|
|
 |

 |

Design + Construction Excellence: How the City is Improving its Capital Program 2008
DDC leads the citywide Design and Construction Excellence program, working in tandem with City Hall and other City agencies to ensure the program's success. This publication is our third report on Design and Construction Excellence, and it reviews and explains the policy changes we have implemented, as well as some of our resulting designs currently on the boards or in construction.
Download PDF
|
 |

 |

Design and Construction Excellence July 2007 Progress Report
Under the direction of Mayor Michael R. Bloomberg, DDC leads the citywide Design and Construction Excellence program. This is our second annual report on Design and Construction Excellence, and it reviews the policy changes we have implemented, as well as some of our resulting designs currently on the boards or in construction. 2007
Download PDF
|
 |

 |

2006 Agency Brochure To keep our client agencies, consultants and constituents informed of new programs and projects, DDC issued an agency brochure in 2006. It provides a snapshot of our finances and details the high-quality work we provide to our clients. Also included in this publication are descriptions of our internal functions, our staffing organizational chart and a brief listing of project/agency awards received since 1997.
Download PDF
|
|
|
 |

 |

10th Anniversary New York Construction
On the agency's 10th anniversary, New York Construction invited us to prepare a supplement commemorating our accomplishments. DDC Year 10 highlights special projects and our design and construction innovations. 2007
Download PDF
to the top
|
 |
| |
 |

Guides: Design Consultants Guide | Universal Design NY2
|
 |
| |
 |

 |

Design Consultant Guide
The Design Consultant Guide describes all the design phases of a DDC structures project, as well as all of the services and deliverables that may be required in those phases. It also includes a description of our expectations in the Design Criteria section, and guidance on the approvals our consultants may be required to obtain in the regulatory approvals section. The general information and forms section has vital information on doing business with us. This document is part of the contract with design consultants. 2003
Download PDF
|
 |
|
|
 |

 |

Universal Design New York 2
DDC is responsible for approximately one billion dollars worth of construction in New York City every year. This volume mandates that we take responsibility for the many ways New Yorkers interact with the built environment. Universal Design 2 reviews values important to the design of public facilities, including equitable use, flexibility in use, perceptible information, and low physical effort. 2003
Download PDF
to the top
|
 |
|
 |

Sustainable Guides: High Performance Infrastructure Guidelines | High Performance Building Guidelines
|
 |
 |

 |

High Performance Infrastructure Guidelines
This guidebook was published in conjunction with the Design Trust for Public Space, and details sustainable strategies, called “best management practices,” to be used in road, site and water management projects. Called right–of-way infrastructure projects, they affect environmental, social, and economic factors in the city. Our Guidelines are intended for planners, designers, engineers, public officials, as well as for DDC staff. 2005
Download PDF
|
 |
 |

 |

High Performance Building Guidelines
This guidebook was the most recognized first step taken in what is now a heralded sustainable program for buildings in New York City. These guidelines review sustainable strategies in the indoor environment, in site design, in water management, in material and product selection, and much more. Although they were written for the design and management of public facilities, our guidelines have been in demand from professionals in all parts of the field. 1999
Download PDF
to the top
|
 |
 |

Sustainable Reports & Manuals: Local Law 77 | Efficient Lighting | Waste Manual | Heat Pump Manual
|
 |
 |
  |

Local Law 77 DDC Ultra-Low Sulfur Diesel Manual
This document is an introduction and resource handbook for
understanding New York City Local Law 77. This law requires the use of
ultra-low sulfur diesel (ULSD) and "best available technology" (BAT) for
reducing emissions from non-road equipment used on City construction
projects...
Download PDF | Visit CityStore
|
 |
 |

 |

Manual for Quality, Energy Efficient Lighting
This document is an introduction and resource handbook about
quality lighting and energy efficient solutions for New York City
projects. Its basic goal is to assist designers and project manager
personnel to understand the current energy codes and meet or exceed them
with appropriate and creative designs...
Download PDF | Visit CityStore
|
 |
| |
 |

 |

Construction & Demolition Waste Manual
This
document is an introduction and resource handbook for construction and
demolition (C&D) waste reduction, reuse and recycling on New York City
Projects. Its basic goal is to assist design and construction
professionals...
Download PDF
|
 |
| |
 |


|

Geothermal Heat Pump Manual
This
document was written as an introduction and 'hands on' manual for project
managers and consulting engineers working for the City of New York who are
considering the use of geothermal systems to reduce energy costs on their
building projects...
Download PDF | Visit CityStore
|
 |
| |
 |


|

DDC Cool & Green Roofing Manual
This document is an introduction to environmental roof strategies, both reflective and planted roofs. Its basic goal is to evaluated the effectiveness of these strategies for New York City projects. The guidelines are addressed to all the participants in projects for the NYC Department of Design and Construction (DDC) – administrators and managers from DDC, architects and their consultants, and construction managers...
Download PDF
|
 |
| |
 |

 |
Sustainable Urban Site Design Manual
This document is an introduction to more environmentally, economically, and socially responsible urban site design practices for New York City capital projects. The contents are addressed to the broad audience of NYC DDC project participants, from City administrators to architects and their consultants, to construction managers, contractors, and facility personnel…
Download PDF
Download Adobe Acrobat Reader
Note: All PDF documents will open in a new browser window.
to the top
|
 |
| |