(Last updated 7/17/12) This page identifies the City's construction projects that agencies expect to bid out during the next 12 months. The projects are listed by agency within the calendar quarter the agency expects to release its bid. This construction project pipeline report is intended to be a resource to assist contractors in planning for future work. We will update this list on a bi-monthly basis. Vendors will find complete information about projects in this pipeline report when the agency puts the project out to bid. If you are on the City's Bidder Lists, you will be notified of projects as they are bid. You can also find out about projects as they are bid through the City Record On-Line or by subscribing to the hardcopy City Record. To learn more about the bidding agency or to contact the Agency Chief Contracting Officer, click the agency's name. The information in this construction project pipeline report is derived from public City budget documents. As the City budget is subject to change, so too is any and all information in this pipeline report. The appearance of a project in this pipeline report does not mean that the project will be bid within the estimated time period or at the estimated amount or that it will, in fact, be bid at any time. It is all subject to change. In addition, the City may let contracts and implement projects that are not listed in this report; the listing of a project in this report is not required for the City to proceed with the project.
The City does not warrant or make any representation, expressed or implied, or assume any legal liability for the quality, content, accuracy, completeness or usefulness of the information, links and other items contained in the construction project pipeline, on this server or any other server. Agency Information The projects listed below are to be let by the following agencies. Click the acronym for the contact information of the Agency Contacting Officer and a link to the agency's web page. | Agency | Acronym | | Department of Citywide Administrative Services | DCAS | | Department of Correction | DOC | | Department of Design & Construction | DDC | | Department of Environmental Protection | DEP | | Department of Homeless Services | DHS | | Department of Parks & Recreation | DPR | | Department of Sanitation | DSNY | | Department of Transportation | DOT | | Fire Department | FDNY | | Housing Preservation and Development | HPD | | Police Department | NYPD |
Project List The projects listed below are to be let by city agencies. In addition to this list, the following excel spreadsheet contains additional useful information about these projects, including where the work will take place, if a project is subject to Local Law 129: the City’s M/WBE Program, and which projects are to be included in the City’s “Damages for Delay” pilot program. View/download this file (in Excel format). | Estimated Bid Date | Agency | Trade(s) | Project Description | Engineer's Estimate (Amount in '000s) | Subject to a PLA? (Yes / No) | | Apr - Jun 12 | DCAS | GC | 31 Chambers Skylight reconstruction | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DCAS | GC | 80 Centre Street Roof Reconstruction | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | CONSTRUCTION OF NEW DIESEL STATION, HARPER ST. YD. | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | DESIGN AND CONSTRUCTION SERVICES FOR THEATER AND ANCILLARY PROGRAM SPACE FOR THE ALLIANCE OF RESIDENT THEATRES/NEW YORK (ART/NY) ON WEST 53RD STREET IN MANHATTAN. THIS PROJECT INCLUDES A PERCENT FOR ART COMPONENT | 10,000 - 25,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | FUEL TANK REPLACEMENT | 10,000 - 25,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | INITIAL CONSTRUCTION ON FACILITIES FOR THE MANHATTAN CLASS COMPANY (MCC) THEATER, LOCATED ON THE GROUND AND SECOND FLOORS IN THE ARCHSTONE CLINTON DEVELOPMENT ON 10TH AVENUE IN HELLS KITCHEN. THE SPACE WILL INCLUDE TWO THEATERS, DRESSING ROOMS, ADMINISTR | 10,000 - 25,000 | Yes | | Apr - Jun 12 | DDC | Construction | INSTALL TRUNK WATER MAIN, CONNECTING CITY TUNNEL #3 TO THE DISTRIBUTION SYSTEM: 9TH AND 10TH AVENUES FROM 29TH TO 31ST STREETS, AND THE INTERVENING BLOCKS OF 29TH, 30TH AND 31ST STREETS | 10,000 - 25,000 | No | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | S. I. ANIMAL SHELTER - EXPANSION & RENOVATION | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | SCULPTURE CENTER EXPANSION - PHASE 2-A | 500 - 1,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | SUNSET PARK BRANCH LIBRARY INTERIOR MODIFICATIONS | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DEP | Gen Const | 11 Del Bridges and Culverts | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DEP | Electrical | Croton Falls Pumping Station Electrical | 10,000 - 25,000 | Yes | | Apr - Jun 12 | DEP | HVAC | Croton Falls Pumping Station HVAC | 100 - 500 | Yes | | Apr - Jun 12 | DEP | Gen Const | Croton Falls Pumping Station Structures & Equipment | 25,000 - 50,000 | Yes | | Apr - Jun 12 | DEP | Gen Const | Delaware Rondout Aqueduct (BT-1)
| 100,000 + | Yes | | Apr - Jun 12 | DEP | Gen Const | New Croton Dam Gate House Number 2 | 25,000 - 50,000 | Yes | | Apr - Jun 12 | DOT | Construction Related Services | Furnish and Install Pedestrian Countdown Signal LED Lenses | 1,000 - 3,000 | No | | Apr - Jun 12 | DOT | Construction Related Services | Furnishing, Installation or Removal of Electrical Traffic Signal Equipment to Control Traffic, Citywide | 10,000 - 25,000 | No | | Apr - Jun 12 | DOT | Construction Related Services | Installation of Thermoplastic & Bus Lane Pavement Markings in the City of New York | 3,000 - 10,000 | No | | Apr - Jun 12 | DOT | Construction Related Services | Installation of Thermoplastic Markings on Newly Resurfaced Roadways | 3,000 - 10,000 | No | | Apr - Jun 12 | DOT | Construction Related Services | Installation of Thermoplastic Markings on Newly Resurfaced Streets | 3,000 - 10,000 | No | | Apr - Jun 12 | DOT | Construction Related Services | Removal of Electro-Mechanical Controllers, Installation of ASTC Controllers, other Electrical Equipment and the Furnishing & Installation of Amber LED Lenses | 3,000 - 10,000 | No | | Apr - Jun 12 | DOT | Construction | Replacement of BSHP Bridge over Gerritsen Inlet | 100,000 + | No | | Apr - Jun 12 | DOT | Construction, Electrical | Traffic Signal Mantenance Borough of Bronx | 10,000 - 25,000 | No | | Apr - Jun 12 | DOT | Construction, Electrical | Traffic Signal Mantenance Borough of Brooklyn | 10,000 - 25,000 | No | | Apr - Jun 12 | DOT | Construction, Electrical | Traffic Signal Mantenance Borough of Manhattan | 10,000 - 25,000 | No | | Apr - Jun 12 | DOT | Construction, Electrical | Traffic Signal Mantenance Borough of Queens | 10,000 - 25,000 | No | | Apr - Jun 12 | DOT | Construction, Electrical | Traffic Signal Mantenance Borough of Staten Island | 3,000 - 10,000 | No | | Jun - Aug 12 | DEP | Gen Const | Ben Nesin Lab Replacement and Reconstruction | 1,000 - 3,000 | Yes | | Jun - Aug 12 | DEP | Gen Const | Crane & Hoist Replacement - EOH | 1,000 - 3,000 | No | | Jun - Aug 12 | DEP | | Design and construction of repair of Kensico BMP Facilities | 100 - 500 | No | | Jun - Aug 12 | DEP | Gen Const | Inspect and Replace Under Water Valve at Rondout | 3,000 - 10,000 | Yes | | Jun - Aug 12 | DEP | Gen Const | Kensico Dam Road Closure Mitigation | 1,000 - 3,000 | Yes | | Jun - Aug 12 | DEP | Gen Const | Pleasantville Alum Plant Upgrade | 3,000 - 10,000 | Yes | | Jun - Aug 12 | DEP | Gen Const | Reconstruct Roads EOH | 3,000 - 10,000 | Yes | | Jun - Aug 12 | DEP | Gen Const | Reconstruction of theThrogs Neck Pumping Station | 25,000 - 50,000 | Yes | | Jun - Aug 12 | DEP | Gen Const | Shaft 4, Connection Del-Cat Aqueduct | 25,000 - 50,000 | Yes | | July - Aug 12 | DOT | Construction | City Island Road/Eastchester Bay (Bronx) | 100,000 + | No | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | AFRIKAN POETRY THEATRE RECONSTRUCTION PROJECT | 3,000 - 10,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | APPARATUS FLOOR REPLACEMENT AT EC60 | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | APPRATUS FLOORS REPLACEMENT AT EC292 | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Construction | CONSTRUCT A NEW PUBLIC PLAZA AND STREETSCAPE | 1,000 - 3,000 | No | | July - Sept 12 | DDC | Construction | EMERGENCY REPAIR AND RECONSTRUCTION OF EXISTING DETERIORATED VITREOUS CLAY PIPE SEWERS IN VARIOUS LOCATIONS, BOROUGH OF STATEN ISLAND | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | FACADE RESTORATION MULTIPLE SITES | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | FTH - FLUSHING TOWN HALL INTERIOR/EXTERIOR UPGARDE | 500 - 1,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | FTH - LINDEN PLACE PARKING LOT | 500 - 1,000 | Yes | | July - Sept 12 | DDC | Construction | HUGH GRANT CIRCLE - METROPOLITAN AV AND WESTCHESTE | 100 - 500 | No | | July - Sept 12 | DDC | Construction | IMPLEMENT PEDESTRIAN SAFETY AND TRAFFIC FLOW IMPROVEMENTS AT 12 INTERSECTIONS ALONG QUEENS BOULEVARD BETWEEN 32ND PLACE AND 65TH PLACE | 1,000 - 3,000 | No | | July - Sept 12 | DDC | Construction | INSTALL BULKHEADS AT THE END OF WEST 11TH, 12TH AND 13TH ROADS, AND PERFORM ROADWAY RECONSTRUCTION FROM THE NEW BULKHEADS BACK TO CROSS BAY BOULEVARD. THIS PROJECT INCLUDES INSTALLATION OF ONE-WAY STORM WATER DRAIN VALVES TO DECREASE THE FREQUENCY, SEVERITY AND DURATION OF FLOODING IN THIS LOW LYING AREA. | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS, AND TRUNK AND DISTRIBUTION WATER MAINS -- CONEY ISLAND AREA, BROOKLYN | 25,000 - 50,000 | No | | July - Sept 12 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS, WATER MAINS AND APPURTENANCES IN WARDS POINT AVENUE AND ADJACENT SECTIONS OF AMBOY ROAD, SATTERLEE STREET, TOTTENVILLE PLACE AND PERTH AMBOY PLACE | 1,000 - 3,000 | No | | July - Sept 12 | DDC | Construction | INSTALL TRUNK WATER MAIN ALONG 54TH STREET BETWEEN FLUSHING AND GRAND AVENUES | 10,000 - 25,000 | No | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | INTERIOR GUT RENOVATION | 25,000 - 50,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | IRISH REPERTORY THEATRE - PHASE I RENOVATIONS | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | ISAMU NOGUCHI MUSEUM - SCULPTURE GARDEN RENOVATION | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | MASPETH TOWN HALL - HVAC AND FIRE ALARM UPGRADE | 100 - 500 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | NONTRADITIONAL EMP FOR WOMEN - INTERIOR RENOVATION | 500 - 1,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | QBG - PATHWAYS, SYSTEM & SITE IMPROVEMENTS | 3,000 - 10,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | QUEENS BOTANICAL GARDEN - ENTRANCES PROJECT | 3,000 - 10,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | QUEENS THEATER IN THE PARK-ORIGINAL CIRCULAR LOBBY | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Construction | RECON OF VIT CLAY PIPE SEWERS | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | RECON OF VIT CLAY PIPE SEWERS | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | RECON OF VIT CLAY PIPE SEWERS | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | RECON OF VIT CLAY PIPE SEWERS, BX | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | RECONSTRUCT COLLAPSED OR OTHERWISE DEFECTIVE SANITARY, COMBINED, STORM SEWERS, FORCE MAINS, ETC., CITYWIDE | 10,000 - 25,000 | No | | July - Sept 12 | DDC | Construction | RECONSTRUCT PUBLIC PLAZA | 1,000 - 3,000 | No | | July - Sept 12 | DDC | Construction | RECONSTRUCTION OF ADJOINING SECTIONS OF EAST 177TH STREET, DEVOE AVENUE AND EAST TREMONT AVENUE, FROM BRONX PARK AVENUE TO BOSTON ROAD | 10,000 - 25,000 | No | | July - Sept 12 | DDC | Construction | RECONSTRUCTION OF GRAND CONCOURSE SERVICE ROADS BETWEEN EAST 166TH AND EAST 171ST STREETS. INCLUDES WIDENING OF MEDIAN, INSTALLATION OF BICYCLE LANES AND LANDSCAPING | 10,000 - 25,000 | No | | July - Sept 12 | DDC | Construction | RECONSTRUCTION OF ROBERTO CLEMENTE PLAZA AND RELATED ROADWAY WORK | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | REHABILITATE/REPLACE RETAINING WALL ALONG THE WEST SIDE OF CANNON PLACE NEAR WEST 238TH STREET IN THE BRONX | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | RELOCATION AND REPLACEMENT OF BROKEN WATER MAINS, ON AN EMERGENCY BASIS, CITYWIDE | 10,000 - 25,000 | No | | July - Sept 12 | DDC | Construction | REPLACE CATCH BASINS AND PEDESTRIAN RAMPS AT MULTIPLE LOCATIONS IN STATEN ISLAND | 1,000 - 3,000 | No | | July - Sept 12 | DDC | Construction | REPLACE STORM AND SANITARY SEWERS, INSTALL NEW EXTENSIONS: CUBA AVENUE AND VICINITY, STATEN ISLAND | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | REPLACE WINDOWS | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Construction | ROADWAY RECONSTRUCTION TO CREATE A PEDESTRIAN PLAZA ON THE WEST SIDE OF PARK AVENUE BETWEEN 41ST STREET AND 42ND STREET ADJACENT TO THE VIADUCT | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | SOUTH SHORE BABE RUTH LEAGUE | 500 - 1,000 | Yes | | July - Sept 12 | DDC | Construction | STREET RECONSTRUCTION, INCLUDING SEWER AND WATER MAIN WORK | 10,000 - 25,000 | No | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | WOODSTOCK BRANCH - INTERIOR RENOVATION & ADA | 3,000 - 10,000 | Yes | | July - Sept 12 | DEP | Gen Const | Cattskill Aqueduct Stop Logs | 3,000 - 10,000 | No | | July - Sept 12 | DEP | HVAC | HVAC System - DEL Shaft 18 Chlorine Tank Room | 500 - 1,000 | No | | July - Sept 12 | DEP | Gen Const | Paerdegat Basin Dredging | 25,000 - 50,000 | Yes | | July - Sept 12 | DEP | General, Electric, Plumbing | Reconstruction Of The HVAC System, Kensico Water Supply | 10,000 - 25,000 | No | | July - Sept 12 | DEP | Gen Const | Replace Doors, EOH, Phase 2 | 1,000 - 3,000 | Yes | | July - Sept 12 | DEP | Gen Const | Resurface Schoharie Roads W & Bearkill Bridge | 3,000 - 10,000 | Yes | | July - Sept 12 | DEP | Gen Const | WOD Lightning Protection | 1,000 - 3,000 | Yes | | July - Sept 12 | DOT | construction related services | Furnishing and Installing of LED Cobra Head Type Luminaires and Control to Replace 150 Watt Cobra Head Type Luminaires, Manhattan | | No | | July - Sept 12 | DOT | Construction | Reconstruction of Transfer Bridge Substructure at Whitehall Ferry Terminal | 1,000 - 3,000 | No | | July - Sept 12 | DOT | Construction | Small Ferry Boat drydocking, Inspection & related repairs to Small Ferry vessesl | 10,000 - 25,000 | Yes | | July - Sept 12 | DOT | Construction | Street Lighting < 10 Year Plan (Install, Remove or Relocate Electrical Equipment in Roads, Parks & Public Places) | 3,000 - 10,000 | No | | July - Sept 12 | DOT | Construction | Traffic Park & Highway Distribution (Ten Year Plan) | 3,000 - 10,000 | No | | July - Sept 12 | DOT | Construction | Traffic Signals (Ten Year Plan) | 10,000 - 25,000 | No | | July - Sept 12 | DPR | General Contract | (B214) LINDEN PK/JHS 166 - HANDBALL CT & PK ENTRANCE; (B274) BAYVIEW PLGD - BASEBALL FIELD | 500 - 1,000 | No | | July - Sept 12 | DPR | General Contract | AQUEDUCT WALK | 3,000 - 10,000 | No | | July - Sept 12 | DPR | HVAC | BRONX & MANHATTAN - PARTIAL RECONSTR OF HVAC SYS IN CONNECTION WITH RECONSTR OF REC CTRS & NATURE CTRS | 500 - 1,000 | No | | July - Sept 12 | DPR | General Contract | FMCP - OLMSTED CENTER | 10,000 - 25,000 | No | | July - Sept 12 | DPR | General Contract | FORT WASHINGTON PARK - CONSTR OF ADA PED. RAMP; RECONSTR OF PED. STEP RAMP & CITY-OWNED STAIRCASE. | 3,000 - 10,000 | Yes | | July - Sept 12 | DPR | General Contract | FREDERICK JOHNSON PARK - 8 TENNIS COURTS | 500 - 1,000 | No | | July - Sept 12 | DPR | General Contract | JARDIN DE LA FAMILIA - SIDEWALK & PERIMETER FENCE | 100 - 500 | No | | July - Sept 12 | DPR | General Contract | JUNIPER VALLEY PARK - CONSTR OF A BOCCE CT | 500 - 1,000 | Yes | | July - Sept 12 | DPR | General Contract | LEIF ERICSON PARK - CONSTR OF COMFORT STATION | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | LINCOLN TERRACE PARK - TENNIS COURTS | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | MOSHULU PKWY/WW1 MONUMENT - CONSTR OF A LIGHTING SYSTEM | 0 - 100 | No | | July - Sept 12 | DPR | General Contract | PLGD ADJACENT TO P.S. 55 (DOUBLE NICKEL PLGD) | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | PS 183 (BEACH CHANNEL) PLGD | 500 - 1,000 | No | | July - Sept 12 | DPR | General Contract | PS 304 PULASKI PLGD-MULTI-PURPOSE AREA & CTS; TILDEN PLGD-TENNIS CTS | 500 - 1,000 | Yes | | July - Sept 12 | DPR | General Contract | SOUNDVIEW PARK - CONSTR OF A COMFORT STATON | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | SOUNDVIEW PARK - DEMOLITION OF THE C.S. & RECONSTR OF PLGD & SPORTS COURTS. | 3,000 - 10,000 | No | | July - Sept 12 | DPR | General Contract | VCP - DEMOLITION OF GREENHOUSES #4 & #5, CONSTR OF NEW GREENHSE & RECONSTR OF HEAD HSE. | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | WYCKOFF HOUSE - ROOF | 100 - 500 | No | | July - Oct 12 | DCAS | Electrical | 10 Richmond Terrace Electrical Upgrade | 3,000 - 10,000 | Yes | | July - Oct 12 | DCAS | GC | 125-01 Queen Blvd (Qns Crim Court) | 1,000 - 3,000 | Yes | | July - Oct 12 | DCAS | GC | 360 Adams Street Façade Rehab. | 1,000 - 3,000 | Yes | | Aug - Sept 12 | HPD | Demolition | Demolition Services-Emergency and Non-Emergency Br | 1,000 - 3,000 | No | | Aug - Sept 12 | HPD | Demolition | Demolition Services-Emergency and Non-Emergency Br | 1,000 - 3,000 | No | | Aug - Sept 12 | HPD | Demolition | Demolition Services-Emergency and Non-Emergency Bx | 1,000 - 3,000 | No | | Aug - Sept 12 | HPD | Demolition | Demolition Services-Emergency and Non-Emergency Man | 1,000 - 3,000 | No | | Aug - Sept 12 | HPD | Demolition | Demolition Services-Emergency and Non-Emergency Q & SI | 1,000 - 3,000 | No | | Aug - Sept 12 | HPD | Lead Abatement | Lead Abatement in Privately Owned Buildings- Manhattan | 1,000 - 3,000 | No | | Aug - Sept 12 | HPD | Lead Abatement | Lead Abatement in Privately Owned Buildings- The Bronx | 1,000 - 3,000 | No | | Aug - Oct 12 | DEP | Gen Const | CA Erosion Restoration - Millwood and Lake Streets | 1,000 - 3,000 | Yes | | Aug - Oct 12 | DEP | | EOHNPS -Stormwater Remediation Projects | 3,000 - 10,000 | No | | Aug - Oct 12 | DEP | Gen Const | Reconst. Concrete Beams & Floors - Ashokan Garage | 1,000 - 3,000 | Yes | | Aug - Oct 12 | DEP | Gen Const | Reduce Total Residual Chlorine (TRC) at Coney Island WWTP | 3,000 - 10,000 | Yes | | Aug - Oct 12 | DEP | Gen Const | Reduce Total Residual Chlorine (TRC) at North River WWTP | 3,000 - 10,000 | Yes | | 9/1/2012 | DEP | Electrical | New Emergency Generator at Lefrak | 500 - 1,000 | NO | | 9/6/2012 | DSNY | Construction | Brooklyn 12 Annex Sound Attenuation Wall | 500 - 1,000 | Yes | | Sept - Oct 12 | HPD | Roofing | Installation of Roofs in Privately Owned Buildings Man/Bx | 1,000 - 3,000 | No | | Sept - Oct 12 | HPD | Roofing | Intallation of Roofs in Privately Owned Buildings Br & Q | 500 - 1,000 | No | | Sept - Oct 12 | HPD | Roofing | Intallation of Roofs in Privately Owned Buildings Br & SI | 500 - 1,000 | No | | Sept - Nov 12 | DEP | | Design and construction of open channel flow measuring devices at two BMP Facilities | 500 - 1,000 | No | | Sept - Nov 12 | DEP | Gen Const | Wetland Mitigation at KAP Site | 3,000 - 10,000 | Yes | | Sept - Dec 12 | DCAS | GC, Plumbing, HVAC, Elec | 1 Centre St., 8th Fl. Comptroller's Office Renovations | 5,000 - 7,000 | Yes | | Sept - Dec 12 | DCAS | GC, Plumbing, HVAC, Elec | 1 Centre St., Mezz. Elevator | 1,000 - 3,000 | Yes | | Sept - Dec 12 | DCAS | GC | 100 Centre Sidewalk and Steps Replacement | 3,000 - 10,000 | Yes | | Sept - Dec 12 | DCAS | HVAC | 100 Centre Street - Cooling Tower Replacement | 3,000 - 10,000 | Yes | | Sept - Dec 12 | DCAS | GC, Plumbing, HVAC, Elec | 125 Worth St., 6th Fl., Level 3 Renovation | 500 - 1,000 | Yes | | Sept - Dec 12 | DCAS | GC, Plumbing, HVAC, Elec | 125 Worth St.,10th Fl., Level 3 Renovation | 1,000 - 3,000 | Yes | | Sept - Dec 12 | DCAS | Electrical, GC and Plumbing | 137 Centre Street - Fire Alarm Safety Upgrade | 2,000 - 4,000 | Yes | | Sept - Dec 12 | DCAS | GC | 210 Joralemon Street - 12th Floor (NYPD) | 1,000 - 3,000 | Yes | | Sept - Dec 12 | DCAS | GC | 210 Joralemon Street - Driveway | | Yes | | Sept - Dec 12 | DCAS | HVAC | 253 Broadway Cooling Tower | 3,000 - 10,000 | Yes | | Sept - Dec 12 | DCAS | GC, Plumbing, Elec | 45 Monroe Street - Electrical Upgrade/Generator | 2,000 - 4,000 | Yes | | Sept - Dec 12 | DCAS | GC and Plumbing | 60 Centre Street - Bsmt Structural Stabilization | 1,000 - 3,000 | Yes | | Sept - Dec 12 | DCAS | GC, Plumbing, HVAC, Elec | 80 Centre St., 5th Fl. Man. Fam. Justice Center | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | BHT-BILLIE HOLIDAT THEATER RECONSTRUCTION | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DDC | Construction | CONSTRUCT A NEW PUBLIC PLAZA AND STREETSCAPE | 3,000 - 10,000 | No | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | DELANCEY AND ESSEX MUNICIPAL PARKING GARAGE | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DDC | Gen Const | DPR Clubhouse Teeboxes Parking Lot | 25,000 - 50,000 | Yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | EAST ELMHURST EXPANSION | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | ELEVATOR REPLACEMENT AT CENTRAL BRANCH LIBRARY | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | HARLEM SCHOOL OF THE ARTS-PHASE 2 BUILDING UPGRADE | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | MTC - RENOVATION OF FRIEDMAN THEATER | 500 - 1,000 | Yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | NYHOS - LIGHTING FOR OUTDOOR EXHIBITS | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DDC | Construction | PEDESTRIAN BRIDGES AT 51 AV / 216 ST / E 81 ST | 10,000 - 25,000 | Yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | PERFORM EXTERIOR RENOVATIONS | 100 - 500 | Yes | | Oct - Dec 12 | DDC | Construction | RECONSTRUCT CEMENT PIPE SEWERS, BOROUGH-WIDE | 3,000 - 10,000 | No | | Oct - Dec 12 | DDC | Construction | RECONSTRUCT ROADWAY; REPLACE WATER MAIN; REHABILITATE SEWERS: SECTIONS OF BROADWAY AND ADJOINING STREETS SOUTH OF FULTON | 25,000 - 50,000 | No | | Oct - Dec 12 | DDC | Construction | RECONSTRUCT THE STEP STREET AT WEST 215TH STREET BETWEEN BROADWAY AND PARK TERRACE EAST | 1,000 - 3,000 | No | | Oct - Dec 12 | DDC | Construction | RECONSTRUCTION OF UNION TURNPIKE RETAINING WALL | 3,000 - 10,000 | No | | Oct - Dec 12 | DDC | Construction | REHABILITATE CONCRETE RETAINING WALL ALONG WEST 155TH STREET FROM RIVERSIDE DRIVE TO BROADWAY | 3,000 - 10,000 | No | | Oct - Dec 12 | DDC | Construction | REHABILITATE STONE RETAINING WALL ALONG THE WEST SIDE OF RIVERSIDE DRIVE, NORTHBOUND, FROM WEST 177TH STREET TO WEST 178TH STREET | 3,000 - 10,000 | No | | Oct - Dec 12 | DDC | Construction | REHABILITATE/RECONSTRUCT THE STONE RETAINING WALL ALONG THE WEST SIDE OF RIVERSIDE DRIVE BETWEEN WEST 177TH AND WEST 178TH STREETS | 1,000 - 3,000 | No | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | RETROFIT/UPGRADE OF ASPHALT PLANT AT HAMILTON AVE. | 3,000 - 10,000 | yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | SHCC SITE PLAN & PH 1 CONS | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DDC | Construction | STREET RECONSTRUCTION AND RECONFIGURATION, INCLUDES THE EXPANSION OF COOPER PARK AND CREATION OF NEW PEDESTRIAN PLAZAS | 10,000 - 25,000 | No | | Oct - Dec 12 | DDC | Construction | STREET RECONSTRUCTION, 175TH STREET BETWEEN BROADWAY AND WADSWORTH AVENUE, TO CREATE A PEDESTRIAN PLAZA WITH AMENITIES INCLUDING TREES, PLANTINGS, LIGHTING AND BENCHES | 1,000 - 3,000 | No | | Oct - Dec 12 | DDC | Construction | TV INSPECTION AND CLEANING - CITYWIDE | 1,000 - 3,000 | No | | Oct - Dec 12 | DDC | Construction | WATER MAIN WORK AT MULTIPLE LOCATIONS: QUEENS COMMUNITY BOARD 6 | 10,000 - 25,000 | No | | Oct - Dec 12 | DEP | Electrical | DEL Shaft 18 - Elect. Upgrade | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DEP | Gen Const | Gilboa Dam - Lower Level Outlet | 100,000 + | Yes | | Oct - Dec 12 | DEP | Gen Constr | Reconstruction of Bulkhead and Fendering at the RH WPCP | 10,000 - 25,000 | Yes | | Oct - Dec 12 | DEP | Gen Const | Sewer Line Stream Crossings, W O H | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DPR | General Contract | (EL) LITTLE BAY PARK PKG LOT RECONSTR & CONSTR OF NEW C.S. | Unknown At This Time | No | | Oct - Dec 12 | DPR | Electrical | (ELECTRICAL) FERRY PT GOLF COURSE - CONSTR OF MAINT. BLDG, C.S. & RAIN SHELTER | 500 - 1,000 | No | | Oct - Dec 12 | DPR | HVAC | (HVAC) FERRY PT GOLF COURSE - CONSTR OF MAINT. BLDG, C.S. & RAIN SHELTER | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | AMENDOLA PLAZA | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | Aqueduct walk- construction of a comfort station | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | ASPHALT GREEN - MULTI-PURPOSE ATHLETIC FIELD, TRACK & BASKETBALL CT | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | ASTORIA PARK - ROOF @ THE BATHHOUSE | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | BATTERY PARK - COMFORT STATION | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | BATTERY PARK - CONSTR OF BATTERY BIKEWAY, TOWN GREEN, PERIMETER EDGE, SIGNAGE & SITE WORK | 10,000 - 25,000 | No | | Oct - Dec 12 | DPR | General Contract | BELDEN POINT | 0 - 100 | No | | Oct - Dec 12 | DPR | | BELDEN POINT - STREET END | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | BILL BROWN MEMORIAL PARK - PLAZA | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | BRONX PARK - INSTALLATION OF ANADROMOUS FISH PASSAGE & RECONSTR OF ABUTMENTS @ DAM LOCATED @ BX RIVER/182ND ST. | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | BRONX RIVER PARK - CONSTR OF MULTI-USE PATHS | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DPR | General Contract | CANARSIE PARK - CONSTR OF A MUSIC PAVILION | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | CASTLE HILL PARK - RECONSTR OF PIER | 500 - 1,000 | No | | Oct - Dec 12 | DPR | HVAC | CITYWIDE - HVAC SYSTEMS - RECONSTR OF C.S. & FACILITIES @ DPR LOCATIONS | Unknown At This Time | No | | Oct - Dec 12 | DPR | Plumbing | CITYWIDE - PLUMBING SYSTEMS - RECONSTR OF C.S. & FACILITIES @ DPR LOCATIONS | Unknown At This Time | Yes | | Oct - Dec 12 | DPR | General Contract | CLOVE LAKES PARK - CONSTR OF MULTI-USE GREENWAY TRAIL | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | COLONEL MARCUS PLGD - COMFORT STATION & ADJACENT SITTING AREA | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | CONCEPT PLAN FOR RECONSTR OF LUTHER GULICK PLGD (M065) | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | CONEY ISLAND - ENTRANCE @ BRIGHTON 15TH ST & BDWLK BETWEEN BRIGHTON 15TH ST & CONEY ISL AVE | 3,000 - 10,000 | No | | Oct - Dec 12 | DPR | General Contract | CONSTR OF AN ANNEX TO, & RECONSTR OF ALLEY POND ENV'TL CENTER | 3,000 - 10,000 | No | | Oct - Dec 12 | DPR | General Contract | CONSTR OF C.S. ADJACENT TO ST. JOHN'S REC CTR | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | CONSTR OF JOGGING TRAIL AROUND JEROME PARK RESERVOIR | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | CONSTR OF MELROSE COMMONS PK (HPD SITE #32) | 3,000 - 10,000 | No | | Oct - Dec 12 | DPR | General Contract | CONSTR OF RANDALL'S/WARDS ISLAND WIND, SOLAR & TIDAL PROJECT (M107) | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | CONSTR OF SIGNAGE ALONG ROUTE OF OLD CROTON AQUEDUCT | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | CRESCENT BEACH PARK - CONSTR OF SIDEWALKS, PATHS, GUARDRAIL & LANDSCAPE | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | CROTONA PARK - CONSTR OF A MAINTENANCE BLDG | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | CROTONA PARK - NATURE CENTER (BOAT HOUSE) | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | CROTONA PARK - TOWERS, BRDIGE, STAIRS & RETAINING WALL @ ENTRANCE TO BATHHOUSE | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | CROTONA TENNIS COURTS PH 3 | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | DIMATTINA PARK - DOG RUN | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | DISCONNECTION OF WATER, SEWER & GAS SERVICES @ CEDAR GROVE BEACH | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | DRY DOCK PLGD - P.E., SECURITY LIGHTING, & MISC SITE WORK | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | EARLY TOUR ENTRY LOCATED IN SOUTH PARK, FRESH KILLS PARK | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DPR | General Contract | FORMER HELIPORT - RECONSTR OF RAMP & CONSTR OF A ROOFTOP SITTING AREA & SEARAIL | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | FORT GREENE PARK - WILLOUGHBY AVE ENTRANCE, PARK PATHS, PERIMETER SIDEWALKS & MISC LANDSCAPE | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | FORT TOTTEN - STABILIZATION OF WILLETS FARMHOUSE (BLDG 211) | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | FORT TRYON PARK - PATH & STAIRS & MISC SITE WORK | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | FORT TRYON PARK - STAIRCASE #50 & MISC SITE WORK | 500 - 1,000 | Yes | | Oct - Dec 12 | DPR | General Contract | FRESH KILLS PARK - NORTH PARK (R017) | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | FT WASHINGTON PARK - PED BRIDGE OVER AMTRAK RAILROAD | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DPR | General Contract | FT. WASHINGTON PARK - CONSTR OF A BIKE & PEDESTRIAN PATH | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | GRAND AVE PLGD | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DPR | General Contract | GRANT AVE PARK - CONSTR OF NATURAL AMPHITHEATRE/SPRAY SHOWER, MULTIPURPOSE RECREATIONAL FIELD & MISC SITE WORK | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | GRAVESEND PARK - BASKETBALL & HANDBALL COURTS | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DPR | General Contract | GRAVESEND PARK - COMFORT STATION | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | HIGHLAND PARK - NATURAL TURF BALLFIELDS 1 & 2 | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | IDLEWILD PARK - CONSTR OF A NATURE CENTER | 3,000 - 10,000 | No | | Oct - Dec 12 | DPR | General Contract | LITTLE BAY PARK - CONSTR OF COMFORT STATION | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | LITTLE BAY PARK - CONSTR OF COMFORT STATION | 3,000 - 10,000 | No | | Oct - Dec 12 | DPR | General Contract | MIDLAND BEACH PARK - CONSTR OF 2 STEEL SHADE STRUCTURES | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | MURRAY PLGD - PARK ENTRANCE, SITTING AREA, PLAZA, PLANTINGS & PORTIONS OF DOG RUN | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | Electrical | PARTIAL RECONSTR OF ELECTRICAL SYSTEMS IN CONNECTION W/RECONSTR OF C.S. & FACILITIES, CITYWIDE | Unknown At This Time | No | | Oct - Dec 12 | DPR | General Contract | PECK SLIP | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | PELHAM BAY PARK: WATERFRONT DEVELOPMENT | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | PELHAM PARKWAY MALLS (X003) | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | POE PARK - CONSTR OF ADA RAMP & MISC SITE WORK | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | PROSPECT PARK - PORTIONS OF PICNIC HOUSE | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | PUGSLEY CREEK PARK - CONSTR OF A BASKETBALL CT | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DPR | General Contract | PUGSLEY CREEK PARK - CONSTR OF ENVIRONMENTAL PLAY AREA | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | QUEENS CNTY FARM MUSEUM - REMOVAL OF INVASIVE SPECIES, RESTORATION OF FARMLAND & MISC SITE WORK | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | RAMON APONTE PARK | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | RAOUL WALLENBERG PLGD - COMFORT STATION (M037) | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | RECONSTR OF A PLAZA ALONG AQUEDUCT WALK & CONSTR OF 4 NYC DOT PARCELS ON UNIVERSITY AVE | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | RECONSTR OF ROOFS AT: RUFUS KING MANOR (Q023) & LATIMER HOUSE (Q497) | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | RIVERSIDE PARK - FENCES, PAVEMENTS, STAIRCASES, RAMPS, WALLS & GENERAL SITE WORK | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | RIVERSIDE PARK - PEDESTRIAN RAMP @ WEST 72ND ST. BETW RIVERSIDE DR & HENRY HUDSON PKWY | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | SOUNDVIEW PARK - CONSTR OF A NATURAL AMPHITHEATER | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | SOUNDVIEW PARK -CONSTR OF PLGD & C.S. LOCATED @ END OF ROSEDALE AVE | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | STUYVESANT SQ PARK - PORTIONS OF FENCE & SDWLKS IN EAST SECTION | 3,000 - 10,000 | No | | Oct - Dec 12 | DPR | General Contract | THE ARSENAL - DRAINAGE SYSTEM | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | TRYGVE LIE PLAZA - SITTING AREA | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | VON KING CULTURAL ARTS CENTER - PHASE 3 | 500 - 1,000 | No | | Jan - Mar 13 | DDC | Plumbing, HVAC, Elec, GC | ASSESS RELATIVE MERITS OF PRESERVATION, RESTORATION, RECONSTRUCTION AND/OR REHABILITATION OF THIS THE OLDEST EXTANT HOUSE IN STATEN ISLAND IN ORDER TO PREPARE CONSTRUCTION DOCUMENTS FOR WORK WHICH WILL BEST MEET THE NEEDS OF CURRENT VISITORS AND STAFF AND OF FUTURE GENERATIONS | 500 - 1,000 | Yes | | Jan - Mar 13 | DDC | Plumbing, HVAC, Elec, GC | CENTRAL RENOVATIONS | 3,000 - 10,000 | Yes | | Jan - Mar 13 | DDC | Construction | CHESTER AVENUE, STATEN ISLAND (W/SE-761) | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Construction | CONSTRUCT TRANSITWAY ELEMENTS - MEDIAN ISLANDS AND NECKDOWNS - ALONG 34TH ST BETWEEN 5TH AVE. AND THE FDR DRIVE, TO ESTABLISH A SEPARATE RIGHT OF WAY FOR BUSES | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Construction | CONSTRUCTION OF SANITARY AND STORM SEWERS, WATER MAINS AND APPURTENANCES IN AREA SURROUNDED BY RENSSELAER, HUGUENOT, ROSEDALE AND BELFIELD AVENUES, AND POWELL STREET. PROJECT INCLUDES A BEST MANAGEMENT PRACTICE STORM SEWER OUTLET | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Construction | CONSTRUCTION OF THE PLAZA ALONG FORSYTH STREET FROM CANAL TO DIVISION STREET, TO INCLUDE THE CREATION OF A PLAZA ON THE UPPER LEVEL OF THE MANHATTAN BRIDGE | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | DESIGN AND IMPLEMENT ROADWAY AND SIDEWALK TREATMENTS TO ENHANCE PEDESTRIAN SAFETY | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | ENGINEERED RESURFACING OF SHORE ROAD FROM WEST DRIVE TO 36TH AVENUE IN DOUGLAS MANOR, DOUGLASTON, QUEENS | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Plumbing, HVAC, Elec, GC | GREATER RIDGEWOOD HISTORICAL SOCIETY - ROOF REPLAC | 500 - 1,000 | Yes | | Jan - Mar 13 | DDC | Construction | GREEN INFRASTRUCTURE IN HUTCHINSON RIVER AREA, PH1 | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | GREEN INFRASTRUCTURE IN NEWTOWN CREEK AREA | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Elec, GC | HUDSON PARK BRANCH - ACCESSIBILITY PROJECT | 1,000 - 3,000 | Yes | | Jan - Mar 13 | DDC | Construction | IMPLEMENTATION OF SCHOOL SAFETY IMPROVEMENTS AT FIVE LOCATIONS IN BROOKLYN. THE SCOPE INCLUDES NEW/UPGRADED CURBS AND SIDEWALKS, BUS PADS, PEDESTRIAN RAMPS, SPEED REDUCERS, STREET LIGHTS AND TRAFFIC SIGNALS, AND LANDSCAPING. | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | IMPLEMENTATION OF SCHOOL SAFETY IMPROVEMENTS AT SIX LOCATIONS IN QUEENS. THE SCOPE INCLUDES NEW/UPGRADED CURBS AND SIDEWALKS, BUS PADS, PEDESTRIAN RAMPS, SPEED REDUCERS, STREET LIGHTS AND TRAFFIC SIGNALS, AND LANDSCAPING. | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | IMPLEMENTATION OF SCHOOL-SAFETY IMPROVEMENTS AT FIVE LOCATIONS IN THE BRONX AND MANHATTAN. THE SCOPE INCLUDES NEW/UPGRADED CURBS AND SIDEWALKS, BUS PADS, PEDESTRIAN RAMPS, SPEED REDUCERS, STREET LIGHTS AND TRAFFIC SIGNALS, AND LANDSCAPING. | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | IMPLEMENTATION OF SCHOOL-SAFETY STREET IMPROVEMENTS IN THE BRONX, TO INCLUDE: STREET RESURFACING; CURB AND SIDEWALK WORK; BUS PADS; PEDESTRIAN RAMPS; UTILITY WORK; STREET LIGHTING AND TRAFFIC SIGNALS; LANDSCAPING--CIS 303; ST. ANGELEA MERICI SCHOOL; IMMAC | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | IMPLEMENTATION OF SCHOOL-SAFETY STREET IMPROVEMENTS TO INCLUDE: STREET RESURFACING; CURB AND SIDEWALK WORK; BUS PADS; PEDESTRIAN RAMPS; UTILITY WORK; STREET LIGHTING AND TRAFFIC SIGNALS; LANDSCAPING--PS299 IN BROOKLYN, AND IN STATEN ISLAND, ST. TERESA, SA | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | IMPLEMENTATION OF STREET IMPROVEMENT MEASURES NEAR SCHOOLS TO PROMOTE SAFETY. THE SCOPE INCLUDES WORK ON: CURBS AND SIDEWALKS; BUS PADS; PEDESTRIAN RAMPS; UTILITIES; SPEED REDUCERS; STREET LIGHTING; TRAFFIC SIGNALS; LANDSCAPING. SIX LOCATIONS IN BROOKLY | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL CATCH BASINS, 25 LOCATIONS IN QUEENS | 500 - 1,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL HIGH LEVEL STANDARD STORM SEWERS IN GOWANUS CANAL VICINITY TO INCLUDE SIX SEWER CHAMBERS AND AN OUTFALL | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL NEW 20" SUB-AQUEOUS WATER MAIN EXTENSION TO RANDALL'S ISLAND CONNECTING TO A 36" MAIN AT ST. ANN'S AVE AND BRUCKNER BOULEVARD IN THE BRONX | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL NEW 20" SUB-AQUEOUS WATER MAIN ON CITY ISLAND ROAD BETWEEN PARK ROAD AND CITY ISLAND AVENUE | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL SANITARY AND STORM SEWERS, AND WATER MAIN REPLACEMENT, ALONG VICTORY BOULEVARD AND ADJOINING STREETS IN THE TRAVIS AREA | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL STORM AND COMBINED SEWER EXTENSIONS AND REPLACE WATER MAIN: HOOK CREEK BOULEVARD, MERRICK ROAD AND BROOKVILLE BOULEVARD INCLUDING ADJACENT SECTIONS OF 241ST, 242ND, 243RD AND 244TH STREETS; 130TH, 132ND AND 133RD AVENUES; AND 128TH, 131ST AND 132N | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS IN HYLAN BOULEVARD BETWEEN RICHARD AVENUE AND BUTLER BOULEVARD, INCLUDING SECTIONS OF RICHARD AVENUE, BUTLER BOULEVARD AND ADJOINING STREETS | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS, AND WATER MAIN, SECTIONS OF 9TH, 10TH, AND POPPENHUSEN AVENUES, AND 115TH, 116TH AND 117TH STREETS, COLLEGE POINT | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS, AND WATER MAIN: WOODROW ROAD FROM BELFIELD AVENUE TO JEFFERSON AVENUE; BELFIELD FROM WOODROW TO CROWN AVENUE; HOLCOMB AVENUE FROM WOODROW TO CROWN; CANTON AVENUE FROM VESPA AVENUE TO CROWN; AND VESPA FROM CANTON TO HOLCOMB; PLUS CROWN FROM CARLTON BOULEVARD TO ROW PLACE; AND ROW PLACE FROM CROWN TO WOODROW | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS; REPLACE WATER MAINS, IN ROBINSON AVENUE AND VICINITY | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALL STORM SEWER IN WILLIAM AVENUE BETWEEN DITMARS STREET AND TIER STREET | 100 - 500 | No | | Jan - Mar 13 | DDC | Construction | INSTALL/REPLACE DISTRIBUTION WATER MAIN EXTENSIONS FOR NEW BUILDINGS | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | INSTALLATION OF TRUNK WATER MAINS AT VARIOUS LOCATIONS ALONG 59TH STREET TO CONNECT WATER TUNNEL SHAFT TO THE DISTRIBUTION SYSTEM | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Plumbing, HVAC, Elec, GC | JEFFERSON MARKET LIBRARY ADA ACCESS | 1,000 - 3,000 | Yes | | Jan - Mar 13 | DDC | Plumbing, HVAC, Elec, GC | LEONARD COVELLO | 100 - 500 | Yes | | Jan - Mar 13 | DDC | Plumbing, HVAC, Elec, GC | NEW HVAC SYSTEM AT ANNA M. KROSS CENTER K-DORMITORIES, RIKERS ISLAND | 3,000 - 10,000 | Yes | | Jan - Mar 13 | DDC | Plumbing, HVAC, Elec, GC | OEM CONEY ISLAND LAN UPGRADE | 1,000 - 3,000 | Yes | | Jan - Mar 13 | DDC | Plumbing, HVAC, Elec, GC | POPPENHUSE INSTITUTE- ELEVATOR & ADA BATHROOM | 1,000 - 3,000 | Yes | | Jan - Mar 13 | DDC | Plumbing, HVAC, Elec, GC | QUEENS WEST HUNTERS POINT COMMUNITY LIBRARY | 3,000 - 10,000 | Yes | | Jan - Mar 13 | DDC | Construction | REBUILD CATCH BASINS -- MANHATTAN COMMUNITY BOARD 6 | 500 - 1,000 | No | | Jan - Mar 13 | DDC | Construction | REBUILD EXISTING CATCH BASINS, QNS | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | REBUILD EXISTING CATCH BASINS, QNS | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | RECONFIGURATION OF WEST STREET FROM EAGLE TO QUAY STREET, INCLUDING A TWO-WAY, CLASS 1 SEPARATED BIKE PATH; PLANTED BUFFER, SPEED TABLES AND IMPROVED PAVEMENT MARKINGS AT INTERSECTIONS; PLUS UNDERGROUND RELOCATION EXISTING ABOVEGROUND UTILITIES | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | RECONSTRUCT AND EXPAND NEW LOTS TRIANGLE INCLUDING NEW LOTS AVENUE FROM ASHFORD STREET TO LIVONIA AVENUE, LIVONIA FROM ASHFORD TO NEW LOTS AND ASHFORD FROM LIVONIA TO NEW LOTS | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | RECONSTRUCT CATCH BASINS IN PROXIMITY TO MTA/LIRR FACILITIES IN MANHATTAN | 100 - 500 | No | | Jan - Mar 13 | DDC | Construction | RECONSTRUCT OR REHABILITATE PASSERELLE OVERPASS IN FLUSHING MEADOWS -- CORONA PARK | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | RECONSTRUCT PELHAM PARKWAY FROM THE BRONX RIVER PARKWAY TO THE HUTCHINSON RIVER PARKWAY, INCLUDING THE NORTH SERVICE ROAD FROM BRONX PARK EAST TO EASTCHESTER ROAD | 25,000 - 50,000 | No | | Jan - Mar 13 | DDC | Construction | RECONSTRUCT ROADWAY | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | RECONSTRUCT SIDEWALKS AND TRAFFIC NECKDOWNS ALONG CHURCH AVENUE IN BROOKLYN | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | REHABILITATE CLIFFORD PLACE STEP STREET
| 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | REHABILITATE CONCRETE RETAINING WALL ALONG EDGECOMBE AVENUE FROM WEST 165TH STREET TO WEST 168TH STREET | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | REHABILITATE RETAINING WALL AT MACOMB DAM BRIDGE APPROACH TO 161ST STREET-- INCLUDES STREET RECONSTRUCTION | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | REHABILITATE THE COMBINED SEWER IN PROVOST STREET BETWEEN GREENPOINT AVENUE AND HURON STREET, AND IN JEWEL STREET BETWEEN GREENPOINT AVENUE AND NORMAN STREET | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | REHABILITATE/REPLACE THE CONCRETE RETAINING WALL ALONG NORTHBOUND JEROME AVENUE BEYOND EAST 196TH STREET, INCLUDING REPLACEMENT OF EXISTING CURB AND SIDEWALK | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | REPLACE COMBINED SEWER AND PERFORM RELATED WATER MAIN WORK: CALAMUS AVENUE BETWEEN 74TH AND 69TH STREETS, AND VICINITY | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Construction | REPLACE DISTRIBUTION WATER MAIN IN LONG ISLAND CITY AND ASTORIA | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Construction | REPLACE SANITARY SEWER IN WINDSOR ROAD BETWEEN LITTLE CLOVE ROAD AND TODT HILL ROAD | 500 - 1,000 | No | | Jan - Mar 13 | DDC | Construction | REPLACE WATER MAIN: EAST 46TH AND 47TH STREETS BETWEEN MADISON AND LEXINGTON AVENUES | 500 - 1,000 | No | | Jan - Mar 13 | DDC | Construction | RETROFIT THE MULTI-LEVEL MASONRY RETAINING WALLS AND STAIRWAY ON EAST 168TH STREET BETWEEN TELLER AND CLAY AVENUES | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | ROAD IMPROVEMENT AT SOUTH AVENUE AND FOREST AVENUE | 500 - 1,000 | No | | Jan - Mar 13 | DDC | Construction | ROADWAY RECONSTRUCTION: WORTH STREET FROM HUDSON STREET TO PARK ROW, INCLUDING SIDEWALK, CURB, SEWER AND WATER MAIN WORK | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Construction | SAFE ROUTES TO TRANSIT X501.01 | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Plumbing, HVAC, Elec, GC | SCHOMBURG CENTER-MCKIM BUILDING UPGRADES | 3,000 - 10,000 | Yes | | Jan - Mar 13 | DDC | Construction | STORM SEWER IN SCARBORO AVENUE | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | STREET IMPROVEMENTS FOR INCREASED SAFETY IN SCHOOL ZONES -- TOTAL OF 12 LOCATIONS IN QUEENS, MANHATTAN AND BROOKLYN. THE WORK INCLUDES: CURBS AND SIDEWALKS; BUS PADS; PEDESTRIAN RAMPS; SPEED REDUCERS; STREET LIGHTS; TRAFFIC SIGNALS AND LANDSCAPING. | 3,000 - 10,000 | No | | Jan - Mar 13 | DDC | Construction | STREET IMPROVEMENTS TO INCREASE SAFETY IN SCHOOL ZONES AT A TOTAL OF 8 LOCATIONS IN THE BRONX AND STATEN ISLAND. THE SCOPE OF WORK INCLUDES: CURBS AND SIDEWALKS; BUS PADS; PEDESTRIAN RAMPS; INFRASTRUCTURE UTILITY WORK; SPEED REDUCERS; STREET LIGHTS AND | 3,000 - 10,000 | Yes | | Jan - Mar 13 | DDC | Construction | STREET RECONSTRUCTION, BOLLER AVENUE FROM CROMFORD AVENUE TO BOSTON ROAD | 1,000 - 3,000 | No | | Jan - Mar 13 | DDC | Construction | WATER MAIN REPLACEMENT AT NUMEROUS LOCATIONS IN QUEENS | 10,000 - 25,000 | No | | Jan - Mar 13 | DDC | Construction | WATERMAIN WORK IN VARIOUS LOCATIONS PROJ Q2008-14 | 1,000 - 3,000 | No | | Jan - Mar 13 | DEP | Gen Const | Flushing Bay CSO Flow Metering | 1,000 - 3,000 | Yes | | Jan - Mar 13 | DEP | Gen Const | Gilboa Dam - Shandanken Tunnel Intake Chamber | 25,000 - 50,000 | Yes | | Jan - Mar 13 | DOT | Construction | Belt Shore Parkway over Bay Ridge Avenue | 3,000 - 10,000 | Yes | | Jan - Mar 13 | DOT | Construction | Bryant Ave/Amtrak (Bronx) | 3,000 - 10,000 | Yes | | Jan - Mar 13 | DOT | Construction | BSHP/Mill Basin | 100,000 + | No | | Jan - Mar 13 | DOT | Construction | Comp Rehab of 10 Bridges, Bronx & Manhattan | 10,000 - 25,000 | No | | Jan - Mar 13 | DOT | Construction | New Escalators and Elevators @Ferry Trerminals | 3,000 - 10,000 | Yes | | Jan - Mar 13 | DPR | General Contract | BRONX PARK/BX RIVER GREENWAY - RECONSTR/CONSTR OF BIKE/PED PATH | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | General Contract | CONSTR OF A PORTION OF BRONX RIVER GREENWAY - BETW SOUNDVIEW PK @ LAFAYETTE AVE & BRUCKNER BLVD | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | General Contract | CONSTR OF NEW SPRINGVILLE GREENWAY BIKE PATH | 10,000 - 25,000 | No | | Jan - Mar 13 | DPR | General Contract | IDLEWILD PARK - CONSTR OF PKG LOT, TRAILS & MARINE ACESS STRUCTURES (SITE B) | 500 - 1,000 | No | | Jan - Mar 13 | DPR | General Contract | KELTCH MEMORIAL PARK | Unknown At This Time | No | | Jan - Mar 13 | DPR | General Contract | M.FIDLER/WYCKOFF HOUSE PARK - WYCKOFF-DURLING BARN (REASSEMBLY & RECONSTR) | 3,000 - 10,000 | No | | Jan - Mar 13 | DPR | General Contract | MARCUS GARVEY PARK - MT. MORRIS HISTORIC FIRE WATCHTOWER | 100 - 500 | No | | Jan - Mar 13 | DPR | General Contract | MARINER'S HARBOR PLGD - CONSTR OF SKATE PARK | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | General Contract | MARINERS MARSH - CONSTR OF BARRIER RAIL, PAVEMENTS, LANDSCAPE & MISC SITE WORK | 100 - 500 | No | | Jan - Mar 13 | DPR | General Contract | MERCHANTS HOUSE MUSEUM | 500 - 1,000 | Yes | | Jan - Mar 13 | DPR | General Contract | PAERDEGAT PARK - BB CTS, PERIMETER SIDEWALK, SECURITY LIGHTING, P.E. | 500 - 1,000 | No | | Jan - Mar 13 | DPR | General Contract | PELHAM BAY PARK DOG RUN | 0 - 100 | No | | Jan - Mar 13 | DPR | General Contract | RECONSTR OF DOG RUNS @ DYKER BEACH, DIMATTINA PLGD & OWL'S HEAD PARK | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | General Contract | RIVERSIDE PARK SOUTH - PHASE V | 3,000 - 10,000 | No | | Jan - Mar 13 | DPR | General Contract | RIVERSIDE PARK/79TH ST. BOAT BASIN - DOCK "A" | 500 - 1,000 | No | | Jan - Mar 13 | DPR | General Contract | ROCKAWAY BEACH (68TH) - CONSTR OF A COMFORT STATION | 1,000 - 3,000 | Control | | Jan - Mar 13 | DPR | General Contract | ROCKS & ROOTS PARK - CONSTR OF ADDN'L FENCING, PATHS, SEATING & MISC SITE AMENITIES | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | General Contract | ROY WILKINS REC CENTER - SOUTH BUNKER | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | Electrical | SOUNDVIEW PARK - CONSTR OF NEW ELECTRIC SERVICE & PARK LIGHTING FOR THE PERFORMANCE LAWN | 100 - 500 | No | | Jan - Mar 13 | DPR | General Contract | SOUTH BEACH - CONSTR OF THREE TENNIS COURTS | 100 - 500 | Yes | | Jan - Mar 13 | DPR | General Contract | SUNSET PARK - SPRAY SHOWER | 500 - 1,000 | No | | Jan - Mar 13 | DPR | General Contract | VAN NEST PARK - PLGD | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | General Contract | VCP- CONSTR OF PORTION OF PUTNAM RAIL TRAIL FROM CITY LINE TO VCP SOUTH | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | General Contract | VON KING CULTURAL ARTS CTR - THEATER, KITCHEN & AMPHITHEATER & CONSTR OF RECORDING STUDIO | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | General Contract | WESTERLEIGH PARK - CONSTR OF RAIN GARDEN & EROSION CONTROL | 500 - 1,000 | Yes | | Jan - Mar 13 | DPR | General Contract | WHITE PLGD | 1,000 - 3,000 | No | | 3/1/2013 | DEP | ALL | New Command Center (was Lefrak cafeteria) | 1,000 - 3,000 | NO | | Apr - Jun 13 | DCAS | GC | 27 Madison Avenue - Roof and Misc Spaces | 3,000 - 10,000 | Yes | | Apr - Jun 13 | DDC | Construction | BEDELL ST, 115 RD/ 116 AVE | 1,000 - 3,000 | No | | Apr - Jun 13 | DDC | Construction | IMPLEMENTATION OF SCHOOL-SAFETY STREET IMPROVEMENTS AT FOUR SCHOOLS IN MANHATTAN TO INCLUDE: STREET RESURFACING; CURB AND SIDEWALK WORK; BUS PADS; PEDESTRIAN RAMPS; UTILITY WORK; STREET LIGHTING AND TRAFFIC SIGNALS; LANDSCAPING | 3,000 - 10,000 | No | | Apr - Jun 13 | DDC | Construction | IMPLEMENTATION OF SCHOOL-SAFETY STREET IMPROVEMENTS IN QUEENS, TO INCLUDE: STREET RESURFACING; CURB AND SIDEWALK WORK; BUS PADS; PEDESTRIAN RAMPS; UTILITY WORK; STREET LIGHTING AND TRAFFIC SIGNALS; LANDSCAPING--PS 108; ST. STANISLAUS KOSTKA SCHOOL; ST. JO | 3,000 - 10,000 | No | | Apr - Jun 13 | DDC | Construction | IMPROV. OF BRADLEY AVE & WILLOWBROOK AVENUE INT. | 3,000 - 10,000 | No | | Apr - Jun 13 | DDC | Construction | INTERSECTION IMPROVEMENT VICTORY BLVD & CLOVE ROAD | 3,000 - 10,000 | No | | Apr - Jun 13 | DDC | Plumbing, HVAC, Elec, GC | NEW GRANDSTAND | 1,000 - 3,000 | Yes | | Apr - Jun 13 | DDC | Construction | RECONSTRUCTION OF GANSEVOORT AREA (MED610B) | 25,000 - 50,000 | No | | Apr - Jun 13 | DDC | Construction | RECONSTRUCTION OF MALBONE STREET/BED-795 | 1,000 - 3,000 | No | | Apr - Jun 13 | DDC | Construction | RESTORE HISTORIC BELGIAN BLOCK ROADWAYS IN DUMBO AND VINEGAR HILL, AND CONSTRUCT THE NEW PEARL STREET PLAZA | 10,000 - 25,000 | No | | Apr - Jun 13 | DDC | Construction | RETAINING WALL - PARK AV NB - E 33 ST TO E 34 ST | 500 - 1,000 | No | | Apr - Jun 13 | DDC | Construction | RETAINING WALL - PARK AV NB - E 39 ST TO E 40 ST | 500 - 1,000 | No | | Apr - Jun 13 | DDC | Construction | RETAINING WALL - PARK AV SB - E 33 ST TO E 34 ST | 500 - 1,000 | No | | Apr - Jun 13 | DDC | Construction | RETAINING WALL - PARK AV SB - E 39 ST TO E 40 ST | 500 - 1,000 | No | | Apr - Jun 13 | DDC | Plumbing, HVAC, Elec, GC | STATEN ISLAND ZOO- AQUARIUM RECONSTRUCTION | 1,000 - 3,000 | Yes | | Apr - Jun 13 | DDC | Construction | STREET RECONSTRUCTION IN AREA INCLUDED IN 135TH AVENUE AND LINDEN BOULEVARD SOUTH TO ALBERT ROAD AND NORTH CONDUIT AVENUE, AND BOUNDED BY CROSS BAY BOULEVARD TO THE WEST AND THE RAILROAD RIGHT-OF-WAY ALONG AQUEDUCT RACE TRACK TO THE EAST | 25,000 - 50,000 | No | | Apr - Jun 13 | DDC | Construction | VICTORY BLVD & MANOR ROAD INTERSECTION IMPROVEMENT | 3,000 - 10,000 | No | | Apr - Jun 13 | DDC | Construction | WADSWORTH TERRACE (FAIRVIEW TO W. 190TH STREET) | 3,000 - 10,000 | No | | Apr - Jun 13 | DDC | Plumbing, HVAC, Elec, GC | WEST FARMS BRANCH LIBRARY - EXT. & INT. DOORS | 100 - 500 | Yes | | Apr - Jun 13 | DDC | Construction | WIDEN ROADWAY AND PERFORM RELATED WORK: AMBOY ROAD BETWEEN RICHMOND AND ARMSTRONG AVENUES | 3,000 - 10,000 | No | | Apr - Jun 13 | DOT | Construction | Harlem River Drive | 100,000 + | No | | Apr - Jun 13 | DOT | Construction | Protective Coating of Various Bridges in the Bronx | 3,000 - 10,000 | Yes | | Apr - Jun 13 | DOT | Construction Related Services | Repair Electrical and Utility Systems FMF Piers | 3,000 - 10,000 | No | | Apr - Jun 13 | DOT | Construction | Replacement of Derrick #1 | 1,000 - 5,000 | No | | Apr - Jun 13 | DPR | General Contract | BILL BROWN MEMORIAL PARK - COMFORT STATION | Unknown At This Time | No | | Apr - Jun 13 | DPR | General Contract | CRISPUS ATTUCKS - HANDBALL & BASKETBALL COURTS | 1,000 - 3,000 | No | | Apr - Jun 13 | DPR | General Contract | ISHAM PARK - WATER SYSTEM & RELATED INFRASTRUCTURE | 1,000 - 3,000 | Yes | | Apr - Jun 13 | DPR | General Contract | NOONAN JR. PLGD - SPRAY SHOWER & PLGD AREA | Unknown At This Time | No | | Apr - Jun 13 | DPR | Plumbing | PELHAM FRITZ BOILER | 100 - 500 | No | | Apr - Jun 13 | DPR | General Contract | PS 127 (EAST ELMHURST) PLGD - PORTION OF | 500 - 1,000 | No | | Apr - Jun 13 | DPR | General Contract | RELOCATION OF STATUE OF DE PEYSTER | 1,000 - 3,000 | No | | July - Sept 13 | DDC | Plumbing, HVAC, Elec, GC | 59-61 - ARC ON FOURTH PHASE 3 FACADE & WINDOWS | 1,000 - 3,000 | Yes | | July - Sept 13 | DDC | Plumbing, HVAC, Elec, GC | ART LAB AT SHCC, RECONSTR. OF RESTROOMS, BUILDING | 100 - 500 | Yes | | July - Sept 13 | DDC | Plumbing, HVAC, Elec, GC | BXMA - BRONX MUSEUM HVAC BMS SYSTEM | 100 - 500 | Yes | | July - Sept 13 | DDC | Plumbing, HVAC, Elec, GC | CENTRAL - YOUTH SERVICES LIBRARY | 1,000 - 3,000 | Yes | | July - Sept 13 | DDC | Plumbing, HVAC, Elec, GC | GLENDALE LIBRARY RENOVATIONS-PHASE II | 1,000 - 3,000 | Yes | | July - Sept 13 | DDC | Construction | INSTALL SANITARY AND STORM SEWERS, AND WATER MAIN: STREETS WITHIN THE WHITESTONE QUEENS AREA APPROXIMATELY DEFINED BY 20TH AVENUE TO THE NORTH, 29TH AVENUE TO THE SOUTH, AND 149TH STREET AND PARSONS BOULEVARD TO THE EAST AND WEST | 10,000 - 25,000 | No | | July - Sept 13 | DDC | Construction | INSTALL STORM SEWER EXTENSION AT ABBEY COURT BETWEEN LOIS AVENUE AND PLUMB BEACH CHANNEL, AND INSTALL CATCH BASINS AT VARIOUS LOCATIONS IN BROOKLYN | 500 - 1,000 | No | | July - Sept 13 | DDC | Plumbing, HVAC, Elec, GC | QBG - QUEENS BOTANICAL GARDEN: SIDEWALK RENOVATION | 500 - 1,000 | Yes | | July - Sept 13 | DDC | Plumbing, HVAC, Elec, GC | QCFM -QUEENS COUNTY FARM MUSEUM GREENHOUSE RESTORE | 1,000 - 3,000 | Yes | | July - Sept 13 | DDC | Construction | QUEENSBORO HALL MUNICIPAL PARKING GARAGE, QUEENS | 3,000 - 10,000 | No | | July - Sept 13 | DDC | Construction | RECONSTRUCTION OF W 33RD ST (SEN002165) | 10,000 - 25,000 | No | | July - Sept 13 | DDC | Plumbing, HVAC, Elec, GC | RPZ INSTALLATION & MODIFICATION, VARIOUS SITES | 100 - 500 | Yes | | July - Sept 13 | DDC | Construction | STORM SEWER EXTENSIONS AND RELATED WATER MAIN WORK IN 95TH STREET AND VICINITY | 1,000 - 3,000 | No | | July - Sept 13 | DDC | Construction | STORM SEWER EXTENSIONS, SANITARY SEWERS AND WATER MAIN REPLACEMENT IN FAR ROCKAWAY: SECTIONS OF BEACH 20TH, 21ST, 22ND, 23RD AND 25TH STREETS; NEW HAVEN, COLLIER AND BROOKHAVEN AVENUES; ELK DRIVE AND BRIAR PLACE | 3,000 - 10,000 | No | | July - Sept 13 | DEP | Gen Const | Rikers Island N. Pump Station | 3,000 - 10,000 | Yes | | July - Sept 13 | DPR | General Contract | ASTORIA PARK - ROOF ON CENTRAL PAVILION OF BATHHOUSE | 1,000 - 3,000 | Yes | | July - Sept 13 | DPR | General Contract | COFFEY PARK - RECONSTR OF THE PATHS | Unknown At This Time | No | | July - Sept 13 | DPR | General Contract | FORT TOTTEN - ADA ACCESSIBILITY & MISC SITE WORK ON 3 BLDGS | Unknown At This Time | No | | July - Sept 13 | DPR | General Contract | PIER 40 INDOOR SOCCER FIELD RETURF | 1,000 - 3,000 | No | | July - Sept 13 | DPR | General Contract | POWELL PARK - RECONSTR & EXPANSION OF HANDBALL & BASKETBALL CTS | Unknown At This Time | No | | July - Sept 13 | DPR | General Contract | RECONSTR OF A PLGD & SPRAY SHOWER IN EVERGREEN PARK | 100 - 500 | No | | July - Sept 13 | DPR | General Contract | RIVERSIDE PARK - SIDEWALKS & BUS STOPS | Unknown At This Time | No | | July - Sept 13 | DPR | General Contract | SUNSET PARK - PLAYGROUND | Unknown At This Time | No | | July - Sept 13 | DPR | General Contract | WARDS ISLAND - CONSTR OF HELL GATE PATHWAY | 100 - 500 | No | | Oct - Dec 13 | DDC | Plumbing, HVAC, Elec, GC | AUBURN BATHROOM UPGRADE | 500 - 1,000 | Yes | | Oct - Dec 13 | DDC | Plumbing, HVAC, Elec, GC | BRONX COUNCIL ON THE ARTS - FACILITY RENOVATION | 3,000 - 10,000 | Yes | | Oct - Dec 13 | DDC | Construction | COMPLEX PED RAMPS AT LAND MARK LOCATIONS, BK & MAN | 3,000 - 10,000 | No | | Oct - Dec 13 | DDC | Construction | CONSTRUCTION OF COMPLEX PED RAMPS(MTA), BK & MANS | 3,000 - 10,000 | No | | Oct - Dec 13 | DDC | Construction | RECONFIGURATION OF FLUSHING AVENUE FROM NAVY STREET TO WILLIAMSBURG STREET, TO INCLUDE: A TWO-WAY, CLASS 1 SEPARATED BIKE PATH; A SIX FOOT SIDEWALK EXTENSION; IMPROVED PAVEMENT MARKINGS AT ALL INTERSECTIONS | 3,000 - 10,000 | No | | Oct - Dec 13 | DDC | Construction | RECONSTRUCT NORTH FLATBUSH AVENUE FROM ATLANTIC AVENUE TO GRAND ARMY PLAZA, TO INCLUDE GREEN TRIANGLE STREETSCAPES WITH TRAFFIC NECKDOWNS AT INTERSECTIONS WITH CARLTON AVENUE AND PARK PLACE; 7TH AVENUE AND PARK PLACE; 6TH AVENUE AND ST. MARKS AVENUE; 8TH AVENUE AND ST. MARKS PLACE, PLUS ADDITIONAL NECKDOWNS AT BERGEN STREET; PROSPECT PLACE AND STERLING PLACE | 3,000 - 10,000 | No | | Oct - Dec 13 | DDC | Construction | RECONSTRUCTION OF TILLARY STREET AREA | 10,000 - 25,000 | No | | Oct - Dec 13 | DEP | Gen Const | New Gate House (CRO-521) | 3,000 - 10,000 | Yes | | Oct - Dec 13 | DPR | General Contract | DOME PARK - RECONSTR & EXPANSION OF THE PLAYGROUND | Unknown At This Time | No | | Oct - Dec 13 | DPR | General Contract | OCEAN HILL PLGD - RECONSTR OF THE PLGD | Unknown At This Time | No | | Oct - Dec 13 | DPR | General Contract | PORTIONS OF WEST SIDE OF THE OCEAN PARKWAY MALLS | Unknown At This Time | No | | Jan - Mar 14 | DEP | Electrical | 26Ward Preliminary Treatment & Residual Handling Bldg, Electrical | 10,000 - 25,000 | Yes | | Jan - Mar 14 | DEP | HVAC | 26Ward Preliminary Treatment & Residual Handling Bldg, HVAC | 3,000 - 10,000 | Yes | | Jan - Mar 14 | DEP | Plumbing | 26Ward Preliminary Treatment & Residual Handling Bldg, Plumbing | 1,000 - 3,000 | Yes | | Jan - Mar 14 | DEP | Gen Const | 26Ward Preliminary Treatment & Residual Handling Bldg, Structures & Equipment | 50,000 - 100,000 | Yes | | Jan - Mar 14 | DPR | General Contract | MORRIS JUMEL EXERIOR RENOVATION PHASE 2 | 1,000 - 3,000 | Yes | | Apr - Jun 14 | DPR | General Contract | ALLEY POND PARK - PATHS & DRAINAGE IN OAKLAND LAKE AREA | Unknown At This Time | No | | Apr - Jun 14 | DPR | General Contract | CALVERT VAUX PARK - CONSTR OF C.S. & MAINT. FACILITY | Unknown At This Time | No | | Apr - Jun 14 | DPR | General Contract | CEDAR PLGD - BASKETBALL COURTS | Unknown At This Time | No | | Apr - Jun 14 | DPR | General Contract | FATHER FAGAN PARK RECONSTRU & CHARLTON PLAZA WATER SUPPLY | Unknown At This Time | No | | Apr - Jun 14 | DPR | General Contract | GATEWAY ESTATES - CONSTR OF A COMFORT STATION | 1,000 - 3,000 | No | | July - Sept 14 | DPR | General Contract | EWEN PARK - BASKETBALL CTS & MISC SITE WORK | 500 - 1,000 | No | | July - Sept 14 | DPR | General Contract | PLAYGROUND 52 (KELLY PLGD) -RECONSTR | 1,000 - 3,000 | No | | Jan - Mar 15 | DEP | Gen Const | Clearview Pump Station | 3,000 - 10,000 | Yes | | Oct - Dec 14 | DPR | General Contract | RANDALL'S ISLAND - PORTION OF THE WESTERN SHORE | 1,000 - 3,000 | No | | Oct - Dec 15 | DEP | Gen Const | St. Albans Pump Station | 1,000 - 3,000 | Yes |
|  |