Search Email Updates Contact Us Residents Business Visitors Government Office of the Mayor NYC.gov always open

  Follow us on:
Facebook  Twitter
Range Hood Inspection Request

A licensed master fire suppression contractor can schedule a range hood inspection or re-inspection.

By law, commercial cooking equipment must have independent exhaust systems. Range hood systems must be inspected to make sure that they comply with the Fire Code and that gas or electric service is secured before cooking can begin.

Before you request an inspection, you must have:

  • Copies of an approved PW-1 application
  • DOB work permit application (PW-2)
  • DOB work permit
  • Installer's affidavit
  • FDNY-approved Plan
You will receive an e-mail confirmation with details pertaining to your inspection request within two (2) business days.

Date:
* indicates required field

Inspection Data

 
Description: *

 
Details (# systems): *
 
Manufacturer *

 
Tank Size (Gallons): *
 
FDP #: *
 

DOB Job #: *

Enter “# Unknown” if you do not have the DOB job number.

 
Schedule B Plumbing #: *

This is the Cooking Equipment Number. Enter “# Unknown” if you do not have the Schedule B Plumbing number.
 

Addit ional Details:

If applicable, indicate the following: License or C of F number; Number of floors or square footage to be inspected

 
Preferred Inspection Date: -Date Format: MM/DD/YYYY: *
Option 1
Invalid format.


Option 2
Invalid format.
 
   

Location Data

 
Borough: *

 
Building #: *
Street Name:*
Apartment #:
Business Owner First Name:*
Business Owner Last Name:*
Business Owner Phone #:*
Invalid format.
 
   

Scheduler Data

 
Scheduler First Name: *
Scheduler Last Name *
Scheduler Role: *
Scheduler Phone #: *
Invalid format.
Scheduler Email Address: *
Invalid format.
Please enter the letters you see in the graphic below (required):
(letters are not case-sensitive)
 
Listen to and enter into the text field the digits you hear

Get new image |  What is this?