Stormwater BMP Installations

Thank you for participating in an inventory of innovative stormwater management tools, or Best Management Practices (BMPs), in New York City.  The information gathered will be used to help meet the water quality goals set forth in PlaNYC 2030. The more information that we can collect, the better informed we will be about BMPs that already exist in New York City. We intend to collect the information that you provide us on this form in a database. The information may be distributed through a Web site, an attachment to a stormwater plan, filings to regulatory agencies, and other means. We may use your first name, last initial, and borough of residence to indicate the source of comments received. We will use the street address as well as lot and block information for each BMP to track and monitor the distributed network of stormwater source controls. Please indicate your consent by checking one of the blanks below.

 I consent to the distribution of the information provided below to the public.
 I do not consent.

Please answer the following questions, providing as much detail as possible.

* indicates a required field.

  1. Where is the BMP located?*
    Street Address
    Lot / Block (if known)
    Borough
    Zip


  2. Contact information*
    Name
    Phone Number
    Email Address


  3. What is your relationship to this project?
    (Check all that apply)
    Property Owner
    Designer
    Funder
    Steward
    No relationship
    Other
    If other, please specify


    BMP Details

  4. Where does the water that enters this BMP originate?*
    (Check all that apply)
    Area of surface drained (approximately) (in square feet)
    Roof
    2 lane street
    4 lane street
    Wider street (>4 lanes)
    Sidewalk
    Driveway
    Lawn
    Open Space
    Other Surface (please specify)


  5. Once water gets into this BMP, where does it go next?*
    (Check all that apply)
    It infiltrates into the ground
    It evaporates into the air
    It drains into the sewer
    It is used in the building
    It is used in the garden
    Other
    If other, please describe


  6. How fast does the water drain?*
    If cubic feet per second known then just answer (a), if not known, then please answer (b) and (c)

    1. 0 - 0.5 cfs
      .5 - 1.0 cfs
      1 - 1.5 cfs
      1.5 - 2.0 cfs
      2.0 - 2.5 cfs
      > 2.5 cfs


    2. When it is not raining, how much water is stored in the BMP?
      none - it is empty
      there is water in the soil, but I can't see how much
      there is a free water surface and the average depth of the water is 0-3 inches
      there is a free water surface and the average depth of the water is 3-6 inches
      there is a free water surface and the average depth of the water is 6-12 inches
      there is a free water surface and the average depth of the water is more than 12 inches


    3. After an average rainfall event (~0.5 inches), how long does it take for the amount of water in the BMP to return to the condition you described in (b)?
      0 - 6 hours
      6 hours - 12 hours
      12 hours to 1 day
      more than 1 day
      impossible to say


  7. Where is water stored in this BMP?*
    (Check all that apply)
        Dimensions (of tank, pond, etc) if applicable
    In a tank (underground or otherwise)
    In a pond
    On top of vegetation / Open swale
    Underground (in soil, etc.)
    No storage  


  8. How much water can be stored?*
    (in inches)
    0 - 0.5
    0.5 - 1
    1 - 1.5
    1.5 - 2
    2 - 2.5
    2.5 - 3
    > 3.0


  9. What size rainstorm will cause the BMP to overflow and not work properly? (in inches)
    0 - 0.5
    0.5 - 1
    1 - 1.5
    1.5 - 2
    2 - 2.5
    2.5 - 3
    > 3.0


  10. Are there any other details about the function of this BMP that you can provide?


  11. Cost Information
    (Please provide dollar amounts if known)
    Design Costs
    Installation Cost - Labor
    Installation Cost - Materials
    Operational and Maintenance Costs (annual estimate)
    Year costs incurred


  12. Is there any additional cost information that you can provide?


    Installation

  13. Were there any site requirements for installation of this BMP?
    (Please describe all that apply)
    Dimensions
    Depth
    Depth to groundwater
    Depth to bedrock
    Soil type / Percolation Rate


  14. What kinds of professionals were involved in the design and construction of this BMP, and without whom the BMP could not have been installed?
    (Check all that apply)
    Architect
    Landscape Architect
    Civil / Environmental engineer
    Biologist / Ecologist
    Geotechnical Engineer
    Structural Engineer
    Land Surveyor
    Botanist / Horticulturalist
    General Construction Contractor
    Other
    If other, please specify


  15. Was special equipment required for the installation?
    Yes
    If yes, please describe
    No


  16. How long did construction/installation take?
    Less than 1 month
    1 to 6 months
    6-12 months
    More than 1 year
    Not yet complete


  17. Date installation completed:     

    Materials

  18. What materials were required for this BMP?
    (Please name specific brands or products used)


  19. Where did you purchase or order the necessary materials?


    Operating and Maintenance

  20. How often does the BMP need to be inspected?
    More than once a month
    Once every 1 to 6 months
    Once a year
    Less than once a year
    Never


  21. How often does the BMP require service or maintenance?
    More than once a month
    Once every 1 to 6 months
    Once a year
    Less than once a year
    Never


  22. Is special equipment needed for maintenance?
    Yes
    If yes, please describe
    No


  23. Number of people to perform maintenance?
    1
    2-3
    4-5
    > 5


  24. Hours per maintenance visit?
    Less than 1
    1-3
    4-5
    > 5


  25. Cost of maintenance (annual)?
    $0-$250
    $250-$500
    $500-$1,000
    $1,000-$2,000
    $2,000-$5,000
    $5,000-$10,000
    Over $10,000


  26. Who is responsible for maintenance (City, owner, etc.)?
    City
    Property Owner
    Other
    If other, please specify


  27. Is there a source of dedicated funds for operating and maintenance of this BMP?
    Yes
    No


    Monitoring

  28. Is this BMP currently monitored or was it ever monitored?*
    Yes
    No


  29. If yes, please check all parameters that are being or were monitored:*
    Volume detained
    Volume retained
    Drainage rate
    (to soil through percoloation)
    Drainage rate
    (through overflow device)
    Plant health
    Water quality (incoming)
    Water quality (outgoing)
    Rate of rainfall handled
    Ease of maintenance and operation
    Cost of maintenance and operation
    Other
    If other, please specify


  30. If yes, please indicate length of monitoring:*
    less than 3 months
    3 months to 1 year
    1 - 2 years
    2 - 3 years
    more than 3 years


  31. Is there any qualitative data available?*
    Yes
    No


    Challenges

  32. Were any of the following categories barriers in any way to designing or installing this BMP?
    (Check all that apply)
    NYC Sewer Code
    NYC Building Code
    Permitting
    Lack of knowledgeable designers, installers, suppliers or other workers
    Lack of general information on BMPs
    Lack of information about other NYC BMPs
    Funding (capital)
    Funding (operation and maintenance)
    Site constraints (area, soils, etc.)


  33. Have there been any problems with the operation or performance of this BMP?
    Yes
    If yes, please describe
    No


     
Copyright 2009 The City of New York Contact Us | FAQs | Privacy Statement | Site Map