BPP-1 Checklist for Alt-3 in lieu of plans This is a checklist for Alt-3 in lieu of plans. Submit this form as part of the Builders Pavement Plan application.
Download Form - Rev. 11/04 |
|
BPP-5 Authorization to the Department of Transportation Form Use this form to give authorization to the Department of Transportation to issue a Construction Permit for the Builders Pavement Plan Work. Submit this form as part of the Builders Pavement Plan application.
Download Form - Rev. 10/03 |
|
BPP-8 Request items for Builders Pavement Plan Signoff Use this form to request a Builders Pavement Signoff.
Download Form - Rev. 10/03 |
|
BPP-9 Request for Builders Pavement Field Inspection Use this form to request a Builders Pavement Field Inspection. Submit this form as part of the Builders Pavement Plan application.
Download Form - Rev. 10/03 |
|
BPP-11 Affidavit as to Roadway Pavement and/or Sidewalk and Curb Construction This fom is required to obtain a signoff of a BPP application. It must be prepared by an architect or engineer.
Download Form - Rev. 9/03 |
|
BPP-15 Application for Waiver of Builders Pavement Requirements Applicable to some jobs requiring waivers of all improvements or partial improvements. At pre-filing, an architect/engineer should file these forms with the AI-1 form for justification as part of the BPP application.
Download Form - Rev. 8/04 |
|
BPP-16 Application for Waiver of Curb Alignment and/or Sidewalk and Curb Applicable to some jobs requiring waivers of all improvements or partial improvements. At pre-filing, an architect/engineer should file these forms with the AI-1 form for justification as part of the BPP application.