Air Permitting Forms and Instructions

The goal of the New York City Air Pollution Control Code (Air Code) (PDF) is to preserve, protect and improve the air resources of the City. The City’s policy is that every person be entitled to air that is not harmful to life, health and enjoyment of his or her property.


Online Application Search & Login

DEP’s Clean Air Tracking System (CATS) is an online process for submitting applications.

Name Description
CATS Information Search

DEP Air Permit search for a property using one of the following

  • DEP application ID
  • Borough, Block and Lot
  • Premise Address
Create a New Account

To obtain a Boiler Registration/Certificate of Operation, new applicants must register to create an account in CATS. To create an online account:

  • Register as a general user (owner/agent/licensed professional)
  • If you are a licensed Professional (PE, RA, LMP or LOBI); proceed with process to register for a Professional Role.
Login

CATS allows users to process new applications, renewals, amendments and all other air permit related actions. See the sections below for specific instructions on the submission process.

Account Setup CATS procedures for account setup as a General User and Licensed Professional
Fee Schedule Fee Schedule for all processes

Filing Instructions & Other related forms


Fossil Fuel Burning Boilers and Water Heaters

Name Description
CATS Filing Instructions
Boiler Filing Applicability Determination of filing requirements for boilers and water heaters
Boiler Registration I Procedures for Boiler Registration for boilers 350,000 BTU/hr. to less than 2.8 million BTU/hr
Boiler Registration II Procedures for Boiler Registration for boilers 2.8 million BTU/hr. to less than 4.2 million BTU/hr
P.E. Certification Letter for CATS If a new Boiler Registration II application is not submitted by a registered Professional Engineer, then the PE Certification Letter for CATS filing is required
P.E. Certification Letter for Amendment If an amendment for Boiler Registration II is not submitted by a registered Professional Engineer, then the PE Certification Letter for Amendment is required
Work Permit Application Procedures for a Work Permit Application for boilers 4.2 million BTU/hr. and above
Work Permit Extension Procedures for filing a Work Permit Extension
Amendment Procedures for filing an Amendment
Affidavit Procedures for filing an Affidavit
Boiler Inspection Request Procedures for filing a Boiler Inspection Request (Original and Renewal) to obtain a Certificate of Operation
CATS Payment Procedures for submitting a payment in CATS
Boiler Related Forms and Documents
Accepted Boiler Equipment List DEP Boiler Equipment - List of equipment accepted by the DEP for use in NYC.
Equipment Approval Directive Equipment Approval Directive - as of August 1, 2017: DEP will no longer accept new equipment acceptance applications.
Compliance Certification Boiler and Burner Compliance Certification - Submitted by the filling PE to certify equipment (bare boiler, burner, assemblies, custom installation and control) not accepted by DEP will comply with all applicable regulations.
Custom Equipment Compliance Certification Form Custom Equipment Compliance Certification - Submitted by the filing PE to certify equipment not accepted by DEP will comply with all applicable regulations.
Stack Adequacy Form Draft calculations are required for a new boiler, induced draft fan or chimney and in accordance with the procedures in 2009 ASHRAE Fundamentals Chapter 21 and 2012 ASHRAE Systems and Equipment Chapter 35.
Stack Adequacy Form Instructions Instructions on how to determine stack adequacy using the Department approved method.
Annual Tune-up Guidelines Standard procedures for boiler tune-up.
Annual Tune up Recordkeeping Form All boilers that are equal to or greater than 2.8 million Btu/hr must have annual tune-ups and records of the tune-up using these forms must be retained for a minimum of 5 years.
Annual Performance Test Worksheet
Letter of Authorization Owners need to provide a Letter of Authorization when changing a Professional Engineer, Registered Architect or Installer.
Installer Statement Installer must submit the Installer Statement when the installer is not named on the Work Permit Application form or the owner changed the Installer.
FAQ Frequently Asked Questions for Boilers
Fuel Equivalency Forms
#4 Fuel Oil and Natural Gas Combustion Equivalent to #2 Fuel Oil for New Applications Fuel equivalency form is used for a dual fuel boiler to demonstrate that the annual emissions based on fuel consumption of natural gas and #4 fuel oil are equivalent to #2 fuel oil.

Industrial Processes / Generators / Dry Cleaning

NameDescription
CATS Filing Instructions
Industrial Process Questionnaire Questionnaire that is to be submitted to the Department should you require assistance in determining which application process you should follow.
General Registrations

Procedures for filing a Registration of a process source:

  • General Registration for operation of equipment with Environmental Rating C that produces a flowrate of equal or greater than 100 scfm and less than 2000 scfm
  • Mobile food trucks with auxiliary engines
  • Char broilers that cook more than 875 pounds of meat per week.
Gas Station Registration Procedures for filing a Gas Station Registration
Combustion Registration Procedures for filing a generator, engine or other combustion source registration
Engine/Generator Filing Threshold Filing requirements for engines and generators. Units below the listed thresholds do not need to be filed.
Opacity Certification Opacity Certification by the Professional Engineer
Method 9 Opacity Certification Method 9 Opacity Certification Method 9 Opacity Certification required for all generators regardless of EPA Tier. This form should be completed and attached with Inspection Request for original and triennial renewals through CATS. First timing filing of EPA Tier 4 or equivalent generators do not need an opacity certification. Generators permitted as a registration must conduct an opacity test but do not need to submit the results to DEP
Work Permit Application Procedures for filing a Work Permit Application
Work Permit Extension Procedures for filing a Work Permit Extension
Inspection Request Procedures for filing an Inspection Request (Original and Renewal) to obtain a Certificate of Operation
Amendment Procedures for filing an Amendment
Affidavit Procedures for filing an Affidavit
Cancellation Procedures for filing a Cancellation
Industrial Related Forms and Documents
Non-Perc Form for Posting Notice Dry cleaning establishments are required to post a sign listing the primary chemicals used in the facility.
Perc Form for Posting Notice Dry cleaning establishments are required to post a sign listing the primary chemicals used in the facility.
Perc SDS Safety Data Sheets for Perchloroethylene dry cleaning solvents
Alternative Solvent SDS Safety Data Sheets for all NYS DEC approved alternative dry cleaning solvents

Demolition Form