Email a Friend
NYC Department of Housing Preservation & Development
Architects/Engineers

Standard Specifications

The following are HPD's standard specifications for private architects and engineers that are performing work for HPD.

Most documents on this page are available in .PDF format. To download and print these documents, you will need the latest copy of the Adobe Acrobat Reader. This program can be downloaded for free from this link: "Acrobat and the Web."

Table of Contents
You may also download the table of contents as a Microsoft Word document by clicking here.

DIVISION SCOPEOF WORK  (Microsoft Word) 1 through 34
DIVISION 1 GENERAL REQUIREMENTS  
Section 1A Specific Requirements (January 2010) 1A-1 through 1A-9
Section 1D Asbestos Removal Supplementand Asbestos Inspection Report(s) 1D-1 through 1D-23
Section 1E Supplement of RequirementsFor Adaptable Apartments (General Construction, Plumbing and Electrical)(Revised - January, 2010) 1E-1 through 1E-8
Section 1F Supplementof Handicapped Requirements for Public Areas (General Construction, Heating and Ventilation, Plumbing and Electrical)(Revised - January, 2010)

1F-1 through 1F-4

Section 1J Lead Hazard Reduction 1J-1
Section 1K Construction Waste Management 1K-1 through 1K-5
     
DIVISION 2 SITE WORK AND DEMOLITION  
Section 2A Demolition 2A-1 through 2A-2
Section 2B Site Work, Excavation,Backfill and Landscaping 2B-1 through 2B-6
     
DIVISION 3 CONCRETE  
Section 3A Concrete 3A-1 through 3A-4
     
DIVISION 4 MASONRY  
Section 4A Masonry 4A-1 through 4A-10
Section 4B Masonry Coatings 4B-1 through 4B-4
     
DIVISION 5 METALS  
Section 5A Miscellaneous and Ornamental Metals 5A-1 through 5A-10
Section 5B Metal Stairs 5B-1 through 5B-6
Section 5C Structural Steel 5C-1 through 5C-6
Section 5D Composite Floor Deck 5D-1 through 5D-3
     
DIVISION 6 CARPENTRY  
Section 6A Rough Carpentry 6A-1 through 6A-11
Section 6B Finish Carpentry 6B-1 through 6B-12
     
DIVISION 7 INSULATION AND MOISTURE PROTECTION  
Section 7A Insulation 7A-1 through 7A-11
Section 7B Roofing and Dampproofing 7B-1 through 7B-10
Section 7C Skylights 7C-1 through 7C-2
Section 7D Weather-stripping, Saddlesand Caulking 7D-1 through 7D-3
Section 7E Sheet Metal Work 7E-1 through 7E-4
Section 7F Cornices 7F-1 through 7F-4
Section 7G Sprayed Fireproofing 7G-1 through 7G-6
Section 7H Aluminum Siding 7H-1 through 7H-2
     
DIVISION 8 DOORS, WINDOWS AND GLASS  
Section 8A Metal Doors and Frames 8A-1 through 8A-5
Section 8B

Solid Core Wood Doors

8B-1 through 8B-3
Section 8B Hollow Core Wood Doors 8B-1 through 8B-3
Section 8C Aluminum Double Hung Windows 8C-1 through 8C-9
Section 8C Aluminum Project-In Windows 8C-1 through 8C-5
Section 8C Fire Rated Steel Windows 8C-1 through 8C-5
Section 8C High Efficiency Aluminum Double Hung Windows 8C-1 through 8C-12
Section 8D Finish Hardware 8D-1 through 8D-12
Section 8E Glass and Glazing 8E-1 through 8E-3
Section 8F Aluminum Entrance Work 8F-1 through 8F-6
Section 8G Aluminum Store Fronts and Doors 8G-1 through 8G-3
Section 8H Rolling Service Doors 8H-1 through 8H-3
Section 8K Steel Entrance Work 8K-1 through 8K-7
     
DIVISION 9 FINISHES  
Section 9A Plastering 9A-1 through 9A-4
Section 9B Gypsum Drywall and TileBacker Board 9B-1 through 9B-6
Section 9C Ceramic / Porcelain Tile 9C-1 through 9C-5
Section 9D Resilient Flooring 9D-1 through 9D-3
Section 9E Chemical Cleaningand Anti-Graffiti Coating 9E-1 through 9E-2
Section 9F Painting and Decorating 9F-1 through 9F-8
     
DIVISION 10 SPECIALTIES  
Section 10A Bathroom Accessories 10A-1 through 10A-4
Section 10B Mailboxes and ElectronicPostal Release 10B-1 through 10B-4
Section 10C Toilet Room Accessories 10C-1 through 10C-4
Section 10D Toilet Partitions 10D-1 through 10D-5
Section 10F Fabric Awning 10F-1 through 10F-3
     
DIVISION 11 EQUIPMENT  
Section 11A Equipment 11A-1 through 11A-5
Section 11B Kitchen Cabinets and Countertops 11B-1 through 11B-9
Section 11C Trash Compactor Equipment 11C-1 through 11C-4
Section 11D Compactor Chute 11D-1 through 11D-3
Section 11E Metal Chimney (Exterior) 11E-1 through 11E-4
Section 11F Interior B Vent 11F-1 through 11F-2
     
DIVISION 14 ELEVATORS  
Section 14A Elevators 14A-1 through 14A-18
Section 14C Wheelchair lift 14C-1 through 14C-5
     
DIVISION 15 MECHANICAL  
Section 15A Heating and Ventilating 15A-1 through 15A-35
Section 15B Plumbing 15B-1 through 15B-25
Section 15C Fire Suppression System (Sprinklers) 15C-1 through 15C-15
     
DIVISION 16 ELECTRICAL  
Section 16A Electrical Work 16A-1 through 16A-28
Section 16B Building Surveillance Security System 16B-1 through 16B-9
Section 16C Fire Alarm System 16C-1 through 16C-20

Note: Changes to paragraph "GUARANTEES", applied to all Sections.

PHONE NUMBER:(212) 863-7486

  


I am a...
Learn About...
Frequently Asked Questions (FAQ)
 
View Site Map