LAA1 Limited Alteration Application (Plumbing/Oil Burning/Fire Suppression Alterations)
This form must be completed by a Licensed Master Plumber, Licensed Oil Burner Installer or Licensed Fire Suppression contractor for approval of all minor plumbing / oil burner installations, sprinkler / standpipe work as permitted and/or repairs requiring permits in accordance with section 28-101.5 of the New NYC Construction Codes. This form replaces ARA1. To learn more, view the fact sheet.
Download Form (214 kb) Accepted until Dec. 4, 2009
Download Instructions (32 kb)
Download LAA Fees / Civil Penalties / Codes (23 kb)
Download New Form (274 kb) This will be the only version accepted beginning on December 7, 2009. Applicants may use either the new or current form versions until December 4, 2009.
Download New Instructions (35 kb)
|
|
|
OP98 This is a combined form from the former OP38 and OP39 (Notification of Proposed Self-certification of Plumbing Inspection/Test and Self-certification of Plumbing Inspection/Test).
Used by licensed master plumbers and licensed fire suppression contractors to indicate the date and time of inspection/tests.
Download Form (107 kb)
Download Instructions (25 kb)
Electronic Submission of OP98 Plumbing Form
|
|
|
OP128: Ordinary Plumbing Work Report
This form is to be used by Licensed Master Plumbers (LMP) to submit up to 20 jobs, on-going or completed the previous calendar month, in accordance with §28-105.4.4 Ordinary Plumbing Work. This completed report form must be signed and sealed by the LMP testifying all work is code compliant. This report of ordinary plumbing work shall be submitted no later than the 15th of the following month. To learn more, view the fact sheet.
Download Form & Instructions (185 kb)
|
|
|
OP129: Report on Testing of Secondary Backflow Prevention Device
This form is to be used to report the test that is required on all Internal (secondary) Backflow devices. Secondary devices are RPZ’s or Backflow’s used for cooling towers, boilers, medical equipment, etc. These secondary backflow devices are recorded by DOB not DEP. The LMP completes section one (1) and three (3) and the certified tester completes section two (2). No P.E. or R.A. is necessary on this form.
Download Form (86 kb)
|
|
|
B Form FP10 Dry Pipe Valve Tests
Submitted by the permit holder to indicate the work installed.
Download Form (101 kb)
|
|
|
B Form FP84 Standpipe Inspection Report
Submitted by the permit holder to indicate the work installed.
Download Form (126 kb)
|
|
|
B Form FP85 Sprinkler Inspection Report
Submitted by the permit holder to indicate the work installed.
Download Form (128 kb)
|
|
|
B Form FP86 Standpipe Fire Pump Test
Submitted by the permit holder to indicate the work installed.
Download Form (133 kb)
|