(Last updated 11/15/11) This page identifies the City's construction projects that agencies expect to bid out during the next 12 months. The projects are listed by agency within the calendar quarter the agency expects to release its bid. This construction project pipeline report is intended to be a resource to assist contractors in planning for future work. We will update this list on a bi-monthly basis. Vendors will find complete information about projects in this pipeline report when the agency puts the project out to bid. If you are on the City's Bidder Lists, you will be notified of projects as they are bid. You can also find out about projects as they are bid through the City Record On-Line or by subscribing to the hardcopy City Record. To learn more about the bidding agency or to contact the Agency Chief Contracting Officer, click the agency's name. The information in this construction project pipeline report is derived from public City budget documents. As the City budget is subject to change, so too is any and all information in this pipeline report. The appearance of a project in this pipeline report does not mean that the project will be bid within the estimated time period or at the estimated amount or that it will, in fact, be bid at any time. It is all subject to change. In addition, the City may let contracts and implement projects that are not listed in this report; the listing of a project in this report is not required for the City to proceed with the project.
The City does not warrant or make any representation, expressed or implied, or assume any legal liability for the quality, content, accuracy, completeness or usefulness of the information, links and other items contained in the construction project pipeline, on this server or any other server. Agency Information The projects listed below are to be let by the following agencies. Click the acronym for the contact information of the Agency Contacting Officer and a link to the agency's web page. | Agency | Acronym | | Department of Citywide Administrative Services | DCAS | | Department of Correction | DOC | | Department of Design & Construction | DDC | | Department of Environmental Protection | DEP | | Department of Homeless Services | DHS | | Department of Parks & Recreation | DPR | | Department of Sanitation | DSNY | | Department of Transportation | DOT | | Fire Department | FDNY | | Housing Preservation and Development | HPD | | Police Department | NYPD |
Project List The projects listed below are to be let by city agencies. In addition to this list, the following excel spreadsheet contains additional useful information about these projects, including where the work will take place, if a project is subject to Local Law 129: the City’s M/WBE Program, and which projects are to be included in the City’s “Damages for Delay” pilot program. View/download this file (in Excel format). | Estimated Bid Date | Agency | Trade(s) | Project Description | Engineer's Estimate (Amount in 000s) | Subject to a PLA? (Yes / No) | | 11/9/2011 | DPR | Electrical | CITYWIDE- IN-KIND RECONSTR OF DETERIORATED ELECTRICAL SYSTEMS | 1,000 - 3,000 | Yes | | 11/9/2011 | DPR | Plumbing | CITYWIDE- IN-KIND RECONSTR OF DETERIORATED PLUMBING SYSTEMS | 1,000 - 3,000 | Yes | | 11/10/2011 | DEP | Electrical | Mahopac UV Disinfection & Fac Improvement (CRO-321E) | 100 - 500 | No | | 11/10/2011 | DEP | Gen Const | Mahopac UV Disinfection & Fac Improvement (CRO-321G) | 1,000 - 3,000 | No | | 11/10/2011 | DEP | HVAC | Mahopac UV Disinfection & Fac Improvement (CRO-321H) | 0 - 100 | No | | 11/10/2011 | DEP | Plumbing | Mahopac UV Disinfection & Fac Improvement (CRO-321P) | 0 - 100 | No | | 11/10/2011 | DEP | Gen Const | Sluice Gates - Ashokan Dividing Weir Gate Chamber | 10,000 - 25,000 | No | | 11/11/2011 | DEP | Various | High Pressure Boilers | 10,000 - 25,000 | Yes | | 11/14/2011 | DOT | Construction | Reconstruction of Piers Structures at the SI FMF (Phase 2) | 3,000 - 10,000 | No | | 11/30/2011 | DPR | General Contract | HANSBOROUGH REC CENTER - LADIES LOCKER ROOM PHASE 1 | 1,000 - 3,000 | Yes | | 12/6/2011 | DCAS | Electrical, includes GC, HVAC, Plumbing and Fire Suppression | 80 Centre Electrical Ugrade | 10,000 - 25,000 | Yes | | 12/6/2011 | DEP | General | Replace Doors, East Of Hudson District | 1,000 - 3,000 | No | | 12/11/2011 | DEP | | Kensico - Wind-induced turbidity control | 3,000 - 10,000 | No | | 1/15/2012 | DEP | Boiler | High Pressure Boilers | 3,000 - 10,000 | No | | 1/15/2012 | DEP | Electrical | A Centrifuge Refurbishment | 10,000 - 25,000 | Yes | | 1/31/2012 | DEP | ALL | Meter Testing Relocation | 500 - 1,000 | NO | | 3/15/2012 | DEP | Asb Handler | Asbestos Abatement | 100 - 500 | NO | | 3/15/2012 | DEP | | Demolition of 8 barns , Conesville/Hunter | 100 - 500 | No | | 3/28/2012 | DEP | Technician | Air Monitoring and Analysis | 100 - 500 | NO | | 4/1/2012 | DEP | | Design and construction of repair of Kensico BMP Facilities | 100 - 500 | No | | 4/1/2012 | DEP | | EOHNPS -Stormwater Remediation Projects | 1,000 - 3,000 | No | | 4/2/2012 | DEP | Various | DiGas Piping System | 10,000 - 25,000 | Yes | | 4/6/2012 | DEP | General, Electric, Plumbing | Reconstruction Of The HVAC System, Kensico Water Supply | 10,000 - 25,000 | No | | 5/1/2012 | DEP | | Design and construction of open channel flow measuring devices at two BMP Facilities | 500 - 1,000 | No | | 5/1/2012 | DEP | | Watershed Signs L/T Contract | 100 - 500 | No | | 5/4/2012 | DEP | Electrical | Engines/Dcontrols Reconstruction | 25,000 - 50,000 | Yes | | 6/1/2012 | DEP | ALL | Demo cafteria, construct new training center | 500 - 1,000 | NO | | 6/1/2012 | DEP | | Extension of the Pine Hill sanitary sewer system | 1,000 - 3,000 | No | | 6/1/2012 | DEP | General, Electric, Plumbing | Pleasantville Alum Plant Upgrade | 3,000 - 10,000 | No | | 6/1/2012 | DEP | | Sewer extension at Showers Road | 1,000 - 3,000 | No | | 9/1/2012 | DEP | Electrical | New Emergency Generator at Lefrak | 500 - 1,000 | NO | | 3/1/2013 | DEP | ALL | New Command Center (was Lefrak cafeteria) | 1,000 - 3,000 | NO | | Oct - Dec 11 | DCAS | GC | 100 Gold Street Roof Reconstruction | 3,000 - 10,000 | Yes | | Oct - Dec 11 | DCAS | GC | 125-01 Queens Blvd (Qns Crim Court) | 1,000 - 3,000 | Yes | | Oct - Dec 11 | DDC | Plumbing, HVAC, Elec, GC | HRT- CENTER ST. MUSEUM BLDGS UTILITY UPGRADES | 3,000 - 10,000 | Yes | | Oct - Dec 11 | DDC | Plumbing, HVAC, Elec, GC | DELANCEY AND ESSEX MUNICIPAL PARKING GARAGE | 3,000 - 10,000 | Yes | | Oct - Dec 11 | DDC | Plumbing, HVAC, Elec, GC | FTH - FLUSHING TOWN HALL INTERIOR/EXTERIOR UPGARDE | 500 - 1,000 | Yes | | Oct - Dec 11 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS IN FERN PLACE, 177TH STREET, RESCOE STREET AND VICINITY | 1,000 - 3,000 | No | | Oct - Dec 11 | DDC | Construction | PRIOR NOTICE SIDEWALKS - BRONX | 3,000 - 10,000 | No | | Oct - Dec 11 | DDC | Construction | REHABILITATION OF THE HIGH BRIDGE, LOCATED OVER THE HARLEM RIVER, BETWEEN MANHATTAN AND THE BRONX | 50,000 - 100,000 | No | | Oct - Dec 11 | DEP | Gen Const | BNR - HP Carbon, Phase 2 | 3,000 - 10,000 | Yes | | Oct - Dec 11 | DEP | Gen Const | Energy Conservation Measures, Improvements at 4 WWTP's | 1,000 - 3,000 | No | | Oct - Dec 11 | DEP | Gen Const | EOH Siphon Chambers, Mech. & Arch. Upgrade | 3,000 - 10,000 | No | | Oct - Dec 11 | DEP | Gen Const | Equipment Storage East | 1,000 - 3,000 | No | | Oct - Dec 11 | DEP | HVAC | HVAC System - DEL Shaft 18 Chlorine Tank Room | 500 - 1,000 | No | | Oct - Dec 11 | DEP | Gen Const | New Gate House (CRO-521) | 3,000 - 10,000 | Yes | | Oct - Dec 11 | DEP | Gen Const | Replace Doors, EOH, Phase 2 | 1,000 - 3,000 | No | | Oct - Dec 11 | DOT | Construction | City Island Road/Eastchester Bay (Bronx) | 100,000+ | No | | Oct - Dec 11 | DOT | Construction Related Services | Installation of Thermoplastic & Bus Lane Pavement Markings in the City of New York | 1,000 - 3,000 | No | | Oct - Dec 11 | DOT | Construction Related Services | Installation of Thermoplastic Markings on Newly Resurfaced Roadways | 3,000 - 10,000 | No | | Oct - Dec 11 | DOT | Construction Related Services | Installation of Thermoplastic Markings on Newly Resurfaced Streets | 3,000 - 10,000 | No | | Oct - Dec 11 | DOT | Construction Related Services | Installing, Removing & Relocate Electrical Equipment in Roads, Parks, Public Places | 3,000 - 10,000 | No | | Oct - Dec 11 | DOT | Construction Related Services | Installing, Removing & Relocating Street Light Illumination & Distribution Systems Equipment Citywide | 3,000 - 10,000 | No | | Oct - Dec 11 | DOT | Construction | Protective Coating of Greenpoint Avenue over Newtown Creek | 3,000 - 10,000 | No | | Oct - Dec 11 | DOT | Construction | Reconstruction of Building Envelope at the St. Island Ferry Maintenance Facility | 1,000 - 3,000 | No | | Oct - Dec 11 | DOT | Construction Related Services | Removal of Electro-Mechanical Controllers, Installation of ASTC Controllers, other Electrical Equipment and the Furnishing & Installation of Amber LED Lenses | 3,000 - 10,000 | No | | Oct - Dec 11 | DOT | Construction | Replacement of BSHP Bridge over Gerritsen Inlet | 100,000+ | No | | Oct - Dec 11 | DOT | Construction | Whitehall Ferry Perimeters & Rooftop Fencing | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | (B214) LINDEN PK/JHS 166 - HANDBALL CT & PK ENTRANCE; (B274) BAYVIEW PLGD - BASEBALL FIELD | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | ALICE AUSTEN PK- PORTIONS OF MCFARLANE-BREDT HOUSE | 100 - 500 | Yes | | Oct - Dec 11 | DPR | General Contract | AQUEDUCT WALK | 3,000 - 10,000 | No | | Oct - Dec 11 | DPR | General Contract | ASPHALT GREEN - MULTI-PURPOSE ATHLETIC FIELD, TRACK & BASKETBALL CT | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | BATTERY PARK - CONSTR OF BATTERY BIKEWAY, TOWN GREEN, PERIMETER EDGE, SIGNAGE & SITE WORK | 10,000 - 25,000 | No | | Oct - Dec 11 | DPR | General Contract | BATTERY PARK - CONSTR OF BATTERY BIKEWAY, TOWN GREEN, PERIMETER EDGE, SIGNAGE & SITE WORK | 10,000 - 25,000 | No | | Oct - Dec 11 | DPR | General Contract | BILL BROWN MEMORIAL PARK - PLAZA | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | BRONX - P.E.,S.S., PAVEMENTS, HANDBALL CTS & SITE WORK | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | HVAC | BRONX & MANHATTAN - PARTIAL RECONSTR OF HVAC SYS IN CONNECTION WITH RECONSTR OF REC CTRS & NATURE CTRS | 500 - 1,000 | Yes | | Oct - Dec 11 | DPR | General Contract | BRONX RIVER PARK - CONSTR OF MULTI-USE PATHS | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | HVAC | BROWNSVILLE REC CTR - HVAC SYSTEM IN POOL AREA | 1,000 - 3,000 | Yes | | Oct - Dec 11 | DPR | General Contract | CANARSIE PARK - CONSTR OF A MUSIC PAVILION | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | CASTLE HILL PARK - RECONSTR OF PIER | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | CEDAR GROVE BEACH - DEMOLITION OF BUNGALOWS & SITE RESTORATION | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | CITYWIDE - BDWLKS, ADA RAMPS, RAILINGS, STAIRS & BENCHES | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | Citywide deteriorated structural systems for DPR pool facilities | 1,000 - 3,000 | Yes | | Oct - Dec 11 | DPR | General Contract | Citywide removal & disposal of asbestos & lead containing material | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | CLOVE LAKES PARK - CONSTR OF MULTI-USE GREENWAY TRAIL | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | COLONEL MARCUS PLGD - COMFORT STATION & ADJACENT SITTING AREA | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | CONEY ISLAND - ENTRANCE @ BRIGHTON 15TH ST & BDWLK BETWEEN BRIGHTON 15TH ST & CONEY ISL AVE | 3,000 - 10,000 | No | | Oct - Dec 11 | DPR | General Contract | CONSTR OF ADA PED RAMP LINKING FT WASHINGTON & INWOOD HILL PARKS; & RECONSTR OF A PED ENTRANCE IN INWOOD | 3,000 - 10,000 | No | | Oct - Dec 11 | DPR | General Contract | CONSTR OF C.S. ADJACENT TO ST. JOHN'S REC CTR | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | CONSTR OF RANDALL'S/WARDS ISLAND WIND, SOLAR & TIDAL PROJECT (M107) | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | CRESCENT BEACH PARK - CONSTR OF SIDEWALKS, PATHS, GUARDRAIL & LANDSCAPE | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | CROTONA PARK - CONSTR OF A MAINTENANCE BLDG | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | DRY DOCK PLGD - P.E., SECURITY LIGHTING, & MISC SITE WORK | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | EARLY TOUR ENTRY LOCATED IN SOUTH PARK, FRESH KILLS PARK | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | FMCP - OLMSTED CENTER | 10,000 - 25,000 | No | | Oct - Dec 11 | DPR | General Contract | FORMER HELIPORT - RECONSTR OF RAMP & CONSTR OF A ROOFTOP SITTING AREA & SEARAIL | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | FORT TRYON PARK - PATH & STAIRS & MISC SITE WORK | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | FORT WASHINGTON PARK - CONSTR OF ADA PED. RAMP; RECONSTR OF PED. STEP RAMP & CITY-OWNED STAIRCASE. | 3,000 - 10,000 | No | | Oct - Dec 11 | DPR | General Contract | FRESH KILLS PARK - NORTH PARK (R017) | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | FT WASHINGTON PARK - PED BRIDGE OVER AMTRAK RAILROAD | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | FT. WASHINGTON PARK - CONSTR OF A BIKE & PEDESTRIAN PATH | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | GRAVESEND PARK - BASKETBALL & HANDBALL COURTS | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | LAURELTON WEST PLGD | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | LEIF ERICSON PARK - CONSTR OF COMFORT STATION | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | LITTLE BAY PARK - CONSTR OF COMFORT STATION | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | MARCUS GARVEY PARK - MT. MORRIS HISTORIC FIRE WATCHTOWER | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | MERCHANTS HOUSE MUSEUM | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | MIDLAND BEACH PARK - CONSTR OF 2 STEEL SHADE STRUCTURES | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | MORNINGSIDE PARK - 123RD ST PLGD | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | P.S. 28 (WRIGHT BROTHERS) PLGD & ADA UPGRADES TO C.S. | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | PECK SLIP | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | PELHAM PARKWAY MALLS (X003) | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | POE PARK - CONSTR OF ADA RAMP & MISC SITE WORK | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | PROSPECT PARK - PORTIONS OF PICNIC HOUSE | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | PUGSLEY CREEK PARK - CONSTR OF ENVIRONMENTAL PLAY AREA | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | HVAC | QUEENS - BOILERS & HEATING SYSTEMS | 100 - 500 | Yes | | Oct - Dec 11 | DPR | General Contract | QUEENS CNTY FARM MUSEUM - REMOVAL OF INVASIVE SPECIES, RESTORATION OF FARMLAND & MISC SITE WORK | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | HVAC | QUEENS, BROOKLYN & S.I. - PARTIAL RECONSTR OF HVAC SYS IN CONNECTION WITH RECONSTR OF REC CTRS & NATURE CTRS | 100 - 500 | Yes | | Oct - Dec 11 | DPR | General Contract | RAOUL WALLENBERG PLGD - COMFORT STATION (M037) | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | RECONSTR OF A PLAZA ALONG AQUEDUCT WALK & CONSTR OF 4 NYC DOT PARCELS ON UNIVERSITY AVE | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | RIVERSIDE PARK - FENCES, PAVEMENTS, STAIRCASES, RAMPS, WALLS & GENERAL SITE WORK | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | RIVERSIDE PARK - PEDESTRIAN RAMP @ WEST 72ND ST. BETW RIVERSIDE DR & HENRY HUDSON PKWY | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | Riverside Park- step ramp & landscape | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | RIVERSIDE PARK/79TH ST. BOAT BASIN - DOCK "A" | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | ROCKAWAY BEACH (68TH) - CONSTR OF A COMFORT STATION | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | SCHOOLYARDS @ PS 98M, PS 41M & JHS 167M | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | SOUNDVIEW PARK - CONSTR OF A NATURAL AMPHITHEATER | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | SOUNDVIEW PARK - DEMOLITION OF EXISTING & CONSTR OF C.S. & RECONSTR OF PLGD & SPORTS COURTS. | 3,000 - 10,000 | No | | Oct - Dec 11 | DPR | General Contract | SOUTH BEACH - CONSTR OF THREE TENNIS COURTS | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | ST. NICHOLAS NORTH PLGD - COMFORT STATION (M211B) | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | STARS & STRIPES PLGD (X193) | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | THE ARSENAL - DRAINAGE SYSTEM | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | THOMAS GREENE PLGD - SITTING AREA | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | TRYGVE LIE PLAZA - SITTING AREA | 100 - 500 | No | | Oct - Dec 11 | DPR | General Contract | VAN CORTLANDT PARK - HEAD HOUSE & DEMOLITION OF GREENHOUSES 4 & 5 | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | VCP- CONSTR OF PORTION OF PUTNAM RAIL TRAIL FROM CITY LINE TO VCP SOUTH | 1,000 - 3,000 | No | | Oct - Dec 11 | DPR | General Contract | VON KING CULTURAL ARTS CENTER - PHASE 3 | 500 - 1,000 | No | | Oct - Dec 11 | DPR | General Contract | VON KING CULTURAL ARTS CTR - THEATER, KITCHEN & AMPHITHEATER & CONSTR OF RECORDING STUDIO | 1,000 - 3,000 | Yes | | Oct - Dec 11 | DPR | General Contract | WESTERLEIGH PARK - CONSTR OF RAIN GARDEN & EROSION CONTROL | 500 - 1,000 | No | | Oct - Dec 11 | DSNY | Construction | East 91st Street Marine Transfer Station | 100,000+ | Yes | | Oct - Dec 11 | DSNY | Construction | Requirements Contract for Minor Roof Repairs & Restoration at Locations Citywide | 1,000 - 3,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, Elec, | 10 (17) MANHATTAN BRANCH FIRE ALARM | 3,000 - 10,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | 122 COMMUNITY CENTER COO PROJECT | 10,000 - 25,000 | Yes | | Jan - Mar 12 | DDC | Construction | BRONX ZOOWAY STREETSCAPE PHASE II | 100 - 500 | No | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | BROOKLYN CHILDREN'S MUSEUM- ROOF TOP RENOVATION | 3,000 - 10,000 | Yes | | Jan - Mar 12 | DDC | GC | CENTRAL REPAIR SHOP ROOF REPLACEMENT | 3,000 - 10,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | CONEY ISLAND USA - HVAC | 500 - 1,000 | Yes | | Jan - Mar 12 | DDC | Construction | CONSTRUCTION OF STORM AND SANITARY SEWERS AND APPURTENANCES: BERTRAM, PHILIP AND POILLON AVENUES BELOW HYLAN BOULEVARD, INCLUDING KENWOOD AVENUE, LYNCH STREET, PLUS HYLAN BETWEEN BERTRAM AND PHILIP | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | CONSTRUCTION OF STORM SEWERS, SANITARY SEWERS AND APPURTENANCES: DAHLIA STREET SOUTH OF ROSEDALE AVENUE, ROSEDALE BETWEEN POWELL STREET AND HUGUENOT AVENUE, POWELL FROM ROSEDALE TO SHIFT PLACE, AND SHIFT PLACE FROM DAHLIA TO HUGUENOT | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | DESIGN REHAB AND UPGRADE DEP SHAFT MAINT BUILD | 10,000 - 25,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | DOWNTOWN ARTS & ALPHA OMEGA DANCE COMPANY RENOV | 1,000 - 3,000 | Yes | | Jan - Mar 12 | DDC | Construction | EXTEND STORM SEWER AND REPLACE WATER MAIN: NORTH CONDUIT AVENUE FROM 246TH STREET TO FRANCIS LEWIS BOULEVARD | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | FIRE SUPPRESSION SYSTEM FOR NYPD LOCATIONS | 1,000 - 3,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | FTH - LINDEN PLACE PARKING LOT | 500 - 1,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | HARLEM STAGE-GATEHOUSE EXTERIOR ENHANCEMENTS | 500 - 1,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | HVAC REPLACEMENT AT BAISLEY | 100 - 500 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | HVAC REPLACEMENT AT OZONE PARK | 500 - 1,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | HVAC REPLACEMENT AT ROSEDALE | 100 - 500 | Yes | | Jan - Mar 12 | DDC | Construction | IMPLEMENTATION OF SCHOOL-SAFETY STREET IMPROVEMENTS AT FOUR SCHOOLS IN MANHATTAN TO INCLUDE: STREET RESURFACING; CURB AND SIDEWALK WORK; BUS PADS; PEDESTRIAN RAMPS; UTILITY WORK; STREET LIGHTING AND TRAFFIC SIGNALS; LANDSCAPING | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | IMPLEMENTATION OF SCHOOL-SAFETY STREET IMPROVEMENTS IN QUEENS, TO INCLUDE: STREET RESURFACING; CURB AND SIDEWALK WORK; BUS PADS; PEDESTRIAN RAMPS; UTILITY WORK; STREET LIGHTING AND TRAFFIC SIGNALS; LANDSCAPING--PS 108; ST. STANISLAUS KOSTKA SCHOOL; ST. JO | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | IMPLEMENTATION OF SCHOOL-SAFETY STREET IMPROVEMENTS IN THE BRONX, TO INCLUDE: STREET RESURFACING; CURB AND SIDEWALK WORK; BUS PADS; PEDESTRIAN RAMPS; UTILITY WORK; STREET LIGHTING AND TRAFFIC SIGNALS; LANDSCAPING--CIS 303; ST. ANGELEA MERICI SCHOOL; IMMAC | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | IMPLEMENTATION OF STREET IMPROVEMENT MEASURES NEAR SCHOOLS TO PROMOTE SAFETY. THE SCOPE INCLUDES WORK ON: CURBS AND SIDEWALKS; BUS PADS; PEDESTRIAN RAMPS; UTILITIES; SPEED REDUCERS; STREET LIGHTING; TRAFFIC SIGNALS; LANDSCAPING. SIX LOCATIONS IN BROOKLY | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | INSTALL COMBINED SEWER AND PERFORM RELATED WATER MAIN WORK IN GRANDVIEW AVENUE AND VICINITY | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS AND WATER MAIN IN PERU STREET BETWEEN MORSE AVENUE AND HAROLD STREET | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS, WATER MAINS AND APPURTENANCES IN WARDS POINT AVENUE AND ADJACENT SECTIONS OF AMBOY ROAD, SATTERLEE STREET, TOTTENVILLE PLACE AND PERTH AMBOY PLACE | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | INSTALL TRUNK WATER MAIN, CONNECTING CITY TUNNEL #3 TO THE DISTRIBUTION SYSTEM: 9TH AND 10TH AVENUES FROM 29TH TO 31ST STREETS, AND THE INTERVENING BLOCKS OF 29TH, 30TH AND 31ST STREETS | 10,000 - 25,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | IRISH REPERTORY THEATRE - PHASE I RENOVATIONS | 1,000 - 3,000 | Yes | | Jan - Mar 12 | DDC | GC | LA MAMA - ANNEX THEATER GRID | 500 - 1,000 | Yes | | Jan - Mar 12 | DDC | Construction | PRIOR NOTICE SIDEWALKS - MANHATTAN | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | PRIOR NOTICE SIDEWALKS - CITYWIDE | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | PRIOR NOTICE SIDEWALKS - QUEENS | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | REBUILD EXISTING CATCH BASINS, QNS | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | REBUILD EXISTING CATCH BASINS, QNS | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | REBUILD EXISTING CATCH BASINS, QNS | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | RECONSTRUCTION OF PORTIONS OF SUTTER AVENUE, 142ND AND 145TH STREETS, BETWEEN ROCKAWAY BOULEVARD AND NORTH CONDUIT AVENUE | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | RECONSTRUCTION OF ROBERTO CLEMENTE PLAZA AND RELATED ROADWAY WORK | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | REPLACE COMBINED AND SANITARY SEWER, AND WATER MAIN IN WATER EDGE DRIVE BETWEEN 23RD ROAD AND 23RD AVENUE, AND IN FRANCIS LEWIS BOULEVARD FROM 26TH TO 29TH AVENUE | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | REPLACE SANITARY SEWERS AND INSTALL STORM SEWER EXTENSIONS, CLEVELAND PLACE, FINGERBOARD ROAD AND VICINITY | 500 - 1,000 | No | | Jan - Mar 12 | DDC | Construction | REPLACE STORM SEWERS AND PROVIDE NEW EXTENSIONS, COMMERCE AVENUE BETWEEN WESTCHESTER SQUARE AND NEW BOLD AVENUE AND VICINITY | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | REPLACE WATER MAIN AND STORM SEWERS AT TWO LOCATIONS IN QUEENS: SECTIONS OF 107TH AND 109TH AVENUES AND 220TH STREET OFF SPRINGFIELD BOULEVARD; AND 76TH AVENUE FROM 271ST STREET TO THE DEAD END PAST HEWLETT STREET | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | REPLACE/EXTEND STORM AND SANITARY SEWERS; REPLACE WATER MAIN, VARIOUS LOCATIONS | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | ROAD IMPROVEMENT AT SOUTH AVENUE AND FOREST AVENUE | 500 - 1,000 | No | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | S. I. ANIMAL SHELTER - EXPANSION & RENOVATION | 1,000 - 3,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | SCULPTURE CENTER EXPANSION - PHASE 2-A | 500 - 1,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | SHCC BLDG'S "F&G" INFRASTRUCTURE & INTERIOR RECONS | 10,000 - 25,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | SIX BRONX BRANCH LIBRARY- HVAC | 1,000 - 3,000 | Yes | | Jan - Mar 12 | DDC | Construction | STORM SEWER AND WATER MAIN WORK AT THREE LOCATIONS: AREA BOUNDED BY 116TH AND 118TH AVENUES, 200TH STREET AND FRANCIS LEWIS BOULEVARD PLUS ADJACENT STREETS; NASHVILLE BOULEVARD FROM 116TH AVENUE AND 208TH STREET PLUS SECTIONS OF 208TH STREET AND 116TH ROA | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | STREET IMPROVEMENTS FOR INCREASED SAFETY IN SCHOOL ZONES -- TOTAL OF 12 LOCATIONS IN QUEENS, MANHATTAN AND BROOKLYN. THE WORK INCLUDES: CURBS AND SIDEWALKS; BUS PADS; PEDESTRIAN RAMPS; SPEED REDUCERS; STREET LIGHTS; TRAFFIC SIGNALS AND LANDSCAPING. | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | STREET IMPROVEMENTS TO INCREASE SAFETY IN SCHOOL ZONES AT A TOTAL OF 8 LOCATIONS IN THE BRONX AND STATEN ISLAND. THE SCOPE OF WORK INCLUDES: CURBS AND SIDEWALKS; BUS PADS; PEDESTRIAN RAMPS; INFRASTRUCTURE UTILITY WORK; SPEED REDUCERS; STREET LIGHTS AND | 3,000 - 10,000 | No | | Jan - Mar 12 | DDC | Construction | STREET RECONSTRUCTION, 175TH STREET BETWEEN BROADWAY AND WADSWORTH AVENUE, TO CREATE A PEDESTRIAN PLAZA WITH AMENITIES INCLUDING TREES, PLANTINGS, LIGHTING AND BENCHES | 1,000 - 3,000 | No | | Jan - Mar 12 | DDC | Construction | STREET RECONSTRUCTION, INCLUDING SEWER AND WATER MAIN WORK | 10,000 - 25,000 | No | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | UPGRADES AT CHELSEA HEALTH CENTER | 10,000 - 25,000 | Yes | | Jan - Mar 12 | DDC | Plumbing, HVAC, Elec, GC | WOODSTOCK BRANCH - INTERIOR RENOVATION & ADA | 3,000 - 10,000 | Yes | | Jan - Mar 12 | DEP | Gen Const | ARP/Demilition and Construction | 1,000 - 3,000 | Yes | | Jan - Mar 12 | DEP | Electrical | Catskill Lower Effluent Chamber - Elect. Upgrade | 500 - 1,000 | No | | Jan - Mar 12 | DEP | Gen Const | Cattskill Aqueduct Stop Logs | 3,000 - 10,000 | No | | Jan - Mar 12 | DEP | Gen Const | Crane & Hoist Replacement - EOH | 1,000 - 3,000 | No | | Jan - Mar 12 | DEP | Electrical | Croton Falls Pumping Station Electrical | 1,000 - 3,000 | No | | Jan - Mar 12 | DEP | HVAC | Croton Falls Pumping Station HVAC | 100 - 500 | No | | Jan - Mar 12 | DEP | Plumbing | Croton Falls Pumping Station Plumbing | 1,000 - 3,000 | No | | Jan - Mar 12 | DEP | Gen Const | Croton Falls Pumping Station Structures & Equipment | 50,000 - 100,000 | No | | Jan - Mar 12 | DEP | Gen Const | Inspect and Replace Under Water Valve at Rondout | 3,000 - 10,000 | No | | Jan - Mar 12 | DEP | Gen Const | Pleasantville Alum Plant Upgrade | 3,000 - 10,000 | No | | Jan - Mar 12 | DEP | Gen Const | Replace Doors at EOH | 1,000 - 3,000 | No | | Jan - Mar 12 | DOT | Construction | Belt Shore Parkway over Bay Ridge Avenue | 3,000 - 10,000 | No | | Jan - Mar 12 | DOT | Construction | Comp Rehab of 10 Bridges Brooklyn | 3,000 - 10,000 | No | | Jan - Mar 12 | DOT | Construction, Electrical | Furnish and Install Fiber Optic Cable Along FDR Drive | 3,000 - 10,000 | No | | Jan - Mar 12 | DOT | Construction Related Services | Furnish and Install Pedestrian Countdown Signal LED Lenses | 1,000 - 3,000 | No | | Jan - Mar 12 | DOT | Construction | Street Lighting < 10 Year Plan (Install, Remove or Relocate Electrical Equipment in Roads, Parks & Public Places) | 3,000 - 10,000 | No | | Jan - Mar 12 | DOT | Construction | Traffic Park & Highway Distribution (Ten Year Plan) | 3,000 - 10,000 | No | | Jan - Mar 12 | DOT | Construction | Traffic Signals (Ten Year Plan) | 10,000 - 25,000 | No | | Jan - Mar 12 | DPR | Electrical | (ELECTRICAL) FERRY PT GOLF COURSE - CONSTR OF MAINT. BLDG, C.S. & RAIN SHELTER | 500 - 1,000 | No | | Jan - Mar 12 | DPR | HVAC | (HVAC) FERRY PT GOLF COURSE - CONSTR OF MAINT. BLDG, C.S. & RAIN SHELTER | 100 - 500 | No | | Jan - Mar 12 | DPR | Plumbing | (PLUMBING) FERRY PT GOLF COURSE - CONSTR OF MAINT. BLDG, C.S. & RAIN SHELTER | 100 - 500 | No | | Jan - Mar 12 | DPR | General Contract | AQUEDUCT WALK - CONSTR OF A COMFORT STATION | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | Aqueduct walk- construction of a comfort station | 500 - 1,000 | No | | Jan - Mar 12 | DPR | General Contract | BRONX PARK - CONSTR OF A BRONX RIVER GREENWAY LINK | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | BRONX RIVER/STARLIGHT PARK - CONSTR OF A COMFORT STATION | 1,000 - 3,000 | Yes | | Jan - Mar 12 | DPR | HVAC | Brooklyn - boilers & heating systems | 500 - 1,000 | Yes | | Jan - Mar 12 | DPR | General Contract | Brooklyn- pavements, tennis cts, bb cts, fencing, plantings | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | CEDAR GROVE BEACH - DEMOLITION OF BUNGALOWS | 100 - 500 | No | | Jan - Mar 12 | DPR | General Contract | CONSTR OF A PORTION OF BRONX RIVER GREENWAY - BETW SOUNDVIEW PK @ LAFAYETTE AVE & BRUCKNER BLVD | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | CONSTR OF BRADHURST ROBERT CLINNSDALE PARK (W 146 ST PLGD) | 500 - 1,000 | No | | Jan - Mar 12 | DPR | General Contract | CONSTR OF PLGD BETW W 162ND & W 164TH ST & RECONSTR OF FORT WASHINGTON PK BETW W 155TH & W 168TH | 3,000 - 10,000 | No | | Jan - Mar 12 | DPR | General Contract | CO-OP CITY BALLFIELDS - PAVED PATHS, BLEACHERS & GREEN AREA | 100 - 500 | No | | Jan - Mar 12 | DPR | General Contract | COURT AREA IN P.S. 87 (TECUMSEH) PLGD | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | Cunningham Park- Ballfield 2-4 | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | FERRY POINT - furnishing/delivery of cover material in Golf Course | 3,000 - 10,000 | No | | Jan - Mar 12 | DPR | General Contract | FMCP - Construction of volleyball courts | 100 - 500 | No | | Jan - Mar 12 | DPR | General Contract | FMCP/FOUNTAIN OF THE FAIRS - SYNTH TURF SOCCER FIELDS 2, 3 & 5 | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | FOREST PARK - RECONSTR OF PATHS & CONSTR OF FENCING NEAR BANDSHELL | 100 - 500 | No | | Jan - Mar 12 | DPR | General Contract | FRESH KILLS PARK - NORTH PARK (R017) | 500 - 1,000 | No | | Jan - Mar 12 | DPR | General Contract | FT. TOTTEN - SEAWALLS | 500 - 1,000 | No | | Jan - Mar 12 | DPR | General Contract | HARRY MAZE MEM. PARK - INSTALLATION OF PARK SECURITY LIGHTING | 100 - 500 | No | | Jan - Mar 12 | DPR | General Contract | HIGHBRIDGE PARK - RESTORATION OF CITY-OWNED HIGHBRIDGE STEP-STREET & LANDSCAPE RESTORATION | | No | | Jan - Mar 12 | DPR | General Contract | HUTCHINSON RIVER GREENWAY - CONSTR OF A PORTION | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | IDLEWILD PARK - CONSTR OF PKG LOT, TRAILS & MARINE ACESS STRUCTURES (SITE B) | 500 - 1,000 | No | | Jan - Mar 12 | DPR | General Contract | JAMES J. WALKER - SYNTHETIC BALLFIELD | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | JARDIN DE LA FAMILIA - SIDEWALK & PERIMETER FENCE | 100 - 500 | No | | Jan - Mar 12 | DPR | General Contract | LINCOLN TERRACE PARK - PLGD | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | LITTLE BAY PARK - CONSTR OF COMFORT STATION | 3,000 - 10,000 | No | | Jan - Mar 12 | DPR | General Contract | LONDON PLANETREE PARK - CONSTR OF SPORTS COURTS & SKATE PARK | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | Manhattan- P.E., S.S. pavement & general site work | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | PELHAM BAY PARK: oil tank & heating system at sewagw treatment | 100 - 500 | No | | Jan - Mar 12 | DPR | General Contract | PELHAM BAY PARK: WATERFRONT DEVELOPMENT | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | PERIMETER SIDEWALKS ALONG EMMONS AVE, FROM E 14TH ST TO OCEAN AVE | 100 - 500 | No | | Jan - Mar 12 | DPR | General Contract | PS 304 PULASKI PLGD-MULTI-PURPOSE AREA & CTS; TILDEN PLGD-TENNIS CTS | 500 - 1,000 | No | | Jan - Mar 12 | DPR | General Contract | Queens - P.E., S. S. handball cts, basketball, fencing & general site work | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | QUEENS - PAVEMENTS, FENCING, TENNIS CTS, HANDBALL CTS, PLANTINGS | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | RECONSTR OF ROOFS AT: RUFUS KING MANOR (Q023) & LATIMER HOUSE (Q497) | 500 - 1,000 | Yes | | Jan - Mar 12 | DPR | General Contract | RECONSTRUCTION OF PAVEMENTS, FENCES, & GENERAL SITE WORK AT VARIOUS LOCATIONS IN FMCP (Q099) & KISSINA PARK (Q024) | 1,000 - 3,000 | No | | Jan - Mar 12 | DPR | General Contract | SARATOGA SQUARE PARK - MEMORIAL | 100 - 500 | No | | Jan - Mar 12 | DPR | General Contract | TWO C.S.: PLGD ADJ TO PS 256 (BANNEKER) & TILDEN PLGD | 500 - 1,000 | Yes | | Jan - Mar 12 | DPR | General Contract | VCP - DEMOLITION OF GREENHOUSES #4 & #5, CONSTR OF NEW GREENHSE & RECONSTR OF HEAD HSE. | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DCAS | GC, Plumbing, HVAC, Elec | 1 Centre St., 5th Fl. Comptroller's Renovation | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DCAS | GC, Plumbing, HVAC, Elec | 1 Centre St., 8th Fl. Comptroller's Office Renovations | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DCAS | Electrical | 10 Richmond Terrace Electrical Upgrade | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DCAS | Electrical | 210 Joralemon Electrical Upgrade | 10,000 - 25,000 | Yes | | Apr - Jun 12 | DCAS | GC | 31 Chambers Skylight reconstruction | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DCAS | GC | 360 Adams Street Façade Rehab. | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DCAS | GC | 80 Centre Street Roof Reconstruction | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | BELMONT BLOOMINGDALE BRANCH LIBRARY | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | CENTRAL RENOVATIONS | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DDC | Construction | CHESTER AVENUE, STATEN ISLAND (W/SE-761) | 10,000 - 25,000 | No | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | CONSTRUCTION OF NEW DIESEL STATION, HARPER ST. YD. | 3,000 - 10,000 | No | | Apr - Jun 12 | DDC | Construction | CONSTRUCTION OF SANITARY AND STORM SEWERS, WATER MAINS AND APPURTENANCES IN AREA SURROUNDED BY RENSSELAER, HUGUENOT, ROSEDALE AND BELFIELD AVENUES, AND POWELL STREET. PROJECT INCLUDES A BEST MANAGEMENT PRACTICE STORM SEWER OUTLET | 10,000 - 25,000 | No | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | DESIGN AND CONSTRUCTION SERVICES FOR THEATER AND ANCILLARY PROGRAM SPACE FOR THE ALLIANCE OF RESIDENT THEATRES/NEW YORK (ART/NY) ON WEST 53RD STREET IN MANHATTAN. THIS PROJECT INCLUDES A PERCENT FOR ART COMPONENT | 10,000 - 25,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | EAST ELMHURST EXPANSION | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | ECONOMIC DEVELOPMENT | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | ELEVATOR REPLACEMENT AT CENTRAL BRANCH LIBRARY | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | FUEL TANK REPLACEMENT | 3,000 - 10,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | INITIAL CONSTRUCTION ON FACILITIES FOR THE MANHATTAN CLASS COMPANY (MCC) THEATER, LOCATED ON THE GROUND AND SECOND FLOORS IN THE ARCHSTONE CLINTON DEVELOPMENT ON 10TH AVENUE IN HELLS KITCHEN. THE SPACE WILL INCLUDE TWO THEATERS, DRESSING ROOMS, ADMINISTR | 10,000 - 25,000 | Yes | | Apr - Jun 12 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS IN HYLAN BOULEVARD BETWEEN RICHARD AVENUE AND BUTLER BOULEVARD, INCLUDING SECTIONS OF RICHARD AVENUE, BUTLER BOULEVARD AND ADJOINING STREETS | 10,000 - 25,000 | No | | Apr - Jun 12 | DDC | Construction | INSTALL STORM AND SANITARY SEWERS; REPLACE WATER MAINS, IN ROBINSON AVENUE AND VICINITY | 10,000 - 25,000 | No | | Apr - Jun 12 | DDC | Construction | INSTALLATION OF TRUNK WATER MAINS AT VARIOUS LOCATIONS ALONG 59TH STREET TO CONNECT WATER TUNNEL SHAFT TO THE DISTRIBUTION SYSTEM | 10,000 - 25,000 | No | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | JEFFERSON MARKET LIBRARY ADA ACCESS | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | LEONARD COVELLO | 100 - 500 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | NYHOS - LIGHTING FOR OUTDOOR EXHIBITS | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | OEM CONEY ISLAND LAN UPGRADE | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DDC | Construction | PEDESTRIAN BRIDGES AT 51 AV / 216 ST / E 81 ST | 10,000 - 25,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | QUEENS THEATER IN THE PARK-ORIGINAL CIRCULAR LOBBY | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DDC | Construction | REHABILITATE RETAINING WALL AT MACOMB DAM BRIDGE APPROACH TO 161ST STREET-- INCLUDES STREET RECONSTRUCTION | 1,000 - 3,000 | No | | Apr - Jun 12 | DDC | Construction | REPLACE CATCH BASINS AND PEDESTRIAN RAMPS AT MULTIPLE LOCATIONS IN STATEN ISLAND | 1,000 - 3,000 | No | | Apr - Jun 12 | DDC | Construction | REPLACE DISTRIBUTION WATER MAIN, HYDRANTS AND VALVES, AND INSTALL EXTENSIONS TO NEW BUILDINGS, AT LOCATIONS IN QUEENS AND THE BRONX | 3,000 - 10,000 | No | | Apr - Jun 12 | DDC | Construction | REPLACE STORM AND SANITARY SEWERS, INSTALL NEW EXTENSIONS: CUBA AVENUE AND VICINITY, STATEN ISLAND | 3,000 - 10,000 | No | | Apr - Jun 12 | DDC | Construction | REPLACE WATER MAIN AND INSTALL NEW STORM SEWER EXTENSIONS IN WATERBURY AVENUE BETWEEN ELLSWORTH AND STADIUM AVENUES, INCLUDING NEARBY PORTIONS OF BAISLEY, THROGMORTON, FAIRMOUNT, VINCENT, AND WILCOX AVENUES | 3,000 - 10,000 | No | | Apr - Jun 12 | DDC | Construction | REPLACE WATER MAINS AT MULTIPLE LOCATIONS | 3,000 - 10,000 | No | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | SOUTH SHORE BABE RUTH LEAGUE | 500 - 1,000 | Yes | | Apr - Jun 12 | DDC | Plumbing, HVAC, Elec, GC | SUNSET PARK BRANCH LIBRARY INTERIOR MODIFICATIONS | 1,000 - 3,000 | Yes | | Apr - Jun 12 | DEP | Gen Const | CSO-Hendrix Creek-NC Wetland Mitigation | 1,000 - 3,000 | No | | Apr - Jun 12 | DEP | Gen Const | Gilboa Dam - STIC | 25,000 - 50,000 | No | | Apr - Jun 12 | DEP | Gen Const | New Croton Dam Gate House Number 2 | 25,000 - 50,000 | No | | Apr - Jun 12 | DEP | Gen Const | Reconstruct Roads EOH | 3,000 - 10,000 | No | | Apr - Jun 12 | DEP | Gen Const | Resurface Schoharie Roads W & Bearkill Bridge | 3,000 - 10,000 | No | | Apr - Jun 12 | DEP | Gen Const | Shaft 23/16A Reconstruction | 25,000 - 50,000 | Yes | | Apr - Jun 12 | DEP | Gen Const | Shaft 4, Connection Del-Cat Aqueduct | 25,000 - 50,000 | No | | Apr - Jun 12 | DOT | Construction | Replacement of Derrick #1 | 1,000 - 3,000 | No | | Apr - Jun 12 | DOT | Construction, Electrical | Traffic Signal Mantenance Borough of Bronx | 10,000 - 25,000 | No | | Apr - Jun 12 | DOT | Construction, Electrical | Traffic Signal Mantenance Borough of Brooklyn | 25,000 - 50,000 | No | | Apr - Jun 12 | DOT | Construction, Electrical | Traffic Signal Mantenance Borough of Manhattan | 10,000 - 25,000 | No | | Apr - Jun 12 | DOT | Construction, Electrical | Traffic Signal Mantenance Borough of Queens | 10,000 - 25,000 | No | | Apr - Jun 12 | DOT | Construction, Electrical | Traffic Signal Mantenance Borough of Staten Island | 3,000 - 10,000 | No | | Apr - Jun 12 | DPR | | BELDEN POINT - STREET END | 100 - 500 | No | | Apr - Jun 12 | DPR | General Contract | BRONX PARK - INSTALLATION OF ANADROMOUS FISH PASSAGE & RECONSTR OF ABUTMENTS @ DAM LOCATED @ BX RIVER/182ND ST. | 1,000 - 3,000 | No | | Apr - Jun 12 | DPR | General Contract | CANARSIE PLAYGROUND | 1,000 - 3,000 | No | | Apr - Jun 12 | DPR | General Contract | CONSTR OF JOGGING TRAIL AROUND JEROME PARK RESERVOIR | 1,000 - 3,000 | No | | Apr - Jun 12 | DPR | General Contract | CROTONA TENNIS COURTS PH 3 | 1,000 - 3,000 | No | | Apr - Jun 12 | DPR | General Contract | MARTINSON PLAYGROUND | 1,000 - 3,000 | No | | Apr - Jun 12 | DPR | General Contract | MOSHULU PKWY/WW1 MONUMENT - CONSTR OF A LIGHTING SYSTEM | 0 - 100 | No | | Apr - Jun 12 | DPR | General Contract | PORTIONS OF PLAZA IN P.S. 17 PLGD (ATHENS SQ) | 500 - 1,000 | No | | Apr - Jun 12 | DPR | General Contract | PS 183 (BEACH CHANNEL) PLGD | 500 - 1,000 | No | | Apr - Jun 12 | DPR | General Contract | ROCKAWAY BEACH - SKATE PARK FACILITY | 500 - 1,000 | No | | Apr - Jun 12 | DPR | General Contract | TORNSEY (LOU LODATI) PLGD | 1,000 - 3,000 | No | | Apr - Jun 12 | DSNY | Construction | Brooklyn 12 Annex Sound Attenuation Wall | 500 - 1,000 | Yes | | Apr - Jun 12 | DSNY | Construction | Southwest Brooklyn Marine Transfer Station | 100,000+ | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | AFRIKAN POETRY THEATRE RECONSTRUCTION PROJECT | 3,000 - 10,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | APPARATUS FLOOR REPLACEMENT AT EC60 | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | APPRATUS FLOORS REPLACEMENT AT EC292 | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Elec, GC | HUDSON PARK BRANCH - ACCESSIBILITY PROJECT | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Construction | IMPLEMENTATION OF SCHOOL SAFETY IMPROVEMENTS AT FIVE LOCATIONS IN BROOKLYN. THE SCOPE INCLUDES NEW/UPGRADED CURBS AND SIDEWALKS, BUS PADS, PEDESTRIAN RAMPS, SPEED REDUCERS, STREET LIGHTS AND TRAFFIC SIGNALS, AND LANDSCAPING. | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | IMPLEMENTATION OF SCHOOL SAFETY IMPROVEMENTS AT SIX LOCATIONS IN QUEENS. THE SCOPE INCLUDES NEW/UPGRADED CURBS AND SIDEWALKS, BUS PADS, PEDESTRIAN RAMPS, SPEED REDUCERS, STREET LIGHTS AND TRAFFIC SIGNALS, AND LANDSCAPING. | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | IMPLEMENTATION OF SCHOOL-SAFETY IMPROVEMENTS AT FIVE LOCATIONS IN THE BRONX AND MANHATTAN. THE SCOPE INCLUDES NEW/UPGRADED CURBS AND SIDEWALKS, BUS PADS, PEDESTRIAN RAMPS, SPEED REDUCERS, STREET LIGHTS AND TRAFFIC SIGNALS, AND LANDSCAPING. | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | IMPLEMENTATION OF SCHOOL-SAFETY STREET IMPROVEMENTS TO INCLUDE: STREET RESURFACING; CURB AND SIDEWALK WORK; BUS PADS; PEDESTRIAN RAMPS; UTILITY WORK; STREET LIGHTING AND TRAFFIC SIGNALS; LANDSCAPING--PS299 IN BROOKLYN, AND IN STATEN ISLAND, ST. TERESA, SA | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | INSTALL CATCH BASINS, 25 LOCATIONS IN QUEENS | 500 - 1,000 | No | | July - Sept 12 | DDC | Construction | INSTALL STORM AND COMBINED SEWER EXTENSIONS AND REPLACE WATER MAIN: HOOK CREEK BOULEVARD, MERRICK ROAD AND BROOKVILLE BOULEVARD INCLUDING ADJACENT SECTIONS OF 241ST, 242ND, 243RD AND 244TH STREETS; 130TH, 132ND AND 133RD AVENUES; AND 128TH, 131ST AND 132N | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | NEW HVAC SYSTEM AT ANNA M. KROSS CENTER K-DORMITORIES, RIKERS ISLAND | 3,000 - 10,000 | Yes | | July - Sept 12 | DDC | Construction | PROVIDE DISTRIBUTION WATER MAIN EXTENSIONS (AND REPLACEMENTS) FOR NEW BUILDINGS | 1,000 - 3,000 | No | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | QBG - PATHWAYS, SYSTEM & SITE IMPROVEMENTS | 3,000 - 10,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | QUEENS BOTANICAL GARDEN - ENTRANCES PROJECT | 3,000 - 10,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | QUEENS WEST HUNTERS POINT COMMUNITY LIBRARY | 10,000 - 25,000 | Yes | | July - Sept 12 | DDC | Construction | RECONSTRUCT ROADWAY; REPLACE WATER MAIN; REHABILITATE SEWERS: SECTIONS OF BROADWAY AND ADJOINING STREETS SOUTH OF FULTON | 25,000 - 50,000 | No | | July - Sept 12 | DDC | Construction | RECONSTRUCTION OF ADJOINING SECTIONS OF EAST 177TH STREET, DEVOE AVENUE AND EAST TREMONT AVENUE, FROM BRONX PARK AVENUE TO BOSTON ROAD | 10,000 - 25,000 | No | | July - Sept 12 | DDC | Construction | RECONSTRUCTION OF GRAND CONCOURSE SERVICE ROADS BETWEEN EAST 166TH AND EAST 171ST STREETS. INCLUDES WIDENING OF MEDIAN, INSTALLATION OF BICYCLE LANES AND LANDSCAPING | 10,000 - 25,000 | No | | July - Sept 12 | DDC | Construction | REHABILITATE STONE RETAINING WALL ALONG THE WEST SIDE OF RIVERSIDE DRIVE, NORTHBOUND, FROM WEST 177TH STREET TO WEST 178TH STREET | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | ROADWAY RECONSTRUCTION TO CREATE A PEDESTRIAN PLAZA ON THE WEST SIDE OF PARK AVENUE BETWEEN 41ST STREET AND 42ND STREET ADJACENT TO THE VIADUCT | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | ROADWAY RECONSTRUCTION, INCLUDING SANITARY AND STORM SEWERS, WATER MAIN, TRAFFIC MANAGEMENT AND STREET LIGHTING: GATEWAY ESTATES AREA OF EAST NEW YORK, BROOKLYN | 10,000 - 25,000 | No | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | SCHOMBURG CENTER-MCKIM BUILDING UPGRADES | 3,000 - 10,000 | Yes | | July - Sept 12 | DDC | Plumbing, HVAC, Elec, GC | STATEN ISLAND ZOO- AQUARIUM RECONSTRUCTION | 1,000 - 3,000 | Yes | | July - Sept 12 | DDC | Construction | STREET RECONSTRUCTION AND RECONFIGURATION, INCLUDES THE EXPANSION OF COOPER PARK AND CREATION OF NEW PEDESTRIAN PLAZAS | 3,000 - 10,000 | No | | July - Sept 12 | DDC | Construction | WATERMAIN WORK IN VARIOUS LOCATIONS PROJ Q2008-14 | 1,000 - 3,000 | No | | July - Sept 12 | DEP | Gen Const | 11 Del Bridges and Culverts | 25,000 - 50,000 | No | | July - Sept 12 | DEP | Gen Const | Ben Nesin Lab Replacement and Reconstruction | 1,000 - 3,000 | No | | July - Sept 12 | DEP | Gen Const | CA Erosion Restoration - Millwood and Lake Streets | 1,000 - 3,000 | No | | July - Sept 12 | DEP | Electrical | DEL Shaft 18 - Elect. Upgrade | 3,000 - 10,000 | No | | July - Sept 12 | DEP | Gen Const | Fall Protection for Delaware Dams | 3,000 - 10,000 | No | | July - Sept 12 | DEP | Gen Const | Gilboa Dam - Lower Level Outlet | 100,000+ | No | | July - Sept 12 | DEP | Gen Const | Gilboa Dam - ShandankenTunnel Intake Chamber | 25,000 - 50,000 | No | | July - Sept 12 | DEP | Gen Const | Kensico Dam Road Closure Mitigation | 1,000 - 3,000 | No | | July - Sept 12 | DEP | Gen Const | New Gate House (CRO-521) | 3,000 - 10,000 | Yes | | July - Sept 12 | DEP | Gen Const | Reconst. Concrete Beams & Floors - Ashokan Garage | 1,000 - 3,000 | No | | July - Sept 12 | DEP | Gen Constr | Reconstruction of Bulkhead and Fendering at the RK WPCP | 10,000 - 25,000 | Yes | | July - Sept 12 | DEP | Gen Const | Replace Doors, EOH, Phase 2 | 1,000 - 3,000 | No | | July - Sept 12 | DEP | Gen Const | Sewer Line Stream Crossings, W O H | 3,000 - 10,000 | No | | July - Sept 12 | DEP | Gen Const | Shaft 23/16A Reconstruction | 25,000 - 50,000 | Yes | | July - Sept 12 | DEP | Gen Const | Wetland Mitigation at KAP Site | 3,000 - 10,000 | No | | July - Sept 12 | DEP | Gen Const | WOD Lightning Protection | 1,000 - 3,000 | No | | July - Sept 12 | DOT | Construction | Harlem River Drive | 100,000+ | No | | July - Sept 12 | DOT | Construction Related Services | Repair Electrical and Utility Systems FMF Piers | 3,000 - 10,000 | No | | July - Sept 12 | DOT | Construction | Whitehall Ferry Terminal Substructure Reconstruction | 2,500 - 3,500 | No | | July - Sept 12 | DPR | General Contract | BELDEN POINT | 0 - 100 | No | | July - Sept 12 | DPR | General Contract | CANARSIE PARK - CONSTR OF A PLGD | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | CONSTR OF AN ANNEX TO, & RECONSTR OF ALLEY POND ENV'TL CENTER | 3,000 - 10,000 | Yes | | July - Sept 12 | DPR | General Contract | CONSTR OF SIGNAGE ALONG ROUTE OF OLD CROTON AQUEDUCT | 100 - 500 | No | | July - Sept 12 | DPR | General Contract | CROTONA PARK - NATURE CENTER (BOAT HOUSE) | 500 - 1,000 | Yes | | July - Sept 12 | DPR | General Contract | CROTONA PARK - TOWERS, BRDIGE, STAIRS & RETAINING WALL @ ENTRANCE TO BATHHOUSE | 500 - 1,000 | No | | July - Sept 12 | DPR | General Contract | FABER PARK - CONSTR OF A SKATE PARK | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | FORT TRYON PARK - STAIRCASE #50 & MISC SITE WORK | 500 - 1,000 | No | | July - Sept 12 | DPR | General Contract | FREDERICK JOHNSON PARK - 8 TENNIS COURTS | 500 - 1,000 | No | | July - Sept 12 | DPR | General Contract | HIGHLAND PARK - NATURAL TURF BALLFIELDS 1 & 2 | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | MACOMB BRIDGE PATHWAY | 500 - 1,000 | No | | July - Sept 12 | DPR | General Contract | MARINE PARK - CONSTR OF AN EXTENSION TO SEBA PLGD | 100 - 500 | No | | July - Sept 12 | DPR | General Contract | PLGD ADJACENT TO P.S. 55 (DOUBLE NICKEL PLGD) | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | PUGSLEY CREEK PARK - CONSTR OF A BASKETBALL CT | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | ROCKS & ROOTS PARK - CONSTR OF ADDN'L FENCING, PATHS, SEATING & MISC SITE AMENITIES | 1,000 - 3,000 | No | | July - Sept 12 | DPR | General Contract | ROY WILKINS REC CENTER - SOUTH BUNKER | 1,000 - 3,000 | Yes | | July - Sept 12 | DPR | General Contract | STUYVESANT SQ PARK - PORTIONS OF FENCE & SDWLKS IN EAST SECTION | 3,000 - 10,000 | No | | July - Sept 12 | DPR | General Contract | WYCKOFF HOUSE - ROOF | 100 - 500 | No | | Oct - Dec 12 | DCAS | GC, Plumbing, HVAC, Elec | 1 Centre St., Mezz. City Veteran's Space | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DCAS | GC | 100 Centre Sidewalk and Steps Replacement | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DCAS | GC, Plumbing, HVAC, Elec | 125 Worth St., 6th Fl., Level 3 Renovation | 500 - 1,000 | Yes | | Oct - Dec 12 | DCAS | GC, Plumbing, HVAC, Elec | 125 Worth St.,10th Fl., Level 3 Renovation | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DCAS | HVAC | 253 Broadway Cooling Tower | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DCAS | GC, Plumbing, HVAC, Elec | 80 Centre St., 5th Fl. Man. Fam. Justice Center | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | BHT-BILLIE HOLIDAT THEATER RECONSTRUCTION | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DDC | Construction | INSTALL STORM SEWER IN WILLIAM AVENUE BETWEEN DITMARS STREET AND TIER STREET | 100 - 500 | No | | Oct - Dec 12 | DDC | Construction | INSTALLATION & RECONSTRUCTION OF CATCH BASINS, Q/K | 3,000 - 10,000 | No | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | MTC - RENOVATION OF FRIEDMAN THEATER | 500 - 1,000 | Yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | POPPENHUSE INSTITUTE- ELEVATOR & ADA BATHROOM | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | RETROFIT/UPGRADE OF ASPHALT PLANT AT HAMILTON AVE. | 3,000 - 10,000 | No | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | SHCC SITE PLAN & PH 1 CONS | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DDC | Construction | TV INSPECTION AND CLEANING - CITYWIDE | 1,000 - 3,000 | No | | Oct - Dec 12 | DDC | Plumbing, HVAC, Elec, GC | WEST FARMS BRANCH LIBRARY - EXT. & INT. DOORS | 100 - 500 | Yes | | Oct - Dec 12 | DEP | Gen Const | Clearview Pump Station | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DEP | Gen Const | Delaware Rondout Aqueduct
(CDA-FP1) | 100,000+ | No | | Oct - Dec 12 | DEP | Gen Const | DPR Clubhouse Teeboxes Parking Lot | 25,000 - 50,000 | Yes | | Oct - Dec 12 | DEP | Gen Const | Flushing Bay CSO Flow Metering | 1,000 - 3,000 | No | | Oct - Dec 12 | DEP | Gen Const | Kensico Reservoir Sediment Dredging | 10,000 - 25,000 | No | | Oct - Dec 12 | DEP | Gen Const | Paerdegat Basin Dredging | 25,000 - 50,000 | No | | Oct - Dec 12 | DEP | Gen Const | Rikers Island N. Pump Station | 3,000 - 10,000 | Yes | | Oct - Dec 12 | DEP | Gen Const | Security and Maintenance of Bklyn/Queens Shafts, C545J-2 | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DEP | Gen Const | St. Albans Pump Station | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DOT | Construction | Bryant Ave/Amtrak (Bronx) | 3,000 - 10,000 | No | | Oct - Dec 12 | DOT | Construction | BSHP/Mill Basin | 100,000+ | No | | Oct - Dec 12 | DOT | Construction | Trans Manhattan Expressway Connection | 8,000 - 12,000 | No | | Oct - Dec 12 | DPR | General Contract | AMENDOLA PLAZA | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | ASTORIA PARK - ROOF @ THE BATHHOUSE | 1,000 - 3,000 | Yes | | Oct - Dec 12 | DPR | General Contract | BOWNE PARK - CONSTR OF A BOCCE COURT | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | CONEY ISLAND BEACH - CONSTR OF ENTRANCE GARDENS & SITTING AREAS | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | DIMATTINA PARK - DOG RUN | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | FORT TOTTEN - STABILIZATION OF WILLETS FARMHOUSE (BLDG 211) | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | GRAND AVE PLGD | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | GRANT AVE PARK - CONSTR OF NATURAL AMPHITHEATRE/SPRAY SHOWER, MULTIPURPOSE RECREATIONAL FIELD & MISC SITE WORK | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | GRAVESEND PARK - COMFORT STATION | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | JUNIPER VALLEY PARK - CONSTR OF A BOCCE CT | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | LINCOLN TERRACE PARK - TENNIS COURTS | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | MARINER'S HARBOR PLGD - CONSTR OF SKATE PARK | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | MARINERS MARSH - CONSTR OF BARRIER RAIL, PAVEMENTS, LANDSCAPE & MISC SITE WORK | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | MURRAY PLGD - PARK ENTRANCE, SITTING AREA, PLAZA, PLANTINGS & PORTIONS OF DOG RUN | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | PELHAM BAY PARK DOG RUN | 0 - 100 | No | | Oct - Dec 12 | DPR | General Contract | PLANTING OF NEW & REPLACEMENT STREET TREES, IN CB 2 IN THE BOROUGH OF BROOKLYN | 100 - 500 | No | | Oct - Dec 12 | DPR | General Contract | RECONSTRUCTION & STABILIZATION OF RETAINING WALLS & SEA WALLS | 3,000 - 10,000 | No | | Oct - Dec 12 | DPR | General Contract | RECONSTRUCTION OF PLAY EQUIPMENT, SAFETY SURFACING, HANDBALL COURTS, BASKETBALL COURTS, ETC. IN VARIOUS LOCATIONS IN THE BOROUGH OF QUEENS | 1,000 - 3,000 | No | | Oct - Dec 12 | DPR | General Contract | SUNSET PARK - SPRAY SHOWER | 500 - 1,000 | No | | Oct - Dec 12 | DPR | General Contract | VAN NEST PARK - PLGD | 1,000 - 3,000 | No | | Jan - Mar 13 | DOT | Comp | Comp Rehab of 10 Bridges, Bronx & Manhattan | 3,000 - 10,000 | No | | Jan - Mar 13 | DOT | Construction | Component Rehabilitation of Bridges (Construction When & Where) | 3,000 - 15,000 | No | | Jan - Mar 13 | DOT | Construction | Protective Coating of Various Bridges in the Bronx | 3,000 - 10,000 | No | | Jan - Mar 13 | DPR | General Contract | CONCEPT PLAN FOR RECONSTR OF LUTHER GULICK PLGD (M065) | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | General Contract | CONSTR OF MELROSE COMMONS PK (HPD SITE #32) | 3,000 - 10,000 | No | | Jan - Mar 13 | DPR | General Contract | IDLEWILD PARK - CONSTR OF A NATURE CENTER | 3,000 - 10,000 | No | | Jan - Mar 13 | DPR | General Contract | M.FIDLER/WYCKOFF HOUSE PARK - WYCKOFF-DURLING BARN (REASSEMBLY & RECONSTR) | 3,000 - 10,000 | Yes | | Jan - Mar 13 | DPR | General Contract | RAMON APONTE PARK | 1,000 - 3,000 | No | | Jan - Mar 13 | DPR | General Contract | WHITE PLGD | 1,000 - 3,000 | No | | Apr - Jun 13 | DEP | Electrical | 26Ward Preliminary Treatment & Residual Handling Bldg, Electrical | 10,000 - 25,000 | Yes | | Apr - Jun 13 | DEP | HVAC | 26Ward Preliminary Treatment & Residual Handling Bldg, HVAC | 3,000 - 10,000 | Yes | | Apr - Jun 13 | DEP | Plumbing | 26Ward Preliminary Treatment & Residual Handling Bldg, Plumbing | 1,000 - 3,000 | Yes | | Apr - Jun 13 | DEP | Gen Const | 26Ward Preliminary Treatment & Residual Handling Bldg, Structures & Equipment | 50,000 - 100,000 | Yes | | | DEP | General | Job Order Contract Expense, Region 1- General | 1,000 - 3,000 | | | | DEP | Electrical | Job Order Contract, East Region, Electical | 3,000 - 10,000 | |
|  |