2013 Buildings Bulletins Legend: R if Rescinded |
Issuance
Date | Type/
Bulletin # | Relevant Code Sections | Purpose |
February 6, 2013 | Technical /
Buildings Bulletin
2013-001 | HMC 27-2004(2)(21)
HMC 27-2070
BC 1202.1 (definition of “habitable space”)
BC 1202.1 (definition of “kitchenette”)
BC 1208.1
BC 1211.2
MDL 4.18
MDL 31.2.d | This bulletin clarifies the enclosure requirements for kitchenettes and minimum dimension for living room and habitable space in a multiple dwelling. |
March 19, 2013 | OTCR /
Buildings Bulletin
2013-002 | BC 1901
AC 28-113.2.2
BC 703
BC 803
BC 714.2 | This document establishes design and acceptance criteria of externally bonded fiber-reinforced polymer (FRP) systems for structural repair and upgrade of concrete and masonry elements. |
March 19, 2013 | OTCR /
Buildings Bulletin
2013-003 Supersedes:
OTCR Buildings Bulletins 2011-005 and 2011-020 Related to Buildings Bulletin 2010-027 | AC 28-113.2.3
MC Chapter 12
MC 1206
AC 1704.13
AC 1704.15
PC 608
PC Chapter 7
PC Chapter 11
PC Appendix C | This document establishes acceptance criteria for the use of polypropylene (“PP”) piping systems in hydronic piping, irrigation systems and water recycling distribution piping systems as alternative materials in the 2008 NYC Construction Codes. |
March 25, 2013 | OTCR /
Buildings Bulletin
2013-004 Supersedes:
OTCR Buildings Bulletins 2012-005 | AC 28-113.2.3
FGC 303.3
FGC 503.4.2
FGC 503.8
FGC 601.3
FGC 503.2.2
PC 804.1 | This document establishes acceptance criteria for gas-fired direct vent space-heating appliances used for providing heat in rooms for sleeping purposes in accordance with the 2008 NYC Construction Codes. |
April 26, 2013 | Technical /
Buildings Bulletin
2013-005 | HMC 27-2004
HMC 27-2077
28 RCNY 25-51
MDL 66 | This document clarifies that hostel-type accommodations are considered to be illegal rooming units, pursuant to Section 27-2077 of the Housing Maintenance Code, except for certain grandfathered units and units operated by non-profit institutions and city agencies. |
April 29, 2013 | Technical /
Buildings Bulletin
2013-006 | FGC 102.4
FGC 404.1(4)
FGC 404.1(5)
FGC 202
FGC 404.3
FGC 406
AC 28-101.4.3
AC 28-112.3 | This bulletin establishes procedures and requirements for work involving fuel gas distribution piping located within fire-resistance-rated construction in existing buildings undergoing alterations, replacement and repairs. |