New Codes Rules

The New York City Charter empowers the Buildings Commissioner to write rules that help implement provisions under the New NYC Construction Codes. All rules are prepared according to the City Administrative Procedure Act (CAPA), which includes publishing a draft copy of the rule, providing information about a public hearing on the matter, and submitting written comments. Once adopted, a rule carries the force and effect of law. Please email any New NYC Construction Codes questions to our Codes experts at: ConstructionCodes@buildings.nyc.gov.

Rules Chart
The chart below provides up-to-date information on rules that are considered working drafts, rules that have received preliminary Law Department approval or rules that have received final Law Department approval. To read the full text of any rule, click on the specific rule in the chart below. We will update this information as the status of a rule changes and as new rules are drafted.

 Adobe® Acrobat Reader is required to read the below rules.

Title

Status

Hearing Info

Effective Date

Approved Agencies Amendment - Progress Inspector Insurance

Proposed

2/4/09
3:00 PM
3rd Fl. Conf. Room
280 Bdway

 

Building Water Conservation Reports, Plans and Waterless Urinals

Proposed

5/19/09 9:00AM
6th Fl. Training
Room
280 Bdway

 

Waiver of Certain Construction Documents Required to be Submitted by Registered Design Professionals for Selected Plumbing Work Amendment

Proposed

5/20/09 10:00AM
6th Fl. Training
Room
280 Bdway

 

Low Pressure Boiler Inspection and Filing Requirements, Penalties and Waivers

Proposed

6/18/09 1:00PM
6th Fl. Training
Room
280 Bdway

 

Fire Alarm Wiring Repeal and Re-promulgation - Fire Alarm Wiring and Power Sources

Proposed

7/8/09
9:00AM
6th Fl. Training
Room
280 Bdway

 

Existing Buildings

Final

 

 7/1/08

Site Safety Coordinator

Final

 

 7/1/08

Surveyor Compensation

Final

 

7/1/08
 

Fees

Final

 

 7/1/08

Violation Reclassification & Certificate of Correction

Final

 

7/1/08

Special Inspections

Final

 

7/1/08

Approved Agencies

Final

 

7/1/08

Sign Off

Final

 

7/1/08

Flood Resistant Construction - Letters of Map Change

Final

  

 7/14/08

Flood Resistant Construction - Alteration Applications

Final

 

7/14/08

Fire Alarm Wiring

Final

 

9/2/08

Masonry Equivalent Walls

Final

 

9/2/08

One-Way Emergency Voice Communication Systems

Final

 

9/2/08

Impact Resistant Stair

Final

 

9/2/08

Waiver of Certain Documents

Final

 

9/2/08 

Hoisting Machine Operators Class C

Final

 

10/22/08

Transition for TR1

Final

 

10/25/08

FEMA Letters of Map Revision

Final

 

11/14/08

Site Safety

Final

 

1/3/09

Licensing

Final

 

2/20/09

Green Roof - Solar Abatement

Final

 

3/12/09

Adjudications

Final


3/16/09

Periodic Inspection of Exterior Walls and Appurtenances of Buildings Amendment

Final

 

3/27/09

Fees Amendment

Final

 

4/18/09

Violation Reclassification Amendment

Final

 

5/3/09 

One-Way Emergency Voice Communication Systems Amendment

Final

 

5/17/09

NFPA 13


Final

 

6/11/09 

Fuel Gas Code ASME BPVC Edition Amendment


Final

 

6/11/09

Public Challenge of Department Decisions

Final

 

7/13/09

has printed copies of the Electrical Code, Building Code, and many other publications.
BIS Web Query - Buildings Information System

BOROUGH
HOUSE #
STREET NAME:


Statistics

 BUILD Top 10
 Weekly Reports
 Monthly Reports
 Snapshot Reports
 OP-98 Rejections
Right Now At Buildings
Practice Green

 Conserve Energy!
 Conserve Water!
 Energy Code
 Green Building
 Green Roof &
Solar Panel

 PlaNYC 2030
 
Copyright 2010 The City of New York Contact Us | FAQs | Privacy Statement | Site Map