We will increase replacement
rate to over 80 miles annually
Once it leaves our in-city tunnels, water travels through
6,700 miles of water mains to reach our homes, over
1,000 of which were installed over a century ago. These
aging pipes require constant repair and continual upgrades.
We are currently replacing 60 miles of water mains annually.
At our current pace of replacing 1% of our infrastructure
every year, a full upgrade will take a century to complete.
Over the next decade, we will accelerate the pace of
upgrades to over 80 miles annually. In addition, we
will spend approximately $575 million to link Stage
2 of Water Tunnel No. 3 with the water main distribution
system. Over 10 miles of new trunk water mains will
be installed in Manhattan for this purpose.
Progress (as of 4/22/08):
DEP launched a planning process to increase the rate
of water main construction and hopes to increase construction,
but that will be determined by funding. |