TR1 Technical Report: Statement of Responsibility
Use this form to identify responsibility or to report the results of completed inspections or tests.
 Download Form - Rev. 10/13
 Download Instructions 

Only for jobs approved prior to June 30th, 2008.
 Download Old 1968 Form - Rev. 7/08
 Download Old 1968 Instructions

Only for jobs submitted on or after December 31, 2014.
This form has been revised for the 2014 Codes and replaces the current form December 31. In order to assist you, below is a link to the revised form. Please note this form cannot be submitted to the Department prior to the effective date of the 2014 Codes, December 31.
 Download 2014 Form - Rev. 12/14
 Download 2014 Instructions


TR2 Technical Report: Concrete Pouring, Sampling and Compression Test Cylinders
File this form with the TR1 upon completion of required inspections/tests.
 Download Form - Rev. 10/09
 Download Instructions

TR3 Technical Report: Concrete Design Mix
Use this form to indicate results of tests and final design mixture for strength of controlled concrete.
 Download Form - Rev. 10/09
 Download Instructions
 
TR3P Technical Report: Concrete Design Mix
This form should be used by approved producers to indicate results of tests and final design mixtures for strength of controlled concrete. This Technical Report must be filed prior to permit issuance in accordance with the New York City Building Code, Chapter 19, Concrete. Trial mixture reports and/or field experiment results must be attached when submitting the TR3P. As a reminder, additional TR3P reports should be submitted as needed for additional trial mixes.
 Download Form - Rev. 6/11
 
TR4 Technical Report: Soil Inspection
File this form with the TR1 upon completion of required inspections/tests.
 Download Form - Rev. 7/08
 Download Instructions

TR5 Technical Report: Pile Driving
Use this form to indicate results of test report for pile driving.
 Download Form - Rev. 7/08
 Download Instructions

TR5H Technical Report: Helical Pile Installation
Use this form for Helical Pile installations.
This is a new form for the 2014 Codes and cannot be submitted to the Department prior to the effective date of the 2014 Codes, December 31.
 Download Form - Rev. 12/14
 Download Instructions

TR6 Technical Report: Periodic Inspection of Exterior Walls & Appurtenances
Must be accompanied by the Engineer and/or Architect's report.
 Download Form - Rev. 5/12
 Download Instructions

TR7 Photoluminescent Report
Use this form to certify compliance with the Photoluminescent exit path marking requirements of Section BC 403.16, and 1 RCNY 1026-01 for high rise buildings constructed pursuant to the 2008 Building Code.  This report may be completed by an architect or engineer.
 Download Form - Rev. 7/08

TR8 Technical Report Statement of Responsibility for Energy Code Progress Inspections
File  this form with the TR1 (upon completion of required inspections/tests for jobs in compliance with the NYCECC.