Entering the Wizard will cause you to lose your Incentives Estimator scenario. Would you like to return to the Incentives Estimator to save your scenario before you continue?
Entering the Incentives Estimator will cause you to lose your Wizard scenario. Would you like to return to the Wizard to save your scenario before you continue?
The New Construction Program's (NCP) can provide assistance to incorporate energy-efficiency measures into the design, construction, and operation of new and substantially renovated buildings to design teams and building owners. These measures are designed to save energy through reduced electric demand, and therefore reduce building operating costs. Incentives are also available for building commissioning services, green buildings, peak-load reduction, energy benchmarking, and advanced solar and daylighting systems.
Program highlights include technical assistance, funding, and assistance for commissioning services. Technical Assistance is available to help evaluate energy-efficiency measures and provide guidance to your design team on incorporating new and emerging energy-efficient technologies into your building. Funding is available to offset the additional costs associated with the purchase and installation of approved equipment. Assistance may also be available for commissioning services, advanced solar, daylighting technologies, and green building opportunities.
Eligibility The following two types of building projects are eligible for incentives under the program: • New Construction Project: a New Construction Project is one where a licensed professional architect or engineer has prepared and certified the building plans for a new building, or a portion within a new building; and/or • Substantial Renovation Project: A Substantial Renovation Project is one where a licensed professional architect or engineer has prepared and certified the building plans for: a change of use and reconstruction of an existing building or space within; construction requiring that the building or space within be out of service for at least 30 consecutive days (if only part of the building or space is out of service for at least 30 days, approval must be obtained through NYSERDA to be eligible); or reconstruction of a vacant structure or space within a building.
There is no limit to the size of the project that is eligible for the program, either in terms of energy usage or building square footage.
The deadline to apply for this program is September 30, 2009.
Businesses must be customers of Con Edison or National Grid and pay the New York State System Benefits Charge (SBC). To determine if electric bills include the SBC, look at a recent electric bill from the utility company to see if SBC is listed as a charge. If you do not see this line item, you may contact NYSERDA (see Contact Information below), which will assist you in determining whether you pay into the SBC.
Participation is limited to three projects per Applicant.
This page provides general information only. The information does not address all relevant regulatory requirements of City, State or Federal Agencies, nor does it address requirements with which the business must comply on an ongoing basis. It is the business owner's responsibility to meet all City, State and Federal requirements. Failure to comply with all applicable laws and regulations may result in fines or in the suspension and/or revocation of licenses or permits, or other penalties as allowed by law.
Please note that this information is not legal advice; you can only obtain legal advice from a lawyer. For more information or assistance, please contact the issuing Agency, using the contact information above, or call 311 (or 212-NEW-YORK if outside of New York City).
For security purposes, your session will time out in five minutes. If you need more time, click Continue. To exit and return to the homepage, click Logout.
Session Logged off
You have been logged off from your NYC Business Express session.
Scenario not saved!
You have not saved your scenario.
Press "OK" to continue to Log Out or choose "Cancel" to go back to page and save scenario.