LL86 mandates that the Mayor's office report
each year on the number and size of
projects subject to its provisions as well as on specific costs and benefits related to
the law's requirements. For the second report due September 1, 2009,
the Mayor's Office of Environmental Coordination (MOEC) has developed the
two reporting forms referenced below to fulfill this mandate. Agencies that control city expenditures
on LL86 projects must submit the appropriate form for each project
that has started design since the effective date of the law. This includes updating
and resubmitting of required information on each project reported in the previous year, unless
such a project has been completed and all required reporting information has been
previously submitted.
All completed forms must be submitted electronically to
LocalLaw86@cityhall.nyc.gov
prior to July 31, 2009.
Agencies should use either the 2009
REPORTING
FORM for Project Subject to the LEED® Rating and/or Water Use Reduction
Provisions of Local Law 86 of 2005 or the 2009
REPORTING
FORM for Project Subject to the System Specific Energy Cost and/or Water
Use Reduction Provisions of Local law 86 of 2005. The first form should
be used only for projects subject to the LL86 LEED® provisions, and the second
only for boiler, lighting, and HVAC comfort control installations subject to the
5-10% energy cost reduction
provisions as well as for projects subject to only the water use reduction
provisions.
The Design Phase portion of each reporting form must be
completed for covered projects that have started
design before the end of Fiscal Year 2009 (FY09), where the beginning of the
design phase is defined as the date the Mayor’s Office of Management
and Budget (OMB) approved
the Certificate to Proceed (CP) for Design or the CP for Design and
Construction.
The Construction Phase portion must also be completed
for covered projects that have also started construction before the end of FY09,
where the beginning of construction is defined as the date a Certificate to
Proceed (CP) for Construction is approved by the OMB or, in cases where
a CP for Construction is not required, when the first construction contract is
awarded.
Finally, for a project subject to a LEED® provision
where the required LEED® related submittals are completed and/or certification
by the USGBC is achieved before the end
of FY09, the Post-Construction portion of the reporting form must also be filled
out.