STORAGE TANKS @ THE CONEY ISLAND WPCP |
CI-101-L |
5000-10000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Replace Main Influent Gate Actuator at Coney Island WPCP |
CI-85-L |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
New Croton Aqueduct (Contract CRO-334E) |
CRO-NCA |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
New Croton Aqueduct (Contract CRO-334G) |
CRO-NCA |
Over 10000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Upgrade of Kensico Water Supply Lab (CRO-416E) |
CRO-416 |
Below 500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Upgrade of Kensico Water Supply Lab (CRO-416H) |
CRO-416 |
Below 500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Improvement to Flow Capacity Flushing Creek (CSO-FC) |
CSO-26 |
2500-5000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Margaretville Sewer System Hospital Connection (DEL-174A) |
DEL-174 |
Below 500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Replacement Elect Svcs at E. Delaware & Neversink Chambers (Contract DEL-68) |
DEL-68 |
500-1000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Baretto Point Environmental Remediation (HP-ER-1) |
HP-STAB |
5000-10000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Lead Paint Removal from DEP Facilities (LP-101) |
LEADPAINT |
5000-10000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Electrical Work for Moshulu Pumping Station (MOS-E) |
MOSHOLU |
2500-5000 |
| Apr - Jun 07 |
DEP |
Gen Const |
General Cons at Moshulu Pumping Station (MOS-G) |
MOSHOLU |
Below 500 |
| Apr - Jun 07 |
DEP |
Gen Const |
HVAC work for Moshulu Pumping Station (MOS-H) |
MOSHOLU |
Below 500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Replace Thickener Pumps at North River WPCP |
NR-50-L |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Reconstruct MSP Cone Check Valves at North River WPCP |
NR-90-L |
500-1000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Reconstruct VFDs for RAS and WAS Pumps at North River WPCP |
NR-94-L |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Install Main Sewage Flow Metering System at Port Richmond WPCP (Contract PR-107) |
PR-107-L |
500-1000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Reconstruct Degritters Classifiers & Piping at Port Richmond WPCP |
PR-122-L |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Recons Rikers Island S. PS & FM Gen Cons (PS-132G) |
PS-132 |
Over 10 mil |
| Apr - Jun 07 |
DEP |
Gen Const |
Recons Rikers Island S. PS & FM Electrical (PS-132E) |
PS-132 |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Recons Rikers Island S. PS & FM HVAC (PS-132H) |
PS-132 |
Below 500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Recons Rikers Island S. PS & FM Plumbing (PS-132P) |
PS-132 |
Below 500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Reconstruct Main Sewage Pump Controls at Hannah St Pump Station |
PS-252 |
500-1000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Replace Three Cyclone Degritters, Classifiers & Controls |
R-143-L |
500-1000 |
| Apr - Jun 07 |
DEP |
Gen Const |
CCFISS Red Hook Prototype |
REG-24A-L |
1000-2500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Reconstruct Fire Alarm System at Red Hook WPCP |
RH-66-L |
2500-5000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Reconstruct Shaft 21 City Tunnel No.1 (Contract C-602E) |
SHAFT21 |
Below 500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Reconstruct Shaft 21 City Tunnel No.1 (Contract C-602G) |
SHAFT21 |
2500-5000 |
| Apr - Jun 07 |
DEP |
Gen Const |
Reconstruct Shaft 21 City Tunnel No.1 (Contract C-602H) |
SHAFT21 |
Below 500 |
| Apr - Jun 07 |
DEP |
Gen Const |
Construct New Butler Building at Wards Island WPCP |
WI-263-L |
1000-2500 |
| Apr - Jun 07 |
DOT |
Construction |
E.153 St./Metro North RR |
HBX199 |
Over 10 mil |
| Apr - Jun 07 |
DOT |
Construction |
Hill Drive/Prospect Park Lane |
HBK1206 |
Over 10 mil |
| Apr - Jun 07 |
DOT |
Construction |
Claremont Pkwy/ Metro North RR |
HBX1160 |
Below 500 |
| Apr - Jun 07 |
DPR |
Construction |
MC CARREN PARK - PORTION OF BATHHOUSE |
B058-306M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
Coney Island Bike II |
B169 |
2500-5000 |
| Apr - Jun 07 |
DPR |
Construction |
Irving Square II |
B049 |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
Nostrand Park |
TBD |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
Sunset Path |
B087 |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
Shore Road Baseball |
B082 |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
Friends Field Park |
B372 |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
Ocean Parkway |
B065 |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
Brevoort Playground |
B258 |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
Brownsville Field |
B270 |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
DE WITT CLINTON PARK - (3) BALLFIELDS |
M022-107M |
2500-5000 |
| Apr - Jun 07 |
DPR |
Construction |
FORT WASHINGTON PARK/NY CENTRAL RAILROAD BLDG - STABILIZATION/REMOVALS |
M028-106M/306M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
T.ROOSEVELT PARK - PORTION OF PERIMETER SIDEWALKS (M053) |
M053-107M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
ST. NICHOLAS PARK - PATHS & ADJACENT SITEWORK BETW W 134TH & W 138TH STREETS |
M077-107M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
UNION SQUARE PARK - TWO PLGDS - NORTH |
M089-103M |
2500-5000 |
| Apr - Jun 07 |
DPR |
Construction |
UNION SQUARE PARK - NORTHERN END |
M089-205M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
CONSTR OF RANDALL'S/WARDS ISLAND WIND, SOLAR & TIDAL PROJECT (M107) |
M107-107M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
BARUCH PLGD - CONSTR OF HANDBALL COURTS (M165A) |
M165A-107M |
Below 500 |
| Apr - Jun 07 |
DPR |
Construction |
PECK SLIP |
M167-106M |
2500-5000 |
| Apr - Jun 07 |
DPR |
Construction |
LT. JOSEPH PETROSINO PARK |
M170-101M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
COLONEL CHARLES YOUNG PLGD - BASKETBALL & HANDBALL COURTS & SITTING AREA |
M186-107M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
INWOOD HILLS (M042), FORT TRYON (M029) - PATHS |
MG-107M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
FORMER (60TH STREET) HELIPORT SITE - CONSTR OF A PARK |
MG-40950-107M |
Below 500 |
| Apr - Jun 07 |
DPR |
Construction |
RIVERSIDE PARK - SOLDIERS & SAILORS MONUMENT PLAZA (M071) |
TN-04M-07 |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
PARK AVENUE MALLS BEAUTIFICATION (72ND-78TH) (M060) |
TN-12M-07 |
Below 500 |
| Apr - Jun 07 |
DPR |
Construction |
LITTLE BAY PARK - CONSTR OF COMFORT STATION |
Q010-106M/406M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
HIGHLAND PARK - CONSTR OF SYNTH TURF & RECONSTR OF SPRAY SHOWER & SITEWORK |
Q020-106M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
WEEPING BEECH PARK - MASTER PLAN & THE CONSTR OF PEDESTRIAN LINK |
Q022-106M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
ROCKAWAY BEACH (68TH) - CONSTR OF A COMFORT STATION |
Q162-106M/406M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
KISSENA CORRIDOR PARK - CONSTR OF COMFORT STATION @ BALLFIELDS |
Q300-106M/406M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
3 SITES: ROY WILKINS-CONSTR OF BUBBLE; LOCUST GROVE CIVIC TRIANGLE; BEACH 20 BUS. DIST.PLAZA |
QG-406M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
Fort Totten - Demo & Passive Land. |
Q458-206M/306M |
2500-5000 |
| Apr - Jun 07 |
DPR |
Construction |
College Point Field |
Q476-106M |
2500-5000 |
| Apr - Jun 07 |
DPR |
Construction |
QCFM Master Plan & Ph. 1 |
Q453-106M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
Von Dohlen Plgd |
Q105-106M |
Below 500 |
| Apr - Jun 07 |
DPR |
Construction |
Utopia Playground |
Q294-106M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
Dubos Point |
Q459-106M |
Below 500 |
| Apr - Jun 07 |
DPR |
Construction |
Montebelliar Park |
TBD |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
CLOVE LAKES PARK - CONSTR OF COMFORT STATION |
R005-105M/405M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
CONFERENCE HOUSE PARK - CONST OF MUSEUM SPACE IN BIDDLE HOUSE, EXHIBITION SPACE IN VISITOR'S CTR |
R006-106M/406M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
TOMPKINSVILLE PARK |
R024-106M |
Below 500 |
| Apr - Jun 07 |
DPR |
Construction |
S.I. BOTANICAL GARDEN - CONSTR OF IRRIGATION SYSTEM |
R116-606M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
OWL HOLLOW FIELDS - CONSTR OF C.S. & RELATED SITEWORK |
RG-12450-106M/406M |
Over 10 mil |
| Apr - Jun 07 |
DPR |
Construction |
SIGNAGE & BILLBOARDS LOCATED IN FRESH KILLS PARK |
TN-12R-07 |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
EARLY TOUR ENTRY LOCATED IN SOUTH PARK, FRESH KILLS PARK |
TN-13R-07 |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
BRONX RIVER PARK - 211TH STREET & BRONX BLVD ENTRANCE |
X004-102M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
CASTLE HILL PARK - RECONSTR OF PIER |
X007-105M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
CROTONA PARK - BATHHOUSE - PORTION OF ENTRANCE & LOBBY |
X010-106M |
Below 500 |
| Apr - Jun 07 |
DPR |
Construction |
CROTONA PARK - CONSTR OF A MAINTENANCE BLDG |
X010-306M/606M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
MULLALY PARK - BASEKETBALL CTS, PLGD & MISC SITE WORK |
X034-106M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
BARTOW PELL MANSION IMPROVEMENTS |
X039-506M |
Below 500 |
| Apr - Jun 07 |
DPR |
Construction |
WILLIAMSBRIDGE OVAL PARK - TRACK |
X104-306M |
Over 10 mil |
| Apr - Jun 07 |
DPR |
Construction |
SEDGWICK PLAYGROUND |
X158-106M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
CAMPANARO PLAYGROUND & EMILE CAVANAUGH TRIANGLE |
X187-106M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
KINGSBRIDGE REC CENTER - RECONSTR OF & ADDITION TO |
X250-105M/405M |
500-1000 |
| Apr - Jun 07 |
DPR |
Construction |
GRANT AVE PARK - CONSTR OF RETAINING WALL & COURT AREA |
X271-106M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
BRONX RIVER TRAILWAY - WEST FARMS LINK |
X288-102M |
1000-2500 |
| Apr - Jun 07 |
DPR |
Construction |
FOUR SITES: SOUNDVIEW PK, TWO @ BX RIVER PK, VAN CORTLANDT PK - CONSTR OF SYNTHETIC & NATURAL TURF BALLFIELDS |
XG-506M |
5000-10000 |
| Apr - Jun 07 |
DSNY |
Electrical |
Fire Alarm System - Central Repair Shop, Queens |
S136-397 |
1000-2500 |
| Apr - Jun 07 |
DSNY |
Construction |
Conveyor & push wall, Queens 7 Salt Enclosure |
S195-227L |
500-1000 |
| Jul - Sept 07 |
DCAS |
ELECT, GC, MECH |
851 GRAND CON. - ELECT.UPGRADE |
CO293ELEC |
Over 10 mil |
| Jul - Sept 07 |
DCAS |
HVAC - ELECT |
CITY HALL - HVAC PH II |
PW77102V |
2500-5000 |
| Jul - Sept 07 |
DCAS |
EXTERIOR |
125-01 QUEENS BLVD. |
CO296EXTR |
1000-2500 |
| Jul - Sept 07 |
DCAS |
ROOFING |
All Boroughs |
RECONS |
2500-5000 |
| Jul - Sept 07 |
DCAS |
Environmental |
AIR TESTING & ENVIRONM |
RECONS |
500 - 1,000 |
| Jul - Sept 07 |
DCAS |
Environmental |
BULK SAMPLING & ENVIRO |
RECONS |
500 - 1,000 |
| Jul - Sept 07 |
DEP |
Gen Const |
Provide Utlity Power for Various Regulators Coll Fac North |
REG-24D-L |
2500-5000 |
| Jul - Sept 07 |
DEP |
Gen Const |
Main Buildig North Mods at Newtown Creek (NC-36G) |
NC-36 |
Over 10000 |
| Jul - Sept 07 |
DEP |
Gen Const |
Main Buildig North Mods at Newtown Creek (NC-36E) |
NC-36 |
Over 10000 |
| Jul - Sept 07 |
DEP |
Gen Const |
Main Buildig North Mods at Newtown Creek (NC-36H) |
NC-36 |
5000-10000 |
| Jul - Sept 07 |
DEP |
Gen Const |
Main Buildig North Mods at Newtown Creek (NC-36P) |
NC-36 |
2500-5000 |
| Jul - Sept 07 |
DEP |
Gen Const |
Reconstruction of Piping Systems Citywide |
PW-63-L |
5000-10000 |
| Jul - Sept 07 |
DEP |
Gen Const |
Reconstruct Primary Tanks & Scum Removal at Tallman Island WPCP |
TI-158-L |
1000-2500 |
| Jul - Sept 07 |
DEP |
Gen Const |
Improvements to Prim Sludge Sys @ WI (Contract WI-79AG) |
WI-EXP |
Over 10 mil |
| Jul - Sept 07 |
DEP |
Gen Const |
Improvements to Prim Sludge Sys @ WI (Contract WI-79AE) |
WI-EXP |
1000-2500 |
| Jul - Sept 07 |
DEP |
Gen Const |
Improvements to Prim Sludge Sys @ WI (Contract WI-79AH) |
WI-EXP |
Below 500 |
| Jul - Sept 07 |
DEP |
Gen Const |
Construction of Wards Island 5th Feeder (Contract WI-5F) |
WI-EXP |
Over 10 mil |
| Jul - Sept 07 |
DEP |
Gen Const |
Hendrix Creek Wetlands Restoration (CSO-HC) |
CSO-JA |
500-1,000 |
| Jul - Sept 07 |
DOT |
Construction |
Comp. Rehab. 99B |
HBCR99B |
Over 10 mil |
| Jul - Sept 07 |
DOT |
Construction |
Bruckner Exp/Westchester Creek |
HBX1131 |
Over 10 mil |
| Jul - Sept 07 |
DOT |
Construction |
E. 8th Street Access Ramp Re-Bid |
HBK668 |
Over 10 mil |
| Jul - Sept 07 |
DOT |
Construction |
BSHP/Paerdegat Basin |
HBK1024 |
Over 10 mil |
| Jul - Sept 07 |
DOT |
Construction |
BSHP/Fresh Creek |
HBK1072 |
Over 10 mil |
| Jul - Sept 07 |
DOT |
Construction |
BSHP Rockaway Pkwy |
HBK1091 |
Over 10 mil |
| Jul - Sept 07 |
DOT |
Construction |
Westchester Ave/ Hutchinson River |
HBX1086 |
Over 10 mil |
| Jul - Sept 07 |
DPR |
Construction |
MCGUIRE PARK - BALLFIELDS |
B166-106M |
500-1000 |
| Jul - Sept 07 |
DPR |
Construction |
TOMPKINS SQUARE PARK - PLGD & MISC WORK (M088) |
M088-107M |
500-1000 |
| Jul - Sept 07 |
DPR |
Construction |
WEST 69TH TRANSFER BRIDGE, WATER TAXI DOCK, ADAPT RE-USE |
M353-105M |
Below 500 |
| Jul - Sept 07 |
DPR |
Construction |
E RIVER WATERFRONT ACCESS PROJ FOR E RIVER PK CONNECTOR & VARIOUS PARK SLIPS/STREETS |
MG-206M |
2500-5000 |
| Jul - Sept 07 |
DPR |
Construction |
DEKOVATS PARK (M108L) |
TN-03M-07 |
1000-2500 |
| Jul - Sept 07 |
DPR |
Construction |
BATTERY PARK PLGD (M005) |
TN-08M-07 |
2500-5000 |
| Jul - Sept 07 |
DSNY |
Construction |
Stormwater System at Queens 8/10/12 Garage |
S136-332 |
1000-2500 |
| Jul - Sept 07 |
DSNY |
Construction |
Fuel Tank Installation - Queens 7 Annex Garage |
S231-299 |
Below 500 |
| Oct - Dec 07 |
DCAS |
HVAC - GC - ELECT |
209 JORALEMON ST.- STEAM STATION |
PW291STM |
5000-10000 |
| Oct - Dec 07 |
DCAS |
HVAC |
360 ADAMS ST. - BLR. WATER FEED |
CO278BOIL |
1000-2500 |
| Oct - Dec 07 |
DCAS |
ELECTRICAL |
45 MONROE PL. - ELECT UPGRADE |
CO272ELEC |
1000-2500 |
| Oct - Dec 07 |
DCAS |
HVAC - GC - ELECT |
209 JORALEMON ST.- STEAM STATION |
PW291STM |
5000-10000 |
| Oct - Dec 07 |
DCAS |
HVAC |
360 ADAMS ST. - BLR. WATER FEED |
CO278BOIL |
1000-2500 |
| Oct - Dec 07 |
DCAS |
ELECTRICAL |
45 MONROE PL. - ELECT UPGRADE |
CO272ELEC |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruct Two Secondary Screens @26W |
26W-136-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruct Primary Climber Screens @26W |
26W-137-L |
2500-5000 |
| Oct - Dec 07 |
DEP |
Gen Const |
ASBESTOS REMOVAL AT DEP FACILITIES |
ASBESTOS |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
C544B,C,S,E,H,P SHFTS 19B-22B & JEROME PS C544X |
C544 |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
ACTIVATION OF BKLYN/QNS PORTION OF CITY TUNNEL NO. 3 |
C545D |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
RESURFACING SCHOHARIE ROADS WEST AND BEARKILL BRIDGE |
CAT-186 |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
SchoharieReservior/Gilboa Dam and Intake Outlet Chamber |
CAT-212 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
RECONSTRUCTION OF A PORTION OF ROUTE 28A |
CAT-244 |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruction of Ashokan Spillway Apron |
CAT-318 |
2500-5000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Catskill Siphon Chamber Doors |
CAT-332 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
RECONSTRUCT RETAINING WALL, ASHOKAN LOWER GATE CHAMBER |
CAT-333 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Security Gate at Ashokan |
CAT-334 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Lightning Protection at Coney Island WPCP |
CI-107-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
INSTALLATION OF FLARE TOWER AT THE CONEY ISLAND WPCP |
CI-109-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Final Tank Sluice Gate Modifications at Coney Island |
CI-111-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Gas Detection System in Primary Settling Tank |
CI-112-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
RECONSTRUCT CROTON FALLS DAM & DIVERTING DAM |
CRO-206 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruct New Croton Dam East of Hudson |
CRO-208 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
CROSS RIVER AND CROTON FALLS PUMPING STATIONS |
CRO-286 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
RECONSTRUCT ROADS, EAST-OF-HUDSON DISTRICT |
CRO-374 |
2500-5000 |
| Oct - Dec 07 |
DEP |
Gen Const |
CROTON LAKE GATE HOUSE WATERPROOFING & CRACK REPAIRS |
CRO-408 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Kensico Alum Dredging |
CRO-417 |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Restoration of the Belden House |
CRO-461 |
2500-5000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Replace Chlorine Solution Line at SH18 |
CRO-480 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Pleasantville Alum Plant Upgrade |
CRO-481 |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Scrubber System at Croton Lake Gatehouse |
CRO-482 |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
EOH Personnel Space |
CRO-488 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Flushing Bay Vortex Odor Control CS3-2 |
CSO-FB |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
FLUSHING TUNNEL REACTIVATION & GOWANUS CANAL FORCE MAIN |
CSO-GC |
Over 10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Del Repair: HYDRAULIC INV - RONDOUT-WEST BRANCH TUNNEL |
DEL-134 |
Over 10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Del Repair: ROV INSPECTION - RONDOUT-WEST BRANCH |
DEL-135 |
Over 10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Margaretville / Middletown Sewer Extension Project |
DEL-205 |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
ESS SHOP EAST AND WEST |
DEL-309 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
DELAWARE DAM RECONSTRUCTION, INTAKE/OUTTAKE CHAMBERS |
DEL-DAMS |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
RENOVATE BLDG FOR RELOCATION OF BWSO NITE-OPS UNIT |
EP06-MARV |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
CROTON FILTRATION PLANT |
HED-545 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Install (5) Sludge Feed Pumps in Dewatering Bldg. @ Jamaica |
J-168-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install (5) Polymer Feed System In Dewatering Bldg.@ Jamaica |
J-169-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
SOUTH BATTERY NC UPGRADING (NC-47G) |
NC-47 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
SOUTH BATTERY NC UPGRADING (NC-47E) |
NC-47 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
SOUTH BATTERY NC UPGRADING (NC-47H) |
NC-47 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
SOUTH BATTERY NC UPGRADING (NC-47P) |
NC-47 |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruct Digester Mixing at North River WPCP |
NR-93-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Ventilation System at Engine Room |
NR-97-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Replace Scum Concentration System (PRP) at Oakwood Beach WPCP |
OB-111-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
CCT Skimming Removal at Oakwood Beach WPCP |
OB-115-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
AERATION SYSTEM UPGRADE AT OWLS HEAD WPCP |
OH-72-L |
2500-5000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Hydraulic Actuator System -Main Gates & Cone Check |
OH-82-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Pumps and MCC at Nautilus Court PS |
PS-207 |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Eltingville Controls PRP |
PS-222 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
INSTALL ID SCREENS ON THICKENER DIST. BOX @ ROCKAWAY WPCP |
R-131-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Recons 7 MSP Cone Check Valve Actiator |
R-147-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Five New Tide Gates |
REG-25-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
RECONST RESERVOIR BRIDGES, UPSTATE |
RESV-BRDG |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Replace 8 Rotary Lobe w/Progressive Cavity at Red Hook WPCP |
RH-46-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Replace Main Influent Screen Conveyors |
TI-163-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
INSTALL MONORAIL GREASE CRANE IN AERATION TANK INFLUENT CHNL |
WI-264-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Isolation HT Exchange & Piping System to Cake Bldg at 26th Ward WPCP |
26W-131-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Sludge Heaters & Recirculation Pumps at 26th Ward WPCP |
26W-132-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Construct Pre-Fab STW Crew Quarters at 26th Ward WPCP |
26W-134-l |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Forestry Services for Water Supply Land |
DEL-247 |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
East 38th Street Facility Upgrades |
EP06-38ST |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Brooklfield Avenue Land fill Remediation (LF-BAL-1G) |
LFR-BKFLD |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Central Screenings Facility NC Upgrade (NC-41G) |
NC-41 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Central Screenings Facility NC Upgrade (NC-41E) |
NC-41 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Central Screenings Facility NC Upgrade (NC-41H) |
NC-41 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Central Screenings Facility NC Upgrade (NC-41P) |
NC-41 |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruct Primary Sludge System at North River WPCP |
NR-76-L |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Chemical & Petroleum Bulk Storage Fac Upgrade at Wards Island WPCP |
WI-270-L |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruct Two Secondary Screens @26W |
26W-136-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruct Primary Climber Screens @26W |
26W-137-L |
2500-5000 |
| Oct - Dec 07 |
DEP |
Gen Const |
ASBESTOS REMOVAL AT DEP FACILITIES |
ASBESTOS |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
C544B,C,S,E,H,P SHFTS 19B-22B & JEROME PS C544X |
C544 |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
ACTIVATION OF BKLYN/QNS PORTION OF CITY TUNNEL NO. 3 |
C545D |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
RESURFACING SCHOHARIE ROADS WEST AND BEARKILL BRIDGE |
CAT-186 |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
SchoharieReservior/Gilboa Dam and Intake Outlet Chamber |
CAT-212 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
RECONSTRUCTION OF A PORTION OF ROUTE 28A |
CAT-244 |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruction of Ashokan Spillway Apron |
CAT-318 |
2500-5000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Catskill Siphon Chamber Doors |
CAT-332 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
RECONSTRUCT RETAINING WALL, ASHOKAN LOWER GATE CHAMBER |
CAT-333 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Security Gate at Ashokan |
CAT-334 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Lightning Protection at Coney Island WPCP |
CI-107-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
INSTALLATION OF FLARE TOWER AT THE CONEY ISLAND WPCP |
CI-109-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Final Tank Sluice Gate Modifications at Coney Island |
CI-111-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Gas Detection System in Primary Settling Tank |
CI-112-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
RECONSTRUCT CROTON FALLS DAM & DIVERTING DAM |
CRO-206 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruct New Croton Dam East of Hudson |
CRO-208 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
CROSS RIVER AND CROTON FALLS PUMPING STATIONS |
CRO-286 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
RECONSTRUCT ROADS, EAST-OF-HUDSON DISTRICT |
CRO-374 |
2500-5000 |
| Oct - Dec 07 |
DEP |
Gen Const |
CROTON LAKE GATE HOUSE WATERPROOFING & CRACK REPAIRS |
CRO-408 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Kensico Alum Dredging |
CRO-417 |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Restoration of the Belden House |
CRO-461 |
2500-5000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Replace Chlorine Solution Line at SH18 |
CRO-480 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Pleasantville Alum Plant Upgrade |
CRO-481 |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Scrubber System at Croton Lake Gatehouse |
CRO-482 |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
EOH Personnel Space |
CRO-488 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Flushing Bay Vortex Odor Control CS3-2 |
CSO-FB |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
FLUSHING TUNNEL REACTIVATION & GOWANUS CANAL FORCE MAIN |
CSO-GC |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Del Repair: HYDRAULIC INV - RONDOUT-WEST BRANCH TUNNEL |
DEL-134 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Del Repair: ROV INSPECTION - RONDOUT-WEST BRANCH |
DEL-135 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Margaretville / Middletown Sewer Extension Project |
DEL-205 |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
ESS SHOP EAST AND WEST |
DEL-309 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
DELAWARE DAM RECONSTRUCTION, INTAKE/OUTTAKE CHAMBERS |
DEL-DAMS |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
RENOVATE BLDG FOR RELOCATION OF BWSO NITE-OPS UNIT |
EP06-MARV |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
CROTON FILTRATION PLANT |
HED-545 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Install (5) Sludge Feed Pumps in Dewatering Bldg. @ Jamaica |
J-168-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install (5) Polymer Feed System In Dewatering Bldg.@ Jamaica |
J-169-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
SOUTH BATTERY NC UPGRADING (NC-47G) |
NC-47 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
SOUTH BATTERY NC UPGRADING (NC-47E) |
NC-47 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
SOUTH BATTERY NC UPGRADING (NC-47H) |
NC-47 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
SOUTH BATTERY NC UPGRADING (NC-47P) |
NC-47 |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruct Digester Mixing at North River WPCP |
NR-93-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Ventilation System at Engine Room |
NR-97-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Replace Scum Concentration System (PRP) at Oakwood Beach WPCP |
OB-111-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
CCT Skimming Removal at Oakwood Beach WPCP |
OB-115-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
AERATION SYSTEM UPGRADE AT OWLS HEAD WPCP |
OH-72-L |
2500-5000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Hydraulic Actuator System -Main Gates & Cone Check |
OH-82-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Pumps and MCC at Nautilus Court PS |
PS-207 |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Eltingville Controls PRP |
PS-222 |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
INSTALL ID SCREENS ON THICKENER DIST. BOX @ ROCKAWAY WPCP |
R-131-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Recons 7 MSP Cone Check Valve Actiator |
R-147-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Five New Tide Gates |
REG-25-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
RECONST RESERVOIR BRIDGES, UPSTATE |
RESV-BRDG |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Replace 8 Rotary Lobe w/Progressive Cavity at Red Hook WPCP |
RH-46-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Replace Main Influent Screen Conveyors |
TI-163-L |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
INSTALL MONORAIL GREASE CRANE IN AERATION TANK INFLUENT CHNL |
WI-264-L |
500-1000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Isolation HT Exchange & Piping System to Cake Bldg at 26th Ward WPCP |
26W-131-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Sludge Heaters & Recirculation Pumps at 26th Ward WPCP |
26W-132-L |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Construct Pre-Fab STW Crew Quarters at 26th Ward WPCP |
26W-134-l |
1000-2500 |
| Oct - Dec 07 |
DEP |
Gen Const |
Forestry Services for Water Supply Land |
DEL-247 |
Below 500 |
| Oct - Dec 07 |
DEP |
Gen Const |
East 38th Street Facility Upgrades |
EP06-38ST |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Brooklfield Avenue Land fill Remediation (LF-BAL-1G) |
LFR-BKFLD |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Central Screenings Facility NC Upgrade (NC-41G) |
NC-41 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Central Screenings Facility NC Upgrade (NC-41E) |
NC-41 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Central Screenings Facility NC Upgrade (NC-41H) |
NC-41 |
Over 10 mil |
| Oct - Dec 07 |
DEP |
Gen Const |
Central Screenings Facility NC Upgrade (NC-41P) |
NC-41 |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Reconstruct Primary Sludge System at North River WPCP |
NR-76-L |
5000-10000 |
| Oct - Dec 07 |
DEP |
Gen Const |
Install Chemical & Petroleum Bulk Storage Fac Upgrade at Wards Island WPCP |
WI-270-L |
5000-10000 |
| Oct - Dec 07 |
DOT |
Construction |
E. 183rd Street Bridge/Metro North RR HAR |
HBX1139 |
5000-10000 |
| Oct - Dec 07 |
DOT |
Construction |
Paint BQE Bridges - 12 Bridges |
HB107003C |
5000-10000 |
| Oct - Dec 07 |
DOT |
Construction |
Protection Against Marine Borers |
HBCBORERS |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
11th Ave Viaduct |
HBM1120 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
W. 33rd St West Ramp A |
HBM1184 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
W. 33rd St East - Ramp B |
HBMC037 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
W. 34th West - Ramp C |
HBM1185 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
W. 35th St East - Ramp D |
HBM1186 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
W. 36th St East - Ramp E |
HBM1187 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
E. 183rd Street Bridge/Metro North RR HAR |
HBX1139 |
5000-10000 |
| Oct - Dec 07 |
DOT |
Construction |
Paint BQE Bridges - 12 Bridges |
HB107003C |
5000-10000 |
| Oct - Dec 07 |
DOT |
Construction |
Protection Against Marine Borers |
HBCBORERS |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
11th Ave Viaduct |
HBM1120 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
W. 33rd St West Ramp A |
HBM1184 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
W. 33rd St East - Ramp B |
HBMC037 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
W. 34th West - Ramp C |
HBM1185 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
W. 35th St East - Ramp D |
HBM1186 |
Over 10 mil |
| Oct - Dec 07 |
DOT |
Construction |
W. 36th St East - Ramp E |
HBM1187 |
Over 10 mil |
| Oct - Dec 07 |
DPR |
Construction |
GREAT KILLS (CEDAR GROVE) PK - CONSTR OF BIKE PATH |
R016-204M |
1000-2500 |
| Oct - Dec 07 |
DPR |
Construction |
WOLFS POND PARK VETERANS WAY MEMORIAL |
TBD |
Below 500 |
| Oct - Dec 07 |
DPR |
Construction |
CHILDREN THEME PARK |
TBD |
2500-5000 |
| Oct - Dec 07 |
DPR |
Construction |
OCEAN BREEZE PARK BALLFIELDS |
TBD |
500-1000 |
| Oct - Dec 07 |
DPR |
Construction |
PUGSLEY CREEK PARK - CLASON POINT PARK |
X088-406M |
500-1000 |
| Oct - Dec 07 |
DPR |
Construction |
SOUNDVIEW PARK - BICYCLE/PEDESTRIAN WATERFRONT PATH ALONG BRONX RIVER |
X118-102M |
500-1000 |
| Oct - Dec 07 |
DPR |
Construction |
GREAT KILLS (CEDAR GROVE) PK - CONSTR OF BIKE PATH |
R016-204M |
1000-2500 |
| Oct - Dec 07 |
DPR |
Construction |
WOLFS POND PARK VETERANS WAY MEMORIAL |
TBD |
Below 500 |
| Oct - Dec 07 |
DPR |
Construction |
CHILDREN THEME PARK |
TBD |
2500-5000 |
| Oct - Dec 07 |
DPR |
Construction |
OCEAN BREEZE PARK BALLFIELDS |
TBD |
500-1000 |
| Oct - Dec 07 |
DPR |
Construction |
PUGSLEY CREEK PARK - CLASON POINT PARK |
X088-406M |
500-1000 |
| Oct - Dec 07 |
DPR |
Construction |
SOUNDVIEW PARK - BICYCLE/PEDESTRIAN WATERFRONT PATH ALONG BRONX RIVER |
X118-102M |
500-1000 |
| Jan - Mar 08 |
DCAS |
GC - ELECT - PL - HVAC |
QUEENS BORO HALL PH 5 - REHAB |
PW77417V |
5000-10000 |
| Jan - Mar 08 |
DCAS |
GC - ELECT - ELEVATOR |
QUEENS BORO HALL - ELEVATOR |
PW77417EV |
1000-2500 |
| Jan - Mar 08 |
DDC |
Construction |
PEDESTRIAN BRIDGES AT 51 AV / 216 ST / E 81 ST |
HBPED100Q |
5000-10000 |
| Jan - Mar 08 |
DDC |
Construction |
PEDESTRIAN BRIDGES AT BETHEL AV/TRACY AV/W 8TH ST |
HBPED200R |
5000-10000 |
| Jan - Mar 08 |
DDC |
Construction |
DESIGN OF SIX PED. BRIDGES AT 55TH AVE,ETC. |
HBPED300Q |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
EDGEMERE (PHASE C1) - (Including SEQ002562/200406) |
HD153C1 |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Construction |
GATEWAY ESTATE - PHASE C |
HD-161C |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
EXTERIOR RENOVATION AT RICHMOND HEALTH CENTER |
HL82RCMD2-E |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
EXTERIOR RENOVATION AT RIVERSIDE HEALTH CENTER |
HL82RVREX-E |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Construction |
Amboy Road and Arden Avenue (SER200215) |
HWC988M2 |
1000-2500 |
| Jan - Mar 08 |
DDC |
Construction |
RESURFACING STREETS WITH COBBLESTONES |
HWCBLSTN1 |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
METROPOLITAN AVE & UNIONPORT ROAD IN PARKCHESTER |
HWD105-01 |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
DOWNTOWN BROOKLYN REHABILITATION |
HWK1153 |
1000-2500 |
| Jan - Mar 08 |
DDC |
Construction |
BOYLAND PEDESTRIAN PLAZA, EASTERN PWY/SEK002336 |
HWKP170 |
1000-2500 |
| Jan - Mar 08 |
DDC |
Construction |
RECONSTRUCTION OF CHURCH AVENUE |
HWKP2026 |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
Cobblstne Reconst: Peck Slip (HWMWTCA7D/SEN002153) |
HWM1159 |
5000-10000 |
| Jan - Mar 08 |
DDC |
Construction |
RECONST OF ASTOR PL & COOPER SQ (MED595/SEN002163) |
HWMP116 |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Construction |
RECONSTRUCTION OF HARRISON STREET ETC. (SEN002159) |
HWMWTCA7A |
5000-10000 |
| Jan - Mar 08 |
DDC |
Construction |
RECONSTRUCTION OF COLLEGE POINT BLVD |
HWQ1675 |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Construction |
Edgewood Triangle Area - Rosedale, Queens |
HWQ724B1 |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Construction |
FOREST HILL RD. (W/SER002238/SER200153) STATEN IS. |
HWR986B |
5000-10000 |
| Jan - Mar 08 |
DDC |
Construction |
Ely Ave Area |
HWX709 |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
MACON BRANCH LIBRARY FACADE & WINDOWS |
LBKA07MAC |
500-1000 |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
STAPLETON BR. LIBRARY RENOVATION AND EXPANSION |
LNC2STAPL1 |
5000-10000 |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
SOUNDVIEW BRANCH RENOVATION |
LNDSVRENO |
2500-5000 |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
GLENDALE BRANCH LIBRARY ADA |
LQD122GL1 |
500-1000 |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
QUEENSBORO HILL RENOV. & FIRE ALARM |
LQD122-QH |
500-1000 |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
Queens Museum of Art; Building Expansion & Reno. |
PV291QMX2 |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
SIIAS INTERIOR RECONS OF BLDG'S A& B AT SHCC |
PV302-AB |
5000-10000 |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
MBCA-Install Elevator, Boilers, AC & Cellar Renova |
PV467-MIN |
1000-2500 |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
SICM ROOFS AND TENTS |
PV477-TNT |
1000-2500 |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
SHCC SITE PLAN & PH 1 CONS |
PV490SITE |
1000-2500 |
| Jan - Mar 08 |
DDC |
Construction |
Rckwy Bch Blvd, B90-B94 St, (SEQ002479/200341) |
QED983 |
5000-10000 |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
ANNEX TO RIDGEWOOD BUSHWICK YOUTH CENTER |
RBANNEX |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Construction |
RECONSTR. OF W181ST ST/RIVERSIDE DR RETAINING WALL |
RWM001 |
Over 10 mil |
| Jan - Mar 08 |
DDC |
Construction |
RECONSTRUCTION OF DECATUR AVENUE RETAINING WALL |
RWX002 |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
RECONSTRUCTION OF BAILEY PLACE RETAINING WALL |
RWX003 |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
CATCH BASINS, MANHATTAN |
SECB07N1 |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
CATCH BASINS, MANHATTAN |
SECB07N2 |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
CATCH BASINS, QUEENS |
SECB07Q2 |
1000-2500 |
| Jan - Mar 08 |
DDC |
Construction |
CATCH BASIN, BRONX |
SECB07X |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
CATCH BASINS, MANHATTAN |
SECBMTAN3 |
1000-2500 |
| Jan - Mar 08 |
DDC |
Construction |
COMBINED SEWER IN WATER STREET |
SEK002355 |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
SANITARY SEWER IN VARIOUS LOCATIONS |
SEQ002607 |
1000-2500 |
| Jan - Mar 08 |
DDC |
Construction |
SANITARY SEWERS IN 173 ST - LINDEN BLVD AND 116 AV |
SEQ002634 |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
QUEENS TRENCH RESTORATION #11 |
SEQ002666 |
2500-5000 |
| Jan - Mar 08 |
DDC |
Construction |
REPLACEMENT OF COMBINED SEWER IN 48TH AVENUE |
SEQ002667 |
1000-2500 |
| Jan - Mar 08 |
DDC |
Construction |
STORM SEWERS IN BEDELL ST |
SEQ200472 |
1000-2500 |
| Jan - Mar 08 |
DDC |
Construction |
SAN. SEWER IN RICHMOND TERRACE |
SER002229 |
1000-2500 |
| Jan - Mar 08 |
DDC |
Plumbing, HVAC, Elec, GC |
Jerome-Gun Hill Muni Parking Garage, Bronx |
TF18-2006 |
2500-5000 |
| Jan - Mar 08 |
DEP |
Gen Const |
Reconstruct six New Gas Compressors at 26th Ward WPCP |
26W-73-L |
1000-2500 |
| Jan - Mar 08 |
DEP |
Gen Const |
Hillview Chlorination Bldg Site Prep (Contract C529B) |
C529 |
5000-10000 |
| Jan - Mar 08 |
DEP |
Gen Const |
Dredging Shandaken Intake Tunnel (Contract CAT-224) |
CAT-224 |
2,500-5,000 |
| Jan - Mar 08 |
DOT |
Construction |
Bryant Ave/ Amtrak |
HBX1152 |
5000-10000 |
| Jan - Mar 08 |
DOT |
Construction |
Comp Rehab 00 |
HBCR00 |
5000-10000 |
| Jan - Mar 08 |
DOT |
Construction |
W. 38th St over Amtrak |
HBM1174 |
Over 10 mil |
| Jan - Mar 08 |
DOT |
Construction |
W. 39th St over Amtrak |
HBM1175 |
Over 10 mil |
| Jan - Mar 08 |
DOT |
Construction |
W. 42nd St over Amtrak |
HBM1179 |
Over 10 mil |
| Jan - Mar 08 |
DOT |
Construction |
W. 47th St over Amtrak |
HBMC033 |
Over 10 mil |
| Jan - Mar 08 |
DOT |
Construction |
W. 48th St over Amtrak |
HBM1178 |
Over 10 mil |