|
TR1 Technical Report: Statement of Responsibility
Filed to identify responsibility or to report the results of completed inspections or tests.
Download Form (422 kb) - Required starting October 1st, 2009.
Download Instructions (22 kb)
New TR1 Required October 1, 2009 (61 kb)
Download Old 1968 Form (236 kb) - For use only with jobs approved prior to June 30th, 2008.
Download Old 1968 Instructions (20 kb)
|
|
TR2 Technical Report: Concrete Pouring, Sampling and Compression Test Cylinders
Filed with TR-1 (Statement of Responsibility) upon completion of required inspections/tests. Learn more about the new requirements.
Download Form (123 kb)
Download Instructions (16 kb) |
|
TR3 Technical Report: Concrete Design Mix
Filed to indicate results of tests and final design mixture for strength of controlled concrete. Learn more about the new requirements.
Download Form (89 kb)
Download Instructions (10 kb) |
|
TR4 Technical Report: Soil Inspection
Filed with TR-1 (Statement of Responsibility) upon completion of required inspections/tests.
Download Form (104 kb)
Download Instructions (10 kb) |
|
TR5 Technical Report: Pile Driving
Filed to indicate results of test report for pile driving.
Download Form (166 kb)
Download Instructions (18 kb) |
|
TR6 Technical Report: Periodic Inspection of Exterior Walls & Appurtenances
Must be accompanied by the Engineer and/or Architect's report.
Download Form (73 kb)
Download Instructions (28 kb)
|
|
TR7 Photoluminescent Report
Use this form to certify compliance with the Photoluminescent exit path marking requirements of Section BC 403.16, and 1 RCNY 1026-01, for high rise buildings constructed pursuant to the 2008 Building Code. This report may be completed only by an architect or engineer.
Download Form (165 kb) |